SCENARIO C
UJ
o
-j a
UJ H
f? ®
w
u_ 111
o
o
s
a.
O
UJ
(0
3
• 2
o
c
u.
to
«
O
a
o
t
u. t
O
c
CL
0
Q
<
Ll
O
Ll.
o
w
5000
4000
3000
2000
o
- 0.72
1000
k|
LL
o
oc
a.
(0
O,
-1000
•2000
1.77
_L
MATURE
PRODUCT COST
($1500/kW)
ENTRY
LEVEL COST
(S3000'kW)
FUEL CELL
LEVEL COST
IS ECONOMICAL
J.
_L
X
FUEL CELL
IS NOT
ECONOMICAL
_L
0 2 4 6 8 10
COST OF BUYING ELECTRICITY FROM GRID -e/kWh
Figure 4-8, Economic Results for Scenario C
>
fc
a
a:
5 £
uj 5
-i >
uj a.
s-
£
O
O
l
10
8
6
BASED ON STRAIGHT'ELECTRICITY COSTS W/O CREDITS
INCLUDES HEAT RECOVERY
$300Q/kW
S1500/KW
WITH SCR
EXHAUST
CLEANUP
NO EXHAUST
CLEANUP
FUEL CELL '*
ENERGY
CONVERSION
SYSTEM
LEAN-BURN INTERNAL "
COMBUSTION ENGINE
ENERGY CONVERSION
SYSTEM
Figure 4-9. Comparison of Fuel Cell to Internal Combustion Engine Energy Conversion System
-26-
-------
4.3 Environmental Assessment
Table 4-1 provides the basis for calculating the net emissions reduction from the example WWT referred to
previously. Typical emissions from an existing gas boiler and the fuel cell, both operating on the ADG, are
listed. These emissions used are characteristics are used to calculate the total site emissions, For purposes of
calculating the offsets, electric utility emissions are based on a pulverized coal plant burning Illinois No. 6
coal employing flue gas desulfurization meeting NSPS federal requirements for NOx and SOx; CO emissions
are typical of a coal fired boiler. Site heat rates were approximated assuming a site power rating of approxi-
mately 3 MW and allowance for gas compression losses where applicable.
Table 4-1, Typical Waste Methane and Coal Emissions
(Basis for Analysis)
Emissions ~ ke/c.cal x 10"13
CT O
SYSTEM
SITE HEAT RATE (kg.cal/
kVVh)
co2
NOx
SOx
CO
Existing Gas Boiler
N/A
2088
3.6
4.68
0.684
Fuel Cell
2495
2088
0.0306
0
0.0432
Pulverized Coal Plant
(Illinois No. 6 Coal)
2520
4590
10.8
21.6
0.54
f1) Equivalent to the fyS content of the ADG fuel gas fed to boiler
For the 0.425 MSCFD example, the emissions of the fuel cell as compared to the conventional case were
calculated and shown as Table 4-2. This case is illustrative of the Commercial Conceptual Design discussed
in Section 4.4.
-27-
-------
Table 4-2. Breakdown of Total Emissions Due to WVVT Plant (Conventional vs. Fuel Cell)
500.000 Liters/Hour f0.425 MMSCFD) ~MG/YR
(EQUIVALENT TO 1200 kW OF FUEL CELLS
LOCATION
CONVENTIONAL
WWT with
Fuel Ceils W
DELTA
(CONVENTIONAL
CASE MINUS FUEL
. CELL CASE)
ON-SITE
co2
5266
5655
-389
NOx
. 9.1
0.7
8.4
SOx
1.2
0.1
I.I
CO
1.7
0.1
1:6
OFF-SITE UTILITY
(COAL)
C02
16830
6667
10163
NOx
39.6
15.7
23.9 ¦
SOx
79-2
31.4
47.8
CO
2.0
0.8
1.2
TOTAL
C02
22096
12322
9774
NOx
48.7
16.4
32.3
SOx
• 80.4
31.5
48.9
CO
3.7
i.O
2.8
(l> Note that in fuel cell case, a small quantity of supplemental thermal is required which accounts for a portion of the site emissions
in the fuel ceil case.
Based on the characterization of the total market potential in the year 2000 as 12 x 1012 kg.cal/yr (Reference
1), the total emission impact relative to the conventional case could be derived. Resulting national emission
savings are shown in Table 4-3.
Table 4-3. National Emissions Reductions
Global Warming
Acid Rain and Health
C02 (Mg/Yr)
N02 (Mg/Yr)
S02 (Mg/Yr)
CO (Mg/Yr)
4.49 x 106
15,181
22,983
1269
-28-
-------
4.4 Commercial System Conceptual Design
A conceptual design of a 1.2-MW ADG fuel ceil power plant was developed. To support a larger 1,2-MW
fuel cell power module, a waste water treatment facility would need to provide approximately 425,000 stan-
dard cubic feet of ADG per day, with a methane content of approximately 65 percent by volume and a heating
value of 540 kg.cal per cubic meter. This module would be capable of supplying 1200 kW of net electric
power to the grid, with an available thermal energy of 1.13 million kg.cal/hr. The site plan concept for the
1.2-MW fuel cell power module is shown in Figure 4-10, and the overall performance data is presented in
Figure 4-11.
4.5 Critical Issues
This section summarizes the key marketing and technical issues that must be resolved to realize the commer-
cial feasibility of the fuel cell ADG to energy conversion concept. Resolution of some of these issues will
come with the recognition of the long term economic value of the fuel cell in reducing electric load growth
while significantly lowering secondary emissions and offsetting the air emissions from electric utility genera-
tors. Resolution of other issues will be achieved with the design and successful demonstration of the pre treat-
ment system and fuel cell on anaerobic digester the following market and technical issues need to be resolved:
4.5.1 Marketing Issues
* Market Entry at Initial Product Capital Cost - Market acceptance of the fuel cell energy recovery concept
must be achieved by entry into markets with the highest electric rates or strictest emission controls. Fed-
eral incentives such as; low cost financing, emission credits, etc. can hasten acceptance of the concept.
" Acceptance of Economic Incentives Unique to the Fuel Cell - Market entry will be hastened by the accep-
tance of economic incentives such as the biomass electric credit, emission credits, distributed power cred-
its, and backup power credits. The fuel cell market share will increase with the magnitude of acceptance
of these credits.
Figure 4-10. MW Site Plan Concept
-29-
-------
35 WT% SULFUR LOADING ON ACT, CARBON
1 PPMV NO* IN EXHAUST
<3 PPMV SULFUR AN® HAUDE CONTAMINANT IN ADG PRETR6ATMENT
SYSTEM EFFLUENT
FUEL GAS
1200 KWe
108x10s
BTU/DAY
THERMAL
V
SOUOS
V
SOLIDS
7,823.400 l/DAY
4,212,600 l/DAY
1220 l/DAY
28.32 l/OAY ORGANIC SULFIDES
2B.32 l/DAY ORGANIC HAUDES
58,840 l/DAY AIR ADDITION TO ENHANCE
ELEMENTAL SULFUR FORMATION
1700 kg/YR OF SPENT ACT WAT EO CARBON
594 kg/YH OF ELEMENTAL SULFUR ON
ACTIVATED CARBON
' NET ACTIVATED CARBON SOLID WASTE MAY BE
REDUCED BY OFF3ITE REGENERATION
FUEL CELL OUTPUT
1200 KWe AC ELECTRICITY
2.72 X 10? kg.CBl/DAY THERMAL ENERGY
AIR EMISSIONS
131,283,200 l/day N* H,0. COj, 02,AR
0.17kg/DAYNOx
88.9 kg/YR ADSORBENTS
(17.7 kg/YR SULFUR & HALIDES)
Figure 4-11. Overall System Schematic and Performance Estimate for Fuel Cell ADG-to-Energy
Conversion System
4.5.2 Technical Issues
* Demonstration of Low Emissions - The demonstrator design and actual demonstration will verify the
low emission capability of the commercial fuel cell ADG-to-energy concept. This includes air emissions
from both the fuel cell and pretreatment system as well as solid and liquid effluents projected for the com-
mercial system,
• Demonstrate Overall Svstem Operability. Durability and Reliability - a successful demonstration will
allow projection of a low operating cost component of the ADG-to-energy life cycle cost for the commer-
cial system. This includes obtaining full rated power operation (200 kW per fuel cell module) on ADG
fuel.
References •
1. Report, "Production and Utilization of Methane From Anaerobic Sludge Digestion in U.S. Wastewa-
ter Treatment Plants", prepared for DOE by Pacific Northwest Laboratory, July 1981.
2. "Fuel Cell Cogeneration in the Wastewater Treatment Industry", Robert R. Barbonlini, Assistant
Chief Engineer, Metropolitan Sanitary District of Greater Chicago, 100 East Erie Street, Chicago,
Illinois 60611, presented at N F/C Seminar, 1981.
-30-
-------
5.0 FUEL CELL ADG-TO-ENERGY SYSTEM DEMONSTRATION
This section uses the results of the base program activity, Phase I, to create a conceptual design for the fuel
cell ADG to energy system demonstration. The demonstration consists of two parts, Option 1 and 2. In Op-
tion 1, a selected site approved by the EPA is examined to determine the site specific requirements for the
design of a fuel pre treatment system. The site specific requirements include local codes and permitting re-
quirements, site ADG composition, and expected demonstration results. With the results of Option 1, the
actual fuel cell modification can be finalized and a complete system can be built and tested, which is the goal
of Option 2. The overall objectives for the Phase 1 program are summarized in Table 5-1. The last three topics
are discussed in this section.
Table 5-1. Overall Demonstration Phase I Objectives
• Define an overall pretreatment system conceptual design and PC25 fuel cell modifications which will
address the key marketing and technical issues and low emissions of a ADG to energy fuel cell system at
a typical WWTP.
• Approval by EPA of the selected site to meet demonstrator objectives. ~
• Establish an ADG pretreatment specification and site specific requirements for the demonstrator pre-
treatment system design.
• Establish the demonstration project plan.
5.1 Site Selection and Description
The Back River Plant in Baltimore, Maryland was selected by IPC and approved by the EPA as the site for
the demonstration. Back River is owned and operated by the City of Baltimore and occupies a 466 acre (1.9
x 106 m2) wooded site in eastern Baltimore County at the head of Back River. The plant treats the wastewater
for a 140 square mile (362 x 106m2) area including Baltimore City and County with an estimated population
of 1.3 million people. For a more detailed description from the City of Baltimore see Appendix C.
