Safe Drinking Water Act Construction Grant Priority List FY 2023 - FY 2024 District of Columbia Priority Rank Priority Rank Score (see Attachment 1) Name / Description (Remarks) Fiscal Year Estimated Eligible Cost Anticipated Federal Share Target Grant Application 1 Total score 58 1 Health 20 2 Regulatory 25 3 Reliability, safety, environment 13 Soldiers' Home Transmission Main DC Water Job No. F602 - This project includes the renewal of the48inch steel Soldier's Heme reservoir inlet/outlet transmission water main. FY2024 $7,036,733 $5,629,386 10/2023 2 Total score 58 1 Health 20 2 Regulatory 25 3 Reliability, safety, environment 13 Water Main on Bridaes Reoairs Contract 1 DC Water Job No. FT07 - This project includes the rehabilitation of water mains on bridges (contract 1). The need was identified as part of the annual inspection program of water mains cn bridges. Rehabilitation measures include replacement of pipe supports, pipe clamps, and coating of pipes. FY2024 $2,925,000 $2,340,000 10/2023 3 Total score 58 1 Health 20 2 Regulatory 25 3 Reliability, safety, environment 13 Water Mains on Bridaes II DC Water Job No. FT08 - This project includes the rehabilitation of water mains on bridges (contract 2). The need was identified as part of the annual inspection program of water mains cn bridges. Rehabilitation measures include replacement of pipe supports, pipe clamps, and coating of pipes. FY2024 $1,940,000 $1,552,000 02/2024 4 Total score 32 1 Health 20 2 Regulatory 0 3 Reliability, safety, environment 12 Sorina PlaceNW (w/Sewer A433) DC Water Job No. MV02 - This project includes the rehabilitation of small diameter water mains using the cure-in-p lace-pipe technology. This project is part of the DC Water Board mandate of renewing 1% of the distribution water mains annually. FY2024 $2,637,923 $2,110,338 08/2023 5 Total score 32 1 Health 20 2 Regulatory 0 3 Reliability, safety, environment 12 Rehabilitation of the 66" Steel 8th St Low Service Main DC Water Job No. JZ02 - This project is to replace/ rehabilitate large diameter (16-inch and larger) pipe based upon age, break history and condition assessment information. The project is part of the large diameter water main program included in the draft Water System Facility Plan Update. FY2024 $18,394,500 $14,715,600 07/2024 6 Total score 30 1 Health 20 2 Regulatory 0 3 Reliability, safety, environment 10 Small Diameter Water Main Rehabilitation 18a DC Water Job No. KE01 - this annual project is for the rehabilitation of small diameter (12-inch and smaller) water pipe at various locations in the city. The objective is to replace pipe when the condition warrants replacement, or to clean and line unlined cast iron pipe provided the pipe is in serviceable condition. FY2023 $12,000,000 $9,600,000 01/2023 7 Total score 30 1 Health 20 2 Regulatory 0 3 Reliability, safety, environment 10 Small Diameter Water Main Rehabilitation 18b DC Water Job No. KE02 - this annual project is for the rehabilitation of small diameter (12-inch and smaller) water pipe at various locations in the city. The objective is to replace pipe when the condition warrants replacement, or to clean and line unlined cast iron pipe provided the pipe is in serviceable condition. FY2024 $12,000,000 $9,600,000 05/2023 8 Total score 30 1 Health 20 2 Regulatory 0 3 Reliability, safety, environment 10 Small Diameter Water Main Rehabilitation 18c DC Water Job No. KE03 - this annual project is for the rehabilitation of small diameter (12-inch and smaller) water pipe at various locations in the city. The objective is to replace pipe when the condition warrants replacement, or to clean and line unlined cast iron pipe provided the pipe is in serviceable condition. FY2024 $13,340,000 $10,672,000 10/2023 9 Total score 30 1 Health 20 2 Regulatory 0 3 Reliability, safety, environment 10 Small Diameter Water Main Renewal 19a DC Water Job No. KF01 - this annual project is for the rehabilitation of small diameter (12-inch and smaller) water pipe at various locations in the city. The objective is to replace pipe when the condition warrants replacement, or to clean and line unlined cast iron pipe provided the pipe is in serviceable condition. FY2024 $18,860,000 $15,088,000 01/2024 ------- Priority Rank Priority Rank Score (see Attachment 