EPA CLEANUP ACTIVITIES

Basic Site Information

The Upland Soil Areas excavation is

complete with the exception of one
small area (Area Al) totaling ap-
proximately 20 cubic yards (CY).
Mechanical dredging of approxi-
mately 19,300 CY of impacted sedi-
ment (containing mercury/lead/other
metals) in Area A and the Island
Area is in progress.

Boroiiph of Pompton Lakes

http://www.pomptonlakesgov.com

Questions? Please Contact:

EPA Remedial Project Manager

Perry Katz

(212)637-4426

katz.ira-perry@epa.gov

EPA Community Involvement
Coordinator

Pat Seppi

(646)369-0068

seppi.pat@epa.gov

This is EPA's 31st update to inform the community of the progress
of activities related to the portion of the Pompton Lakes Study Area
known as the Upland Soil Areas and the 3 acres of the lake
(designated Area A and the Island Area) that will be mechanically
dredged. The work is being performed by The Chemours Company
FC, LLC. with EPA/NJDEP oversight.

ACTIVITIES—WEEK OF JANUARY 2nd

~	No additional transport/disposal of impacted material this week.

~	Transported/disposed 1,949 loads of impacted material excavat-
ed soil/dredged sediment) a/o December 22nd.

~	Excavation of soil at Uplands Soil Area Al complete except for
that portion of soil near sewer pipe.

~	Continued electrical work to support 2017 dredging activities

~	Continued perimeter monitoring—data on website: http://
www.pomptonlakesworks.com/pompton-lake-project/
environmental-monitoring/

~	No exceedances of dust/ mercury vapor(/turbidity) action levels
during monitoring associated with site activities

UPCOMING ACTIVITIES—WEEK OF JANUARY 9th

~	Continue to treat/discharge water from site operations

~	Initiate reconfiguration of site, including equipment/electrical
work/on-site haul road in preparation of 2017 dredging work

NOTES:

~	Dredging work scheduled for 2016 has been completed

~	Remaining work includes removal of a small volume of soil in
Upland Soil Area Al and ecological layer placement in the Is-
land Area/Area A. This work will be completed during the 2017
dredging season.

~	With no further soil excavation/dredging occurring, turbidity and
air monitoring have been suspended until the start of the 2017
dredging season.

~	A small work crew will be on- and off-site preparing the site for
the 2017 dredging season.


-------