5.1.1 Description of Back River Facilities
One of the treatment processes at the Back River plant involves the anaerobic digestion of separated sludge
solids. The anaerobic digestion of the sludge produces a gas that is mostly methane. The plant currently
operates with six cylindrical digesters that produce 1.2 to 1.7 million standard cubic feet a day (MSCFD) of
ADG. Two new egg shaped digesters are in the process of being commissioned and will increase the overall
ADG production to 2.0 MSCFD.
At present, the facility uses the ADG for space heating and to maintain the ADG temperature at 90°F. These
requirements consume approximately 1.3 MSCFD during the winter peak and 0.3 MSCFD during the sum-
mer low. The facilities thermal loads are completely met by the ADG generated. The excess ADG is either
sold to Baltimore Gas and Electric Company (BG&E), who salvage the methane for bleeding into their natu-
ral gas, or flared on-site.
Back River's electric power use averages about 10 MW with a peak of 12 MW. The power is purchased from
BG&E at 33 kV and stepped down to 13,8 kV, the main facility distribution voltage. The voltage is stepped
down to 2.4 kV and 480V at local distribution busses.
Existing Back River laboratory facilities will be made available for the project by the City. These will provide
the necessary gas analysis of ADG for the gas cleanup system and effluent water quality.
5.1.2 Site ADG Availability and Characteristics
The measured digester gas characteristics at Back River are shown in Table 2-1, in Section 2.0 ADG methane
content ranges from 65-70 percent with higher value more typical. The methane content can be negatively
impacted by both heavy storms and the flu season. Heavy storms necessitate an accelerated throughput of
-31-
-------
less concentrated sludge and the flu appears to affect the bacteria. Maintenance and/or repair of the digesters
also affect the process.
The Back River ADG contains relatively few impurities potentially harmful to the fuel cell. ADG is typically
low in halogen compounds, although high in hydrogen sulfide. The use of an "iron sponge" at Back River
reduces the hydrogen sulfide content to about 10 ppm instead of the more typical values of 100 ppm or higher.
However, since the maximum continuous allowable sulfur content of the gas fed to the fuel cell is less then
5 ppm a gas clean-up system is still required permitting demonstration of this critical technology element
at the site.
One area of concern is the Back River report of fouling of ADG piping and components with ferric hydrate
produced by of iron bacteria found in the effluent waste water. It is expected that the compression and filtering
of ADG necessary prior to entering the pre treatment system module will separate out the moisture with the
ferric hydrate from the gas. The ADG is generated in the digesters at about 25.4 cm of water and the blower
prior to the pretreatment system will further increase the pressure by about 7 kg/cm2 gauge.
5.1.3 Electrical/Thermal Fluid Integration Characteristics
The fuel cell power plant will operate in parallel with the main facility electric supply. The power plant output
will be connected to the nearest Back River 480-Vac distribution bus with adequate space capacity.
The useful heat produced by the power plant will be used to preheat the facility boiler feedwater makeup,
for a representative facility make-up supply temperature of 32°C, over 201,600 kg.cal/hr will be available.
The power plant liquid effluent, maximum of 0.5 gpm, is already treated within the power plant to typical
sanitary sewer acceptance levels and will be directed to the nearest facility sewer by gravity.
5.1.4 Codes/Standards and Permitting Requirements
All pretreatment module and power plant interfaces with Back River's piping and circuitry will be designed
according to the codes/standards originally employed in the design of the facility. In addition, the electrical
interconnection and specifically the synchronizing controls will be designed per applicable BG&E intercon-
nection requirements for parallel operation.
Since the proposed installation is located entirely on the premises of the Back River wastewater treatment
plant and interfaces exclusively with the on-site equipment, no permits are required beyond those normally
associated with installation of capital equipment.
The application process for the air permit for the demonstration ADG fuel to energy system is expected to
be uncomplicated and short, due to the low pollutant emission rate of the power plant.
5.1.5 Proposed Location of Demonstration Equipment
A plan view of the entire Back River facility is contained in the information provided by the City of Balti-
more, see Appendix C. As summarized in Table 5-2, the demonstration equipment needs to be located near
the new egg-shaped digesters and within easy reach of required electrical, thermal, and sewer tie-ins. This
limits the installation to somewhere in the southwest corner of the Back River facility.
Table 5-2. Required Site Characteristics
• Close to the ADG supply from the new egg-shaped digesters.
• Close to a Back River 480V distribution bus with adequate space.
• Close to boiler feedwater makeup.
• Close to sewer hookup.
-32-
-------
Figure 5-1 shows an enlarged view southwest corner and indicates four possible siting locations. Sites 1 and
2 are near the "High Rate Digester Control Building", which has all the necessary interfaces for electrical,
thermal and sewer, while sites 3 and 4 are located by the digesters. Sites 3 and 4 are too far away to allow
any heat recovery and Back River strongly favors heat recovery for the demonstration. Site 1 is the preferred
site of the two remaining but there is an oil tank buried there. Back River personnel indicated that the tank
would be easy to drain and backfill with sand. Site 2 could still be used to carry out the demonstration. Both
sites 1 and 2 would require a standard PC25 concrete installation.
5.2 Option 1 and Option 2 Demonstrations
The demonstration portion of the project involves two sequential options. Option 1 involves the building
and testing of a gas pre treatment system for the ADG. Option 2 uses the gas pre treatment system of Option
1 and combines it with a fuel cell modified to run on the clean ADG.
5.2.1 Option 1 Demonstration
Option 1 is the building and operation of the ADG pre treatment system i.e. the gas cleanup system. For this
demonstration a modular unit containing the gas pre treatment system will be placed inside the "High Rate
Digester Control Building". For the demonstration, a bleed stream from one of the two ADG pipes passing
through the building will be passed through the pre treatment module and the clean gas returned to the other
pipe. During the operation, several tests will be performed on samples to ensure the proper operation of the
pretreatment system and to determine any additional constraints that would be imposed upon the PC25 fuel
processing system.
The preliminary process design of the demonstration ADG pretreatment unit was described in Section 2. In
the pretreatment system, 14441/min of ADG is passed through a coalescing filter to remove any water droplet
and large particles before entering the blower. From the blower, the ADG passes through a mass flowmeter
and a small amount of air is added. The air is added to ensure the proper operation of the hydrogen sulfide
scrubber. The scrubber is a tube 42 inches long and 8 inches in diameter containing Westates UOCH-KP
Activated Carbon bed. There are several test ports along the bed through which samples can be taken and
an evaluation of pretreatment system can be made.
5.2.2 Option 2 Demonstration
Option 2 takes the pretreatment system developed in Option 1 and uses the clean ADG to fuel a modified
PC25. Figure 5-2 shows the conceptual design of the proposed demonstrator. A block diagram indicating
all the flows and their compositions is shown in Figure 5-3. For this option the pretreatment system will be
removed from the building and placed outside next to the fuel cell. Heat tracing will be added to the ADG
step stream line feeding the pretreatment system. The gas pretreatment exit flow will be fed directly into the
modified fuel cell.
Table 5-3 lists the improvements required to allow the fuel cell to run on the lower heating value ADG. The
items listed in the table permit the PC25 to meet the 200 kW output requirement. For the one year demonstra-
tor project an additional halide guard may be added to the fuel cell in case there is an upset in the gas pretreat-
ment system. The final determination of the necessity of a halide guard will depend upon the results of Option
1.
These recommended component changes are based on estimated system and component pressure drops cal-
culated using IFC's analytical models. The specific recommended component designs were not part of this
phase of the program. The component specifications will be done as part of the next phase of the program.
-------
Figure 5-1. Fuel Cell Site Options
-34-
-------
CITY OF BALTIMORE -
BACK RIVER
WASTEWATER TREATMENT PLANT
EGG-SHAPED GAS
ANAEROBIC PRETREATMENT
DIGESTERS MODULE
Figure 5-2, IFC's Proposed Demonstrator Concept
-35-
-------
ASSUMPTIONS
SO WT % SULFUR LOADING ON ACTIVATED CARBON
1 PPMV NOx IN EXHAUST
LESS THAN 3 PPMV SULFUR AND MAUDE CONTAMINANTS INTO FUEL CELL
20 WT% CONTAMINANT LOADING ON FUEL CELL ADSORBENTS
ADG
I.266.512 l/DAY
788,180 l/DAY
II,89 WD AY
1.99 l/DAY
1.99 l/DAY
8346 AIR TO ENHANCE
CATALYST ACTION
PRETREATMENT
ADSORBENTS
PRETREATMENT
ADSORBENTS
5.9 kg/YR OF SPENT
ACTIVATED
CARBON
5.9 kg/YR OF ELEM ENTAL
SULFUR ON CARSON
FUEL CELL
ADSORBENTS
FUEL CELL
ADSORBENTS
<15 kfl/YR
ADSORBENTS
<32 kg/YR SULFUR
AND HALIOES
FUEL CELL
EXHAUST
21,860,000 l/DAY
Nj HjO, COj.Oj, AH
0-27 kf/DAY NO*
Figure 5-3, System Schematic and Performance Estimate for Fuel Cell
ADG -to-Energy Demonstration
Table 5-3. Improvements to PC2S ADG Powered Unit
Achievement of Rated Power Capability
1. Modify control software (switch from natural gas to higher density, lower heating value ADG).
2. Change cathode exit orifice (increase pressure drop).
3. Change fuel processing system recycle orifice (reduce pressure drop).
4. Larger capacity inlet fuel controls (reduce pressure drop).
5. Higher head rise ejector (pump higher density, lower heating value ADG and overcome higher
pressure drop).
6. Higher head rise air blower (overcome increased pressure drop).
-36-
-------
APPENDIX A
ANALYSIS OF BACK RIVER ANAEROBIC DIGESTER GAS
(REPORT FROM GASCOYNE LABORATORIES)
A-i
-------
a&cayne ^ghorctiories, ,3ru:
Baltimore, MD 21224-6697
REPOFiT OF ANALYSIS
• c
=~ \
Report.'No. 93-02-038 Report Date: March 12, 1993
Report To: International Fuel Cells . Page: 1 of. 9
Sample I.D. Digester Gas
Digester gas samples were collected at the Back River Wastewater
.Treatment Plant using various procedures and sample collection media for the
analytes listed on the following report pages. The major components of the
digester gas are methane and carbon dioxide, accounting for ninety-four (94)
percent by volume of the gas. Low percent concentrations of nitrogen and
oxygen were also detected. Hydrogen sulfide was the sulfur gas compound
detected with the highest concentration (6 ppm by volume) . Of the other
sulfur gas compounds which were analyzed by the analytical method employed,
none were detected above the limit of quantitation. The estimated limit of
quantitation for' the total of these other sulfur gas compounds would be less
than one (1) ppm by volume.
The mass spectral analysis of the digester gas produced a
ibrary search probability based match for hydrocarbons. The hydrocarbons
etected have estimated concentrations in the low ppb by volume range. No
other significant compounds were detected by mass spectral analysis. The
digester gas was also analyzed for mercury, particulates and ammonia. All
of these analyses are reported, as not detected at the stated limit of
quantitation.
Thomas A. McVieker
QA/QC Officer
A-l
-------
r/ •- \\1
'{ffisccyism
&BC01Jne %nbavaiavxeBy (3Jnj:-
Report No.
Report TO'!
Sample 1.0,
Baltimore, MO 21224-6697
REPOFTT OF AM A LYSIS
93-02-038
International Fuel Cells
Report Date:' March 12, 1993
Page: 2 of 9
Grab Air sample(s) taken by Gascoyne Laboratories, Inc.,
on 02/02/93 (0950) from the International Fuel Cells facility
located at Back River Wastewater Treatment Plant: Digester Gas
Results
Oxygen
(4)
Nitrogen (3)
1
Methane
58
Carbon monoxide
ND '
Carbon dioxide
36
Detection Limits
Notes:
(1)
(2)
(3)
(4)
Results are expresed as percent by volume.
Method(s): GC/TCD;
Analyst(s): QRH;
Date Test Completed:
Includes Argon
02/05/93
Detected below, quantitation level at an estimated result of 0.3
percent by volume.
Thomas A. McVicker
QA/QC Officer
A-2
-------
asccnme ^abarctlortes., 3nr.
Report No.
Report To;
Sample I.D.
Baltimore, MO 21224-6697
REPORT OF ANALYSIS
93-02-038
International Fuel Cells
Report Date: March, 12, 1993
Page: 3 of 9
Grab Air sample(s) taken by Gascoyne Laboratories, Inc.,
on 02/24/93 (1045) from the International Fuel Cells facility
located at Back River Wastewater Treatment Plant: Digester Gas
Hydrogen sulfide
Results
6
Detection Limits
2
Notes:
(1)
(2)
Results are expresed as ppn by volume,
Method(s): GC/FPD;
Analyst(s): JHR;
Date Test Completed:
,02/25/93
Thomas A.. McVicker
QA/QC Officer
-------
asco^nB laboratories,
Report No,
Report To:
Sample I.D.
Baltimore, MD 21224-6697
F1SP0RT OF ANALYSIS
3Co Gis
--x
93-02-038
International Fuel Cells
Report Date:, March. 12, 1993
Page: 4 of 9
Grab Air sample(s) taken by Gascoyne Laboratories, Inc.,
on 03/10/93 (1645) from the International Fuel Cells facility
located at Back River Wastewater Treatment Plant: Digester Gas
Results
Detection
Methyl mercaptan
ND
0.5
Ethyl mercaptan
ND
0.5
Methyl sulfide
ND
0.5
Isopropyl mercaptan ¦
ND
0.5
t-Butyl mercaptan
ND
0.5
Methyl disulfide
ND
0.5
Carbony1 sulfide
ND
0.5
Sulfur dioxide
ND
0.5
Carbon disulfide
ND
0.5
Propyl mercaptan
ND
0.5
Butyl mercaptan
ND
0.5
Notes:
(1)
(2)
Results are expresed as ppm by volume.
Method(s): GC/FPD;
Analyst(s): JMR;
Date Test Completed:
03/10/93
Thomas A. McVieker
QA/QC Officer
a-4
-------
nscayrtz 'JdabmrainrtBS, 3nc
Baltimore, MD 21224-6697
REPORT OF ANALYSIS
SQQi
SiX
• ~*o 63;
Report No.
Report To:
93-02-038
International Fuel Cells
Report Date: March 12, 199 3
Page: 5 of 9
Sample I.D. Grab Air sample(s) taken by Gascoyne Laboratories, Inc.,
on 02/09/93 from the International Fuel cells facility
located at Back River Wastewater Treatment Plant: Digester Gas
Results
Detection Limits
Methylene chloride
ND
20
Chloroform
ND
20
1,1,1-Trichloroethane
ND
20
Carbon tetrachloride
ND
20
l,1-Dichloroethene
ND
20
Tr ichloroethene
ND
20
Tetrachloroethene
ND
20
Chlorobenzene
ND
20
Vinyl chloride
ND
20
1,2-Dichlorobenzene
ND
20
l,3-Dichlorobenzene
ND
20
l,4-Dichlorobenzene
ND
20
1,1-Dichloroethane
ND
20
1,2-Dichloroethane
ND
20
Benzene
ND
20
Toluene
ND
20
1,2-Xylene
ND
20
Notes: (1) Results are expresed as ppb by volume,
(2) Method(s): EPA Method(s) T01/T02
Analyst(s): JLS;
Date Test Completed: 02/24/93
A-5
/
Thomas A. McVicker
QA/QC Officer
-------
XBcaijne JEabaTZiiarxeB, 4Jkj:
Report No.
Report To:
Sample I.D.
Baltimore, MD 21224-6697
REPORT OF ANALYSIS
600) G*S-C'
93-02-038
International Fuel Cells
Report Date: March 12, 1993
Page: 6 of 9
Grab Air sample(s) taken by Gascoyne Laboratories, Inc.,
on 02/02/93 (1135) from the International Fuel Cells facility
located at Back River Wastewater Treatment Plant
Mercury fHqJ
Digester Gas ND
Notes: (1) Results expressed as micrograms/cubic meter (mg/M3) .
(2) Detection Limit = 0.005
(3) Method(s): NIOSH 6009;
Analyst(s): PDB;
Date Test Completed: 02/04/93
A-6
Thomas A. McVieker
QA/QC Officer
-------
asccnjrte ^abcrairrrtes, ^rtr
Baltimore', MD 21224-6697
F1HP0R7 OF AM A LYSIS
Report No. 93-02-038
Report To: International Fuel Cells
ix NC
Report Date: March 12, 1993
Page: 7 of 9
SsimpXs I«D« Grab Aiir ssmpls(s) tsiJc©n by G'Stscoyn© L&boir&toirAss # Inc« f
'on 02/02/93 (1135) from the International Fuel Cells facility
located at Back. River Wastewater Treatment Plant
Digester Gas
Nuisance Dust
ND
Notes; (1) Results expressed as grams/cubic meter (g/M3)
(2) Detection Limit = 0,0025
(3) Method(s): NIOSH 0500;
Analyst(s): TAG;
Date Test Completed: 02/03/9 3
Thomas A. McVicker
QA/QC Officer
-------
3iSJCXJ^ne'^Unbamtttrze$7 3rtc.
Report No.
Report To:
Sample l.D.
Baltimore, MO 21224-6697
REPORT Of ANALYSIS
SCO. GAS -CCV"'
\C
93—02—038
International Fuel Cells
Report Date: March 12, 19 93
Page: 8 of 9
Grab Air sample(s) taken by Gascoyne Laboratories, Inc.,
on 02/02/93 (1030) from the International Fuel Cells facility
located at Back River Wastewater Treatment Plant
Digester Gas
Ammonia fas EH
ND
Notes; (1) . Results expressed as ppm by volume.
(2) Detection Limit = 0.1
(3) Method(s): P & CAM 205;
Analyst(s): LMC;
Date Test Completed: 02/16/93
A-8
Thomas A. McVicker
QA/QC Officer
-------
Report. No. 93-02-038 Report. Date: March 12, 1993
Report To; International Fuel Cells Page: 9 of 9
QA/QC Data; Grab Air sample(s) taJcen by Gascoyne Laboratories, Inc.,
on 02/09/93 from the International Fuel Cells facility
located at Back River Wastewater Treatment Plant; Digester Gas
ANALYSIS DATA SHEET
TENTATIVELY IDENTIFIED COMPOUNDS
(TIC)
Number TICs
found: 7
CAS Number
Retention
Comoound Name Time
Estimated
Concentration
-
Unknown Hydrocarbon
11.7
22
638040
cis-1,3-Dimethylcyclohexane
12.4
22
16538935
Butyl cyclooctane
15.0
8
80568
Alpha-Pinene
19.-7
11
79925
Camphene
20.7
5
-
Unknown Hydrocarbon
22.1
15
4551513
cis-Octahydo-1H-indene
22.7
10
Notes: (1) Results are expressed as ppb by volume.
(2) Tic's identified using computer aided library search of GC/MS
NBS Library of Data generated by method T01/T02
(3) Analyst(s): JLS/JKR? Date Test Completed: 02/24/93
A-9
Thomas A. McVicker
QA/QC Officer
-------
Fuwi C <=> i i ss
ANALYTICAL CHEMISTRY LABORATORY
MATERIAL ANALYSIS REPORT
*****************DATA SOURCE*******************
POWER PLANT /PR0G:PC25, LANDFILL
FILE # : 13718
SUBMITTED BY: Roger Lesieur
R/S * :
CHARGE #: 218120-1100
S.A.M . :93-07-
PART #:
COPIES TO:
SAMPLE: ANAEROBIC DIGESTER DEPOSIT
D. Wheeler
H. Healy
J. Trocciola
FILE MS-36
R. Wertheim
!^^^;*:^4C3fc4r2|c^c^;!i<£!S;2|c^C3|c RESULTS
ITEMS
CONCN
FLUORIDE
70.6ppm
CHLORIDE
13 .9ppm
SULFATE
0 .28%
CHROMIUM
0 .05%
NICKEL
0.03%
SILICON
0 .15%
MANGANESE
0 .22%
MOLYBDENUM
0.01%
COPPER
0 .08%
PHOSPHOROUS
0 .01%
COBALT
NONE DETECTED
ALUMINUM
NONE DETECTED
IRON
REMAINDER
as********* REMARKS **********
DIGESTER N5 GAS DOME SLUDGE, 6-23-93 1:45PM
Analyst/Chemist: Mfi^rTTD i.A VIE R Date: $f^ fa "5
Approved/Released b>~;—KiNRv COTE Date=
A-10
-------
GAS COYNE LABORATORIES, INC.
FIELD SAMPLING SUMMARY REPORT
WO #
Client: J_ e.n a I F"u* I drills I I GRAB SAMPLING
Client Code: - Pm s - r)\ [ZZ3COMPOSITE SAMPLLNG
Site: £odd t,u^ ?U~r-FA^ 5M k\b dJ MONTTORING WELL SAMPLING
Total Cost of Sampling: (« re^n* tidt) S 50 • ~~ MS ~ WIPE SAMPLING
1 1 SITE INVESTIGATION
I I OTHER
FIELD NOTES
Please Note: 0^ 3-jzH k 3 4,r Utt Qu$r., t.A a±
fkn Qas 5a^ fig * e &+ -irk? £ap.c—{Lm£4 U*">Tc—T^f AT^^AjT
?la+jy ao f',6.14-g( Mb 4»r ffrHAtaUe Qt^CS A^Otl-\>n • J—Xcdf ^
A%f h&.Q& UJtAi A/fed 46 <¦ 5A^p)e fetwfc Stfg tiltArAc^i
d*Ati, trf ^Wu 4vf
I
PERSON(s) PRESENT AT TIME OF SAMPLING
LABORATORY INFORMATION
• A*ru.
St >¦ -ft- Pa f
^yy i
^ 4( - Jcfi
A-ll
-------
FIELD SAMPLING SUMMARY REPORT
GASCOYNE LABORATORIES, INC.
ll* awj~t 0 ihse / C£f/s
'ient:
Site: Caju
'P Mb
Total Cost of Sampling: (See reverse side) $ ^,CQ
Total Cost of Field Analysis:. (Sec,reverse 5tdc1Li!ji^
~grab sampling
! I COMPOSITE SAMPLING
I I MONITORING WELL SAMPLING
I 1 WIPE SAMPLING
I 1 SITE INVESTIGATION
t^P? A-<£ S/frri Pi., rJ(r
Contact: IX
CN"*.
SAMPLE CONTROL INFORMATION
U*Jki /"tdK,eJt
Invoice To:^7tuym^ CeJlacf i
Phone No.: O03- 7S-7-
Analysis: frthtfd! fiunfii
Total No. of Containers:.
Priority Analysis:,
Purchase Order No.;_ A c2t/a7
I . LABORATORY INFORMATION .
Please Note: (VaJ ^/s-nZ ^ A Tr ^
iniife^ I, \f& A U~^r - lOCW^^jL. Ot. ij". STw^w - t ?, , . (%**¦ J\ w •.. ,
f$, fyf-/""j^Znf
-*w*w**l*fc*™e™dhei555™*BelK4iiiee*iee™|^fcijNJIpei*
s7£jg yT g—, r.in*'S
-------
>>x C kLtZlOZ U}uTT{°
Phone No. Gascoyne Quote #
FAX No. Client's P.O. ».
GASCOYNE LABORATORIES, INC.
2101 Van Deman Street • Baltimore, MD 21224
410-633-1800 • FAX: 410 633-5443
Page of
. >v,>n.y.,4? •$, :
o uvbu$e6nuy\> " V
[woN;
TESTS REQUIRED
SAMPLE INFORMATION
SAMPLE
TYPt
(USE CODES
ABOVE)
(if applicable)
SAMPLE IDENTIFICATION
(Keep brief and assign simple numbers if possible)
DATE
COLLECTED
TIME
COLLECTED
c
0
M
P
0
S
1
T
E
G
R
A
B
NUMBER i
Of
CONTAINERS
/////////
/ \y /////// COMMENTS
/ / *y ////// / ^Xi hutlU>' ScrVICC#
/ / / / / / / / methods. detection limits, clc.)
(\(\
T)i^srr^ Cja S>
X
a
ah**, -f,~s
f
¦
o
J
RcllnqJihed By (*ignaiurc):
Ponied Na/nc/AtfiJrdficvh
M. facM&LA (jLP1
Dale:
imc:
Prinicd Name/Affiliaiion:
Dale:
Tunc:
Prinicd N^jnc/AffiliuiiiMi:
Dale:
111 nc.
M
Received By (signature):
cm
Received By (iignaiure);
Received Oy (iiyiuiuic):
Prinicd Numc/Affiluilion:
Dale.
Tune:
Prinicd NiimcMffiluiion.
Printed Njmc/Affiliadon;
Dale;
Tunc.
Djic;
I IllkC
A-13
-------
Sample Type Codes:
Air ¦ Ailing
AB
Petroleum Product
PE
Water - Drinking
DW
• Air Filler
AF
Pharmaceutical
PH
- Groudwater
GW
- Sorixnl Tubea
AT
Sludge
SL
- Surface
SU
Alloy(i)
AL
Soil
SO
- Wastewater
WW
Oil(i)
OL
Waste- Liquid
LW
-Solid
SW
Test Results 10:
Company: 'TVi\ tSA/0 -f-i^a( FiA.fl Crlh
Contact: f K e Ml,
Phone No. 7 Q~7 ~ 3"} 7 7
FAX No.
5. Fa I
m
GASCOYNE LABORATORIES, INC.
2101 Van Deman Street • Baltimore, MD 21224
410-633-1800 • FAX: 410 633-5443
Page of
WMbsbiiim^
Sampler.
Sample Site/Project tft^i/v U^le /l^-t
Gascoyne Quote # ^ TESTS REQUIRED
Client's P.O. #
SAMPLE INFORMATION
SAMPLE
TYPE
(USE CODES
ABOVE)
(if applicable)
M
>
i
£
SAMPLE IDENTIFICATION
(Keep brief and assign umplc numbers if possible)
(l\AA Ai/lft.
DATE
COLLECTED
'hij®
TIME
COLLECTED
/MT
c
o
M
P
0
S
1
T
E
NUMBER
OF
CONTAINERS
COMMUNIS
(i.e. Priority Service,
methods, detection limiu, etc.)
Rdioqui^hcdjy (signature
Printed NamcMffiliaiion:
Suxdi EaI nr\.
/4
i i-
Date:
Time:
A
02-
Revived By
u/n'lk
fed By (signature);
(signwurc).
'Uli /
1 wr
Primed Nume/Affiliidiori:
I
miL
iiiuiufi: I
juiJ
tfojfnqui&hcti By (ughAiurc):
!/• }Tn.
PriniedJ^JuneJAffiluiioi)}/ / 9
u C <^r
Dale:
Time;
Printed Name/Affiliation;
Primed Name/Affiliation: s
r
icd Bv/signalurc);
/// fi/Ci'V <>7 /
Dale:
Time:
Primed Namf/A/filiaiiun:
1 C '' ki \( I > C i L /¦
V
\
A-14
-------
Sample Type Codes:
Air ¦ Airtug
AB
Petroleum Product
PE
Water- Drinking
DW
- Air Filler
AF
PharmaccuiicjJ
PH
- Graidwaicr
GW
• Sorball Tubcj
AT
Sludge
SL
- Surface
SU
Alloy(i)
AL
Soil
SO
- Wastewater
WW
Oil(i)
OL
Waste- Liquid
LW
- Solid
SW
!
Tesi Results 10: f-c I OUc
Company: YrU, I fviuA
o
Contact: -s-*
hone No. -OO^- 727-23T1
FAX No.
jj—
Sampler TY\. K/ W^cv.- ^
~
,:OF-CUSTOPY
vj;."'. ;.i <;'
Sample Siie/Projeci V-^ i V r ¦
Gascoyne Quoie ff ^3^ 603^
Client's P.O. # J~ c-2- r"T 13 w/
L~>uJ7 P
GASCOYNE LABORATORIES, INC.
2101 Van Deman Street • Daliimore, MD 21224 v,
410-633-1800 • FAX: 410 633 5443
Page of
|f ; . up USE 0NL.V ..;
TESTS REQUIRED
SAMPLE
TYPE
(USE CODES
ABOVE)
(if applicable)
SAMPLE IDENTIFICATION
(Keep brief ind assign simple number* if possible)
DATE
COLLECTED
TIME
COLLECTED
c
0
M
P
0
S
1
T
E
G
R
A
B
NUMBER
OF
CONTAINERS
/ / "/ ^J //////
/ *" / r1"/ / / / / / /
/ ?/ °/ 1/ / / / /
/ ^ / // // ;/////
/ V/ LV ,al / / / / / COMMKNTS
/ v4/ J0 / \i / / / / / / (i c Service,
/ ^v/ $> / \Y / / / / / nieUjods. dcicciion liniiu, eic.)'
M
\ CyA
'•¦
" 1' 1 J
x
1
y
^Vrf
r
/
/
Ajr 6' ^' i' / (."/
Af
1135
y
/
c O
: AT
*!A
y
1
X
1 1.
/l/r {)'¦> (J ^YY y
t 1
a r
y
i
y
i AT
*?A
y
1
y
i i \ ¦< . t ' 1 A
f\r
f.c.lJ) HUrvit %
t
r
1
/
\.
AT
Tu
\
V
r*
/
1 I
Relinquished By (signature)^ v' jr
ASZC ./x/<
Prinicd Nainc/Affiliuiion: . . 1
M,fA.t,0.Ja< C,ip
iaic: ^
A ii
Rcy^»v£jl B/(signulurc); / *
f v
Piiiucd Nuine/Affiliiilion: / ^ Duic.
Lo^ '¦>"
line;
/ 77V)
f h*p
Rcfirtijujihcd Byltignalure):,^' '
Printed Nunc/AfTiluiiuii: {J 1
1
Dale:
R^c/vcd By (signaiurc):^-
Primed Nttmc/Amliaiion: Djic.
1 line.
line:
ReliixjuiJied By (jignaiuie);
Printed NauneMfTiliuiiun: 1
1
)aic:
kWcivcd By (^i((iiuiurc):
Pnnicd Ntinie/Affilijiiui: Ojic:
Tunc
line:
A - 1 c
-------
APPENDIX B
TECHNOLOGY IMPROVEMENTS
FUEL PROCESSOR/REFORMER
Approach
This activity focused on analytical evaluation of IFC's advanced fuel processor for ADG applications.
Results
The advanced fuel processor's reformer tube surface area can be reduced significantly by improving the heat
recovery from the anode exhaust reformer burner effluent. This burner provides energy for the endothermic
reforming reaction. Optimization of this heat recovery has resulted in a 30 percent reduction in the required
reformer surface area for natural gas operation. This added heat recovery results in increased burner fuel and
air preheat temperature which raises burner flame temperature by about 150°C, For operation on anaerobic
digester gas this increase would be offset by an equivalent 150°C decrease in flame temperature resulting
from the combustion of anode exhaust gas containing increased amounts of carbon dioxide. This should en-
sure high reformer burner efficiency and low methane and carbon monoxide emissions for the fuel cell operat-
ing on anaerobic digester gas.
An improved simple multi-element anode exhaust diffusion burner based on the low NOx burner configura-
tion, used in an earlier natural gas on-site power plant, will be used for heating the advanced fuel processor
reformer. Under IFC's natural gas fuel cell programs, initial laboratory testing of a single element of this
burner indicates very low methane and carbon monoxide emissions. NOx emissions will be verified at a later
date. A single element of a simple multi-element natural gas start burner (for reformer heat-up) has also been
tested with reliable ignition and good flame retention characteristics. These start and sustaining burners
should be easily adaptable to waste gas applications.
Recommended Development Program
The following program is recommended to evaluate and demonstrate the full potential of this new low cost
reformer and low emissions burner on anaerobic digester gas.
• A fuel cell system thermodynamic study and analytical heat transfer characterization of this new re-
former should be completed to predict rated power reformer and burner system conditions (efficien-
cy, flows, temperature, pressure drops) with anaerobic digester gas.
• Off design system thermodynamic and reformer heat transfer analysis, including part power and op-
eration at reduced reformer steam-to-carbon ratios, should be completed. Operating with reduced
steam- to-carbon ratios will increase the quality of fuel cell heat, which is beneficial for ADG applica-
tions. Thermodynamic carbon formation limits should be defined for reduced steam to carbon ratios.
• The single element laboratory start-up and sustaining burners should be verified at ADG conditions.
• The results of the above studies may suggest simple modifications to the reformer or burner geometry
to optimize reformer performance or burner operation specifically for ADG. Off-design system anal-
ysis will help define reform catalyst operating and control limits for operation on ADG.
• The advanced reformer should be operated on simulated ADG to verify performance and low sustain-
ing burner emissions.
B-l
-------
EJECTOR/FUEL CONTROL
Issue
Gas from an ADG plant contains significant quantities of carbon dioxide. When this gas is fed to the fuel cell
power plant it will result in increased system pressure drops.
The present 200-kW fuel cell power plant fuel/steam control incorporates a variable area ejector with steam as
the primary flow component, A potential lower cost alternative concept considered substitution of a fixed
area ejector with a modulating steam valve (Figure 1). This approach was considered to be beneficial to the
ADG application in that it could provide the additional ejector flow and pressure rise capability, relative to
present power plant, necessary to accommodate the dilute digester fuel.
Figure I. Fixed Area Ejector Fuel! Steam Control Configuration
Approach
The fixed area ejector concept was evaluated in cooperation with the vendor who currently supplies the vari-
able area ejector hardware for the natural gas power plants. This evaluation addressed the required character-
istics for fixed area ejectors operating on dilute digester gas. Fixed area ejector performance was evaluated by
computer model and was compared against the required operating characteristics. A range of fuel and steam
flows, and required head rise, consistent with power plant operation from idle to full power were included.
The requirement for operation at varying flow rates was considered a critical element in the fixed area ejector
evaluation, since varying flow capability is necessary to accommodate power plant transients. Table 1 pro-
vides the fuel and stream flow requirements for operation on dilute fuel gas.
B-2
-------
Table 1. Power Plant Requirements With Dilute Fuel Gas
Operating Condition
Fuel Flow Requirement
(Fuel & Recycle) kg
per hour
Steam Flow
Requirement
kg per hour
Pressure Rise
Requirement
kg/cm2
Idle
55.3
68.5
.28
Full Power
119
171
.60
Results
The model illustrated that a fixed area ejector could be designed to meet the design point requirement. How-
ever, due to ejector flow characteristics, the ejector required excessive steam flows greater than available from
the power plant in order to provide the head rise requirement for the fuel gas at part power loads.
The conclusion from these results is that the application of the fixed area ejector concept to the PC25 power
plant is impractical to meet its functional requirements while operating on relatively dilute digester gas.
Recommended Development Program
No further development of the fixed area ejector concept is recommended at this time. Future alternative
power plant applications which require a fixed power output may offer opportunities for the fixed area ejector
concept. Additional development may be appropriate at that time.
However, the modeling did indicate that technology improvement to the present variable area ejector may
meet both the design and turndown requirements for the dilute digester gas. As a result, an additional technol-
ogy assessment effort was performed for this base program to determine the pumping characterization of the
present ejector with improved mixing tube configuration. The effort included:
• Testing of the power plant ejector at the secondary1 flows consistent with the waste methane applica-
tions.
• Modification of the power plant ejector with new mixing tubes and testing at secondary flows consis-
tent with the waste methane application.
The first tests provided the basis for identifying the capability of the present ejector on waste methane gases.
The second testing was an approach to enhance/optimize the ejector configuration to increase power plant
output capability on ADG without the need for either of the above options. The results of the characterization
tests indicated that the present power plant ejector should be able to provide ADG fuel flow sufficient for 200
kW rated power output, providing that pressure drops are within calculated ranges. One of the new mixing
tube configurations indicated slightly better pumping characteristics, which provides an alternative ap-
proach. As a result, no new technology is recommended for further activities in this area.
1. Secondary flow is the fuel through the ejector, i.e. waste methane; primaiy flow is the steam through the ejector, it pro-
vides the pumping energy.
B-3
-------
ALTERNATIVE WATER RECOVERY
Issue
One significant element of the overall fuel cell power plant cost is the condensers which are used to recover
fuel cell product water for use in the fuel processing system. Decreasing the cost of the fuel cell power plant
would result in increased savings to operators of the waste water treatment plants. Increased savings will
provide an additional economic incentive to purchase fuel cells for use at waste water treatment facilities.
Approach
The approach includes the following:
• A review of past studies to select/define a feasible alternative configuration.
• Use of the 200 kW fuel cell configuration as a baseline.
• Maintenance of the design of existing, "unaffected" components.
• Identification of the impact of the alternative system on the baseline system characteristics.
In the baseline power plant configuration, product water is recovered from the combined reformer/fuel pro-
cessor burner exhaust and cathode exhaust streams in a conventional heat exchanger/condenser. This water
recovery condenser is cooled by an ancillary coolant loop. The condensed water is degasified to remove dis-
solved carbon dioxide by a dedicated degasifler air stream in a degasifier/water storage tank. The degasified
condensate is then stored in the water storage tank.
In an alternative configuration, the product water is recovered from uncombined burner exhaust, cathode ex-
haust, and cathode exhaust streams in a contact cooler. A contact cooler is a vessel which contains high sur-
face area packing. Liquid water and the gas stream are in physical contact with each other and are passed
"counter current" within the vessel. Water is condensed into the liquid stream. The contact cooler tempera-
ture is maintained by heat rejection to a new circulating water loop which utilizes an upgraded pump. The
contact cooler heat load is transferred to the ancillary cooling loop via a new heat exchanger. The contact
cooler loop water is degasified by the cathode exhaust stream in a lower portion of the contact cooler water
loop. The degasified condensate is stored in the contact cooler sump. A portion of the contact cooler water
loop is circulated to the water treatment system.
Results
The results of the evaluation are:
• The water recovery system cost could be reduced slightly with the incorporation of a contact cooler
based system.
• The impact on the power plant specification from incorporation of a contact cooler based water re-
covery system is that the parasite power requirements would increase by 11 kW, resulting in a signifi-
cant electrical efficiency penalty of approximately two percent. This increase in parasite power
would also result in a larger power plant in order to produce 200 kW of net power. This increase in
power plant size would negate the cost reduction realized with the alternate water recovery system.
• The maximum low grade waste heat temperature available to the customer for cogeneration would be
51.7°C compared to 60°C for the present baseline power plant.
• No change in the quantity of water recovered, system complexity, or reliability is anticipated.
B-4
-------
Recommended Development Program
The impact of introducing a contact cooler based water recovery system on parasite power and on heat recov-
ery are considered significant enough to negate the estimated savings in water recovery system cost. For this
reason, it is not recommended that the contact cooler configuration be incorporated into the power plant de-
sign at this time and no development program is proposed.
CQNTRQLS
1. Fuzzy Logic Applications
Issue
Industry application of fuzzy logic control is increasing rapidly because of its perceived advantages in con-
trollability and cost. The application of fuzzy logic control was reviewed to determine if this control system
approach would benefit the power plant design for ADG application. Potential examples of this benefit are
reduction in power plant costs or improved operating characteristics.
Approach
The approach included definition of the fuzzy logic control concept and its implementation, review of the
power plant control strategies, and identification of areas that may benefit from fuzzy logic techniques.
Results
Fuzzy Logic Concept • Fuzzy logic is a simplified approach for "approximating" a complex output control
surface based on two or more inputs. System inputs are assigned numeric meaning based on imprecise lin-
guistic expression. Fuzzy logic rules are then evaluated to get precise results. The steps of fuzzy logic are:
Fuzzifkation - applies the current input values to the input membership functions.
Rule Evaluation - uses the logic rules and the fuzzy inputs to determine the fuzzy output weights.
Defuzzificatlon - Takes the weighted average of the fuzzy outputs to determine the final output.
In most applications, fuzzy logic cannot "do" anything that cannot be solved using traditional control meth-
ods. Fuzzy logic excels in non-linear systems applications where linearizing assumptions must be made be-
fore applying traditional control techniques. There may be systems with significant nonlinearities that can
only be solved with fuzzy logic.
• Systems too complex to accurately model.
• Systems with moderate to significant nonlinearities.
• Systems having uncertainties in either inputs or definition.
Implementation Considerations - Fuzzy logic may be implemented using an inference unit incorporating
either only software techniques or a combination of software and specialized hardware. The three approaches
are:
1. Develop software from scratch.
2. Buy commercial software development package.
3. Use an integrated hardware/software approach.
The design of an advanced power plant controller for commercial applications such as ADG should permit the
incorporation of fuzzy logic control based on commercial software development products.
Fuel Cell Control Applications - The present natural gas control algorithms and software implementation
have been developed with considerable investment and verified by extensive field experience. Future control
B-5
-------
system implementations should reuse as much of the existing software as possible. There will be little, if any,
cost benefit in replacing power plant existing process control algorithms with fuzzy logic. Fuzzy logic should
be investigated for possible applications where controls can be enhanced or for new control requirements.
Several potential applications for fuzzy logic control have been identified. The identified applications could
improve power plant performance or availability. The three main areas that fuzzy logic controls could be
applied for are:
1. Adjustment of control schedules to improve:
- Long term performance
- Reformer temperature schedule
- Cell stack temperature control
- Power foldback to maintain availability
2. New controls requiring new algorithms
- Motor compartment cooling
- Reformer burner air control
- Process fuel control for fuels of varying composition such as may be encountered in the ADG
application
3. Problem diagnostics
- Identify problems on line i.e., stuck valve
- Identify trouble shooting procedure for service personnel
Recommended Development Program
It is recommended to develop and test a fuzzy logic implementation for adjusting a control schedule.
It is also recommended that an effort be started to develop an on-line diagnostic tool using fuzzy logic tech-
niques. Diagnostics are currently performed by trained service personnel of fuel cell customers or with the aid
of manufacturer field support personnel. An on-line diagnostic tool will become more important as the num-
ber of power plants in service increases and the importance of providing rapid restoration to service is empha-
sized.
2. Sensors
2A Oxygen Sensors
Issue
Air to fuel ratio in the reformer burner is a critical parameter in fuel cell control. It is essential for control of
reformer operating temperature and exhaust emissions. Use of an oxygen sensor would permit operation at
lower air to fuel ratios without increasing power plant emissions. Reduced air to fuel ratio would result in
increased efficiency.
Approach
A survey was conducted to determine if off-the-shelf oxygen sensors could be utilized to control the air/fuel
ratio. Several different applications where oxygen sensors are currently in use were identified. These applica-
tions include: flue gas analysis, automotive exhaust, and atmospheric monitoring. Characteristics of these
sensors vary widely; however, the driving factor seems to be cost. The automotive industry appears most
B-6
-------
promising. Although automotive sensors are inexpensive, the environment in which they will perform reli-
ably is limited, Table 2 provides the requirements of a fuel cell oxygen sensor. Table 3 provides a summary of
the oxygen sensors surveyed.
Table 2. Fuel Cell Power Plant Oxygen Sensor Requirements
Exhaust
Gas
Temp
(°C)
o2
Range
(% 02)
In-si-
tu (Y/
N)
Refer-
ence
Gas
Output
Signal
Life
(years
)
Cos
t(S)
Accura-
cy (%)
Re-
sponse
Time
(see)
Poisons
Number
of
Suppli-
ers
204-37.8
-17.8
1.5-4,0
Yes
—
_
5-20
300
+/~2
2-5
H3PO4
Present
—
Table3. Oxygen Sensor Summary
Type
Exhaust
Gas
Temp
(°C)
o2
Rang
e(%
O2)
In-si-
tu
(Y/
M
Ref-
er-
ence
Gas
Out-
put
Signal
Life
(year
s)
Cos
t($)
Accu-
racy
(%)
Re-
sponse
Time
(sec)
Poi-
sons
Num-
ber of
Suppli-
ers
Industrial
Flue Gas
650—1.7
-17.8
0.1-1
00
Yes
Air
5
800
+/- 3
Meas
1-30
3
Atmo-
spheric
Monitor-
ing
• Micro
Fuel
cell
0-50
0-100
No
Air
0-1
VDC
0.5-1 -
+/— 2 fs.
7-30
2
• Zir-
conia
Based
1
0.1-2
0
?
Air
1-250
mV
3
140
+/-1 fs
30
Liq.
h2o
sili-
cone,
soXl
h2s,
F, CL
Br
1
Automo-
tive
400-63.8
-17
Yes
Air
.1-1
mV
1K-3
K hrs
50
<5
Sili-
cone
lead
2
Results
Industrial Flue Gas - Industrial flue gas sensors are zirconia based and are most often used to measure oxy-
gen content in large industrial stacks, such as coal and oil fired power generation plants and other large furnace
applications. The sensors feed voltage signals back to the control system which then instructs the air trim
valve to open or close. Note that all manufacturers of these sensors strongly discourage the use of these sen-
sors for total air flow control; rather, they should be used for air flow trim. These sensors are designed as part
of a system, therefore, controls are readily available and easily used with the sensors. Drift in the sensor is
minimal and calibration is not a problem due to the fact that air is used as a reference gas.
The flue gas sensors are reliable and could most likely meet fuel cell requirements, however, their costs are
relatively high. Initial cost estimates put the sensor alone in the $800 range.
B-7
-------
Atmospheric Monitoring - Atmospheric monitoring sensors are primarily used in environments where the
potential for asphyxiation exists. The sensors vary widely in accuracy and longevity. The micro fuel cell,
which uses a liquid electrolyte to generate a voltage when exposed to oxygen, is an inexpensive sensor. How-
ever, these sensors are not made for high temperature applications and the life expectancy is at most one year.
Drift in the sensor is extreme and frequent recalibration is required.
Zirconia based sensors may be suitable for fuel cell applications. Life is said to be greater than three years
with no calibration required. The sensors cost have been estimated at about $ 140. The manufacturer also sells
a printed circuit card for signal processing which would appear to fit the power plants I/O scheme.
Automotive Oxygen Sensors - The automotive sensors are highly desirable primarily because of their low
cost and high reliability. Current cost estimates put the sensors in the $50 range. There are some technical
issues which must be addressed in order to determine if these sensors may be adapted to reformer burner ex-
haust applications. The first issue is the percent oxygen operating range. The automotive industry operates in
a range of 0% - 1.5% oxygen which is below the range currently under consideration for reformer burner
exhaust. Above 1 % oxygen, the voltage to percent oxygen slope becomes increasingly flat, making it harder
to maintain resolution in the percent oxygen measurement (Figure 2).
Figure 2. Automotive Oxygen Sensor Response
Another issue is life expectancy. The automotive industry designs for 80,470 km or about one to two thou-
sand hours of operation. However, the environment where these sensors operate is extremely harsh. There are
extreme thermal variations, mechanical vibrations, as well as a whole host of poisons that could be introduced
to the sensor via the fuel consumed or various lubricants and sealants used in the engine. An estimate for life
in a fuel cell type power plant was made by an automotive sensor expert at approximately 3000 hours. This
estimate is suspected to be conservative, but it is still well below the level required.
These sensors are not supplied with a control system. It is possible that the automotive electronics and logic
could be adapted to our fuel cell application. However, the controls would most likely not be a standard off-
the-shelf item.
B-8
-------
Recommended Development Program
The most promising of the candidates appears to be the automotive sensors and the zirconia based analyzers.
Testing and evaluation of the zirconia analyzers along with potential alternative automotive oxygen sensors is
recommended.
2B. Automotive Sensors
Issue
Decreasing the cost of the fuel cell power plant would result in increased savings to operators of the waste
water treatment plants. Increased savings will provide an additional economic incentive to purchase fuel cells
for use at waste water treatment facilities. Automotive sensors offer the potential for reduced cost.
Approach
A literature search of automotive sensors was undertaken. The source found to be most useful was the compi-
lation of the papers on the sensors and actuators presented at the Society of Automotive Engineers (SAE)
annual Congress and Exhibition. SAE was subsequently contacted and they provided a literature search of
their publications for resources within their system.
Results
Automotive sensors are available at very low costs compared to typical commercial or industrial sensors used
on the present fuel cell power plant. The main reasons for the lower costs of the automotive sensors are:
High Volume Production
Product Specialization
Simple Inexpensive Packaging
Not Repairable
Not Adjustable
Table 4 provides a listing of the functions monitored by automotive sensors and their potential applicability to
fuel cell power plants.
Table 4. Automotive Sensors and Applicability
Sensed Condition Applicable to Fuel Cell Power Plants
Acceleration
NO
Temperature
YES
Pressure
YES
Level
YES
Gas Flow
YES
Liquid Flow
YES
Valve Position
YES
Tank Level
YES
Current
YES
Voltage
YES
Oxygen Concentration
YES*
Fuel Composition
YES - Future
Angular Position
NO
Torque
NO
Fluid Conductivity
YES
* Note: Oxygen Sensors were studied in a separate
Section of this report
B-9
-------
The sensors utilized by the automotive industry to monitor these functions were surveyed for their
potential for replacing fuel cell sensors. Those that showed good potential are:
• Temperature Sensors - The automotive industry uses thermistors and thermal switches to measure
temperature. The cost of a thermistor is not significantly lower than the thermocouples presently
used on the power plant There could be cost savings from elimination of signal conditioning equip-
ment. Another cost reduction is the substitution of thermal switches for thermocouples.
• Fluid Level - The pressure switches used by the automotive industry to monitor fluid could be uti-
lized in the fuel cell to monitor the level in the water tank.
• Flow Sensor - Automotive industry silicon based flow sensors could be used to monitor fuel cell flow
rates. Modification would probably be required.
Recommended Development Program
This study was preliminary in nature. With that in mind, it is recommended that IFC stay abreast of develop-
ments in the automotive sensor area with respect to this program.
Specific recommendations for the automotive sensors involve further investigations of current technologies.
It is recommended that thermistor based temperature sensing be evaluated for fuel cell applications. The use
of thermal switches to directly control a function should be pursued. Pressure switches should be evaluated to
see if they could be used for tank level monitoring. Also, it is recommended that additional contact be made
with manufacturers of various silicon based flow sensors to determine the cost and feasibility of custom pack-
ages.
3. Power Plant Controller
3A Input/Output (I/O) Simplification
Issue
Power plant controller process input/output signal interface hardware accounts for a large portion of control
system costs. Reduction in power plant costs would result in more wide scale use of fuel cells in waste water
treatment plants.
Approach
Three areas were investigated as part of this study:
1. Review the I/O requirements and determine which components in the I/O signal paths are re-
sponsible for the major cost contributions.
2. Identify and assess various I/O architecture configurations and interfaces with the power plant
controller.
3. Investigate alternatives for the DC System voltage and current sensing and signal condition-
ing.
Results
Review of I/O Requirements and Costs - The review of process control I/O signals for the present fuel cell
power plant was classified by the signal conditioning path "type." The manufacturing cost of each signal
"type" was assessed to identify the areas with the largest cost. It was found that the thermocouple inputs are
the largest part of I/O costs.
I/O Subsystem Architecture Evaluation - "Distributive" and "modular" I/O subsystem architectures were
investigated. Both approaches utilize a serial link to interface to the power plant controller.
The I/O subsystem evaluation included a study of the available distributive and modular systems. The defini-
tion for these systems are:
B-IO
-------
1) Distributive Architecture - A control system that is not dependent on a single control unit. The
system is comprised of multi-unit controls of different complexity. Individual control units may per-
form control functions as well as I/O functions.
2) Modular Architecture • A central control system that has a specific task to perform by dedicated I/O
units. These I/O units provide a common interface and data set to the central control system.
The I/O subsystem architecture cost and technical evaluation focused on an Analog Devices uMAC-1060 as
an example of an architecture distributive. This study showed a 40 percent cost savings for capabilities simi-
lar to the present system. Both of the alternative I/O subsystem architectures ("distributive" and "modular")
offer cost and technical advantages over the present power plant approach.
The hardware representing a distributive architecture (Analog Devices uMAC-1060) was evaluated with re-
gard to serial communication throughout and input/output timing as compared with the PC25 power plant
requirements. Adequate communication throughput to meet the PC25 control timing requirements was dem-
onstrated at a 9600 baud rate. Serial communication hardware with this baud rate is widely available.
An I/O subsystem architecture utilizing a serial link to interface with the power plant controller provides
greater flexibility for supplier selection and "upgradeability" to avoid hardware obsolescence. A modular I/O
subsystem architecture minimizes the software development and configuration management effort, while the
distributive architecture reduces the central processor throughput burden. Since the power plant controller
processor throughput is not an issue, a modular I/O architecture is the preferred approach.
After reducing the I/O count to the minimum number of components and sourcing from the least expensive
supplier of I/O hardware that meets the requirements, further cost reductions will be minimal.
DC System Voltage and Current Sensing - The measurement of dc voltage and current was identified for
more detailed investigation to determine opportunities for cost reduction.
This study examined three fuel cell power plant sensor signals.
1. HSV - Half Stack Voltage: This is the upper and the lower half stack dc voltages.
2. FCV - Fuel Cell Voltage: This is the total stack dc voltage.
3. IDC - Fuel Cell Current: This is the dc current delivered from the fuel cell.
The study indicated that cost reduction could be achieved by reduction of custom signal conditioning compo-
nents as follows:
• By utilizing off-the-shelf input modules with guaranteed isolation, the HSV can be implemented by
two half stack voltage dividers and computed in software.
• By adding the two half stack voltages (see HSV above) the FCV can be computed in software.
• By interfacing the current sensing device to the controls via an off-the-shelf input module.
Recommended Development Program
Since a large portion of the total I/O costs are thermocouple related, a further investigation into other methods
for temperature measurements could yield substantial savings. It is recommended that alternate temperature
sensing methods be explored.
It is recommended that a custom design for an analog I/O Subsystem be developed for application to high
volume power plant production in the future. Intelligent sensors incorporate signal functions, isolation, and
A/D conversion at the sensor location and transmit the digitized data over a bus or network. At present pack-
aged sensors of this type are costly, but they can be manufactured using a few low cost components. It is
expected that costs will come down as this market becomes more competitive.
It is also recommended that other areas be investigated to find lower costs for:
B-ll
-------
• Sensors (including "smart I/O" devices - see Section 2, above)
• Methods of signal conditioning
• Methods of isolation
• Methods of AID conversion
Pursuit of the development and verification of an alternate approach for sensing the signal conditioning of the
dc electrical measurements; dc volts, Half Stack volts, and dc current is recommended. The effort would
procure the hardware necessary for sensing and signal conditioning of the dc electrical measurements, imple-
ment the necessary hardware and software changes and test the unit on a PC25 power plant.
3B. Remote Two Way Communication
Issue
The present fuel cell power plant controller allows remote retrieval of power plant operating data. However,
direct input from a remote modem back into the controller is not allowable. Two-way communication will
add significant capability for the cost effective operational support and maintenance of the power plant.
Approach
The hardware and software was assessed to determine the impact of incorporating the feature for remote two
way communication with the power plant controller via modem. Modifications to the present software and
hardware design were identified. Two aspects were investigated: 1) remote adjustment of power plant tuning
parameters and 2) power plant operating command and status reporting.
Results
While the non-recurring costs and technical issues make implementation with the present I/O controller de-
sign impractical, this feature should be pursued for future control system designs.
New Remote Communications Architecture - Three approaches were considered for the next generation
communication software design. They are as follows;
1. Real Time Operating System (RTOS) Custom Software: All communications software running a
real time operating system which can be installed in the DOS environment. The present power plant
control is executed in a RTOS. AD software would be custom developed, except for the possibility of
obtaining an RTOS serial device driver. The RTOS software would perform two-way communica-
tion with a remote operator through a serial port and modem.
2. DOS Custom Software: Custom software executing under DOS, communicating with the control
application software executing under RTOS. All software would be written and compiled under
DOS. The DOS software would perform two-way communication with a remote operator through a
serial port and modem.
3. DOS Commercial Software with Custom Communication Software: Custom communication
program, executing under DOS, communicating with the control applications software executing un-
der RTOS. This custom program would execute a commercial communications package or make use
of commercial software tools available for serial communication functions. The commercial pack-
age or tools can perform standard DOS functions common to all applications using serial communi-
cations through a modem. These functions will save development time and will help achieve a more
reliable communication package for the remote operator.
The results of the investigation led to two primary conclusions:
1. Commercial communication packages do not provide the exact features required for the fuel cell
power plant application.
B-12
-------
2, Integration of the communications interfaces with our real-time power plant controls become greatly
complicated when using DOS based software - the "real-time" aspect being the most significant
problem.
The first approach, RTOS Custom Software, is the best choice for the power plant application, This approach
requires the shortest development time, while still maintaining the versatility needed to perform the present
requirements and any added future requirements.
Communication Hardware Considerations - Modem and Serial Port: The power plant controller uses an
RS-232 serial interface for its remote communication. The circuitry used to implement this serial interface is
known as a serial port. The serial port contains a hardware device that performs all the basic functions for
serial communications, called a Universal Asynchronous Receiver Transmitter, or UART. There are two
types of UARTs available for the RS-232 serial interface, one buffered and the other unbuffered. The buff-
ered, as the name implies, contains FIFO buffers in the hardware, so input characters are stored in hardware
until the software is ready for them. With unbuffered UART, all input buffering must be done in the software.
This means that the software must receive a character before the next one arrives, or it will be lost. The hard-
ware buffering may be necessary with a high speed interface and a multitasking environment.
Modems for the Controller come in two varieties: internal modems and external modems. The internal mo-
dem has a serial port on its circuit board, built around one of the UARTs mentioned above. The modem card
plugs directly into the controller, using its internal power supply.
The external modem is a totally self contained unit with its own external power supply and RS-232 interface.
The external modem would connect to the controllers internal serial port via a serial interface cable, This
serial port may be on the controller CPU board or may be an add in serial port card. Whether a modem is
internal or external is transparent to the software. The modem functions are the same either way. Table 5
compares the characteristics of internal and external modems. Table 6 provides the advantages and disadvan-
tages of general modem functions.
An "Internal Model" approach has been selected as the best approach primarily due to lower cost and simpli-
fied packaging. High data flow rate is not an important consideration for the fuel cell power plant application;
therefore data compression or speeds greater than 9600 baud are not required. However, a buffered UART
should be utilized to alleviate the demand on the real time operating system. Error detection will be done by
the software.
Recommended Development Program
Develop hardware and software to provide remote two-way power plant communication capability. The pres-
ent task identified a hardware and software approach for implementation of two-way communication in fu-
ture power plant control systems.
Table 5. Comparison of Internal Versus External Modem
Modem Characteristic
Internal Modem
External Modem
Cost
5-10% less than external for 9600
baud and up
5-10% more than internal for 9600
baud and up
Isolation
Modem on common Bus Shares
power supply with CPU
External power supply enters box
through serial cable
Power Supply
Internal, same as CPU
External, must plug in to outlet
Packaging
Mounted inside controller, no ex-
tra space needed
Must be mounted external to control-
ler, along with power supply.
Serial Port
None needed, built in
Serial port needed for interface
Flexibility
Must use Bus compatible modem
card. Must open controller to re-
place.
Easily replaced, can substitute equiv-
alent model for foreign use. Not bus
specific.
B-13
-------
Table 6. Advantages and Disadvantages of General Modem Functions
Modem Function
Advantage
Disadvantage
Error Correction
CRC error correction done in
hardware
May slow down transfer rate
Data Compression
Higher data flow rate
Risk of loss of data when uncom-
pressing
9600 Baud
Compatible with more mo-
dems, less expensive
Data transfer rate not as high as
14,400 baud
14400 Baud
Higher data flow rate
More expensive than 9600 baud
Buffered UART
Hardware buffering for multi-
tasking system. No data loss.
Compatible with fewer modems.
HEAT RECOVERY
Issue
The present power plant configuration can provide approximately 65,520 kg.eaL'hr of customer available
waste heat at approximately 150°C. Increasing the quantity and quality of this waste heat could result in more
efficient utilization of the waste methane consumed by the fuel cell.
Two examples of the value of high grade heat are:
1. Waste water treatment plants use direct injection of steam into their digester tanks to improve the
process.
2. Steam can be used to run absorption air conditioners for the plant office building.
Approach
A study was conducted to evaluate options for increasing the quantity and quality of recoverable high grade
heat from the power plant. The study included:
• A focus on systems which will maximize the quantity and quality of high grade heat.
• A review of results of recent heat recovery system studies and selection of the optimum configura-
tions.
• A definition of the preliminary requirements for the heat exchanger and controller component
changes.
• An iteration of component definitions between vendor available equipment and design requirements.
• An assessment of the development effort and recurring costs of these components.
The initial work for this task was to identify systems which would increase the quantity and/or quality of high
grade heat.
Results
To increase the quantity of high grade heat, relatively straight forward additions of 1-2 heat exchangers are
required. To increase the quality of high pade heat, a re-design of the Thermal Management System is re-
quired.
These results are summarized in Table 7. As shown, three systems are compared: 1) the Baseline System, 2)
the Baseline System with straightforward incorporation of heat exchangers, and 3) an extensive modification
to the Thermal Management System.
B-14
-------
As shown in Table 7, the straight forward introduction of the heat exchangers increases the quantity of high
grade heat by approximately 47 percent with the temperatures constant at 154° C for heat recovered in a high
pressure water loop and 135 °C for heat recovered as steam. This steam temperature is adequate for compara-
bility with single effect chillers but inadequate for double effect systems.
Modifying the thermal management system can provide a significant increase in available temperature to
340°F making it compatible with double effect chiller systems, However, the quantity of available high
grade heat is increased by only 15 percent.
Table 7. High Grade Heat Improvement - System Changes
Maximum* Temperature
Maximum*
High Grade
Heat kg.cal/h
Hot Water
Steam
Power Plant
Changes
1. Baseline Design
66,024
154°C
135°C
None
2. Regeneration
Feed Water Pre-
heat with Cathode
Exit
86,940
154°C
135°C
Add 1 Gas to Water Heat
Exchanger
Feed Water Pre-
heat with Cathode
Exit Plus Burner
Exchanger Heat
Recovery
97,020
154°C
135°C
Plus 1 Gas to 2 Phase Heat
Exchangers
3, Change Thermal
Management Sys-
tem
75,600
171°C
171 °C
• Add 2 Heat Exchangers
from Item 2 Plus at Least 1
(Open Loop) Additional
and Possibly 2 (Closed
Loop) Additional Heat Ex-
changers
• High Temperature Air
Control Valves
• Closed Loop System In-
creases Power Plant
Height
*Maximum heat quantity and maximum temperature are not obtained at same time; heat/tempera-
ture relationship depends on design of heat exchanger and specific customer conditions.
Recommended Development Program
A design and verification program is required for the System Number 2. More evaluation of consequences
followed by design and verification is required for System Number 3. Either of the thermal management
system changes would increase the cost of the power plant.
B-15
-------
APPENDIX C - CITY OF BALTIMORE, MD, INFORMATION
OTY OF BALTIMORE
KURT L. SCHMOKE. Mayor
department of public works
BUREAU OF WATER AND WASTE WATER
300 Abel Wolffian Municipal Building
Baltimore, Maryland 21202
Description of the Back River Wastewater Treatment Plant
8201 Eastern Boulevard, Baltimore, Maryland 21224
The Back River Wastewater Treatment Plant is owned and operated by the
City of Baltimore. It is a secondary treatment facility .occupying a 466
acre wooded site in eastern Baltimore County at the head o£ Back River. The
collection system discharging to the Back River Plant serves an area of 140
square sdles with an estimated population of 1.3 million. The plant treats
approximately 90 percent of the wastewater generated from Baltimore City and
Baltimore County.
Wastewater at the Back River Plant currently receives three levels of
treatment: preliminary, primary, and secondary treatment.
Preliminary treatment includes bar screens and grit removal basins.
Screening removes large floating objects (rags, sticks, boards, etc.) which
may clog or damage pipes, pumps, or collection mechanisms. After screening,
the flow enters the grit removal basins where its velocity is reduces and
granular particles (sand, gravel, glass, etc.} settle out.
Following preliminary treatment, the wastewater is conveyed to the
primary tanks. During primary treatment, large and denser suspended organic
particles settle in eleven large sedimentation basins (nine 170 ft. diameter
and two 200 ft. diameter), approximately 50 percent of the suspended
organic material normally settles - in these tanks and is removed as sludge.
Waste Pickle Liquor, obtained as by-products from Bethlehem Steel
Corp's steel mill process, is added after primary settling and before
secondary treatment to chemically precipitate out phosphorous to reduce
nutrient load to the Bay.
Since primary treatment is a physical process which removes only SO
percent a£ the suspended material, other pollutants which remain as
dissolved" solids and fine solids must be removed by other methods. Removal
of these materials is carried out by bacterial organisms in the secondary
treatment process. Secondary treatment at the Back River Plant prxor to
1988 was accomplished by two methods, trickling filters and activated
sludge. The trickling filter units were phased out in 1988 with all
secondary treatment by activated sludge after 1988.
The activated sludge process uses aerobic microorganisms to feed on
suspended and dissolved organic material for growth and reproduction. The
primary effluent is conveyed to four parallel aeration basins in the old
activated unit and to , six aeration basins in the new activated unit where
aie is added to maintain a high dissolved oxygen concent. Return activated
C-l
-------
sludge (RAS) is also returned from the final settling tanks to the aeration
basins to maintain treatment bicmass concentration. Flow frcm the aeration
basins is conveyed to four old plus twelve new final settling tanks.
Approximately 60-80 percent of the settled sludge is returned to the
aeration basins and the remainder pumped for thickening in the solids
handling process. Theoretically, this return rate of waste activated sludge
allows an entirely new population of microorganisms to be brought into the
system, every five to tea days. Effluent from the settling tanks is then
either chlorinated or sent to Bethlehem Steel at Sparrows Point for use as
industrial water.
Disinfection by chlorination and dechlorination by sulfur dioxide, and
re-aeration in a cascade system, are the last treatment steps before
discharge to Back River. This new system was started up in September, 1939,
and provides about 1/2 hour detention time in the chlorine contact
chambers. This contact time achieves a disinfection"level, as measured by
fecal colifora concentration, to meet a permit of less than a MPH (Host
Probable Number) of 200 per 100 ml. After this chlorination. sulfur dioxice
is added for a detention time of about. S minutes which permits
neutralization of any excess residual chlorine, thus eliminating this toxic
material in the effluent. Finally, the fully treated plant effluent spills
down a step-dam cascade system to reaerate the effluent and increase the ¦
D.O. (dissolved oxygen) to above the minimum permit level of 5.0 ppm. This
will treated, neutralized, and oxygenated effluent then passes to a 1,000
ft. long outfall-fishing pier combination where it is diffused into Back
River. There is a good population of minnows and other fish at these
discharge sites, probably attracted by the high oxygen level of this treated
affluent.
Equally as important as the treatment of wastewater is the handling of
its by-product, sludge. At the Back River Plant, solids receive three
stagfts of handling prior to disposal: thickening, digestion/stabilization,
and dewatering.
Thickening of sludge at the Back River Wastewater Treatment Plant is
accomplished by two methods, gravitation and dissolved air flotation.
Solids from primary treatment is pumped to eight 65 feet diameter
gravxty-thickening tanks for concentration from a dilute liquid (1% solid)
to thickened sludge (4-6% solids). Solids from secondary treatment., which
is lighter and more readily floatable than priscary solids, are processed in
two Westech 50 feet diameter dissolved air flotation tanks and two Siaco <50
feet diameter tanks for concentration, to 4-6% solids. Thickened sludge iraa
both gravitation and dissolved air flotation is then pumped into the high
rate anaerobic digesters for stabilisation or is stabilized by lime addition.
Lime stabilization or thickened sludge at the Back River Wastewater
Treatment Plant is accomplished by lime addition to the sludge after
dewatering it by using belt filter presses, and then mixing lime and sludge
in a mechanical mixer. Lime addition to sludge reduces odors and pathogen
levels by creating a high pH environment hostile to biological activity.
When lime is added, microorganisms involved in odor production are strongly
inhibited or destroyed, similarly, pathogens are inactivated or destroyed
by the lime addition.
C-2
-------
Digestion is a biological treatment, where anaerobic bacteria decompose
and stabilize the organics in the sludge to produce digested sludge and
methane gas. This methane gas is used for heating the digestion process,
which operates at 95 degrees Fahrenheit, and also to heat the various plant
buildings. Excess gas is sold to Baltimore Gas & Electric and is processed
through their Biogas Plant prior to use by consumers.
After digestion, the sludge is conditioned with polymers and
dewatered. Two solid bowl conveyor centrifuges are used to devater the
sludge, the solid bowl centrifuges use a large solid walled bowl with a
horizontal axis rotation. Centrifugal force developed by the rotation
caused the solid-liquid separation. The solids being denser are settled
against the bowl wall and are continuously scraped off by a helical screw
conveyor. The centrifuges concentrate the sludge from a thick liquid slurry
of 6% solids to cake of 20 to 25% solids. Currently, an average of 500 wet
tons per day of digested sludge cake are produced. In addition,
approximately 100 wet tons per day of lime-stabilized sludge is produced.
Digested and lime-stabilized sludge can serve both as a soli
conditioner and as a partial replacement for commercial fertilizer.
Presently, the sludge disposal plan practiced at the Sack River Plant
is a combination of incorporation of sludge on marginal land in order to
decrease soil erosion and establish vegetative cover and composting of
sludge for marketing as a son fertilizer. These services are provided by
independent sludge disposal companies who are awarded contracts by the City
of Baltimore.
C-3
-------
-------
TECHNICAL REPORT DATA , N
(Please read Instructions on the reverse before compie || | |||| || |||||| |(|j ||||| || |||
1. REPORT NO- 2.
EPA - 600/R-9 5-034
% in "in iiin inn j
\ PB95-187381" )
4. TITLE AND SUBTITLE J3emonsj.raj.|on JTuel CdlS tO ECCOVer
Energy from an Anaerobic Digester Gas; Phase I. Con-
ceptual Design, Preliminary Cost, and Evaluation
Study
5. REPORT DATE
March 1995
6. PERFORMING ORGANIZATION CODE
7. AUTHOR(S)
J. C. Trocciola and H. C. Healy
8. PERFORMING ORGANIZATION REPORT NO.
FCR- 12958ITI Zi
9. PERFORMING OROANIZATION NAME AND ADDRESS
International Fuel Cells Corporation
P. 0. Box 739
South Windsor, Connecticut 06074
10. PROGRAM ELEMENT NO.
11. CONTRACT/GRANT NO.
68-D2-0186
12. SPONSORING AGENCY NAME AND ADDRESS
EPA, Office of Research and Development
Air and Energy Engineering Research Laboratory
Research Triangle Park, NC 27711
13. TYPE OF REPORT AND PERIOD COVERED
Final; 2-8/94
14. SPONSORING AGENCY CODE
EPA/600/13
is. supplementary notes project officer is Susan A. Thorneloe", Mail Drop 63, 919/
541-2709.
1®i.ABSTRAC^The report discusses Phase I (a conceptual design, preliminary cost, and
evaluation study) of a program to demonstrate the recovery of energy from waste
methane produced by anaerobic digestion of waste water treatment sludge. The fuel
cell is being used for this application because it is potentially one of the cleanest
energy technologies available. This program is focused on utilizing a commercial
Phosphoric Acid-Fuel Cell (PAFC) power plant because of its inherently high fuel
efficiency, low emissions characteristics, and high state of development. The envi-
ronmental impact of widespread use of this concept would be a significant reduction
in global warming and acid rain air emissions4;The conceptual design of the fuel cell
energy system is described and its economic and environmental feasibility is projec-
ted. Technology evaluations aimed at improving the phosphoric acid power plant
operation on anaerobic digester gas (ADG) are described and two options for comple-
ting the overall project are described: Option 1 addresses the technical issues of ADG
contaminant removal and improved fuel cell power plant performance on low-Btu
fuel, and Option II is a planned 1-year field performance evaluation of the energy re-
covery concept. The demonstration will document the environmental and economic
feasibility of the fuel cell energy recovery concept.
17. KEY WORDS AND DOCUMENT ANALYSIS
a. DESCRIPTORS
b.IDENTIFIERS/OPEN ENDED TERMS
c. cosati Field/Group
Pollution Methane
Fuel Cells Sludge
Phosphoric Acids Waste Treatment
Energy Waste Water
Anaerobic Processes
Digesters
Pollution Control
Stationary Sources
13B 07 C
10 B
07B
14G
06 C
131, 07A
13- DISTRIBUTION STATEMENT
Release to Public
19. SECURITY CLASS (This Report)
Unclassified
21. NO. OF PAGES
78
20. SECURITY CLASS (Thispage)
Unclassified
22. PRICE
EPA Form 2220*1 (9-73)
-------