1) Name / Description (Remarks) Fiscal Year Estimated Eligible Cost Anticipated Federal Share Target Grant Application 10 Total score 30 3 Reliability, safety, environment 10 Small Diameter Water Main Renewal 19b DC Water Job No. KF02 - this annual project is for the rehabilitation of small diameter (12-inch and smaller) water pipe at various locations in the city. The objective is to replace pipe when the condition warrants replacement, or to clean and line unlined cast iron pipe provided the pipe is in serviceable condition. FY2024 $18,795,000 $15,036,000 03/2024 14 Total score 30 1 Health 20 3 Reliability, safety, environment 10 FY 2024 DWS Water Proiect DC Water Job No. KZ01 - The Infrastructure Repair and Replacement contract augments the Water Services in-house repair crews by making contractor crews, equipment, and resources available on an ongoing (24/7) basis to perform emergency repair and replacements of various assets in the water system infrastructure. This contract is also designed to assist with large and complex system repair and rehabilitation projects that require specialized technical expertise and equipment These special projects have been of varying scope ranging from internal inspection and joint seal repair of large mains to installation of large valves (6th St &M StNE, Georgia Ave & Missouri AveNE) as well as rehabilitation of reservoirs including joint/crack sealing, installing water/sewer pipes, electrical conduits, and mechanical/electrical equipment. Additionally, large number of out-of-service fire FY2024 $14,517,000 $11,613,600 10/2023 15 Total score 30 1 Health 20 3 Reliability, safety, environment 10 FY 2025 DWS Water Proiect DC Water Job No. L101 - The Infrastructure Repair and Replacement contract augments the Water Services in-house repair crews by making contractor crews, equipment, and resources available on an ongoing (24/7) basis to perform emergency repair and replacements of various assets in the water system infrastructure. This contract is also designed to assist with large and complex system repair and rehabilitation projects that require specialized technical expertise and equipment These special projects have been of varying scope ranging from internal inspection and joint seal repair of large mains to installation of large valves (6th St &M StNE, Georgia Ave & Missouri AveNE) as well as rehabilitation of reservoirs including joint/crack sealing, installing water/sewer pipes, electrical conduits, and mechanical/electrical equipment. Additionally, large number of out-of-service fire FY2025 $14,780,000 $11,824,000 10/2024 ------- Priority Rank Priority Rank Score (see Attachment 1) Name / Description (Remarks) Fiscal Year Estimated Eligible Cost Anticipated Federal Share Target Grant Application 17 Ft. Reno Purrm Station Upgrades -1 FY2024 $6,430,000 $5,144,000 06/2024 1 Health 2 Regulatory 3 Reliability, safety, environment 20 0 10 DC Water Job No. OR01 - This project provides for the replacement of pumps, motors and other equipment at the Fort Reno Pumping Station, along with other mechanical, instrmentation, and electrical improvements and related civil works. 18 Rehabilitation of Elevated Water Stcraae Tanks FY2024 $5,000,000 $4,000,000 07/2024 1 Health 2 Regulatory 3 Reliability, safety, environment 20 0 10 DC Water Job No. HW01 - This project consists of rehabilitation of the exterior coating systemsfor: Anacostia Elevated Tank No. 1 (ATI, Good Hope Tank), and Anacostia Elevated Tank No. 2 (AT2, Boulevard Tank). 20 Ft Stantcn Reservoir No. 1 Rehabilitation FY2023 $7,128,000 $5,702,400 08/2023 2 Regulatory 0 DC Water Job No. QG03 - This job is for the repair and upgrade of the Fort Stanton Reservoir No. 1 to extend its remaining life through 2045. The major scope items included are water loss control (leakage control) and redirecting drain and overflow discharge to sanitary sewer. Additionally, other design minor scope items such as mechanical mixer upgrades, water quality monitoring upgrades, access building upgrades, etc. 21 FY2025 $18,221,000 $145,768,000 12/2024 1 Health 2 Regulatory 3 Reliability, safety, environment 20 0 10 DC Water Job No. KH01 - This annual project is for the renewal of small diameter (12- inch and smaller) water mains. The objective is to replace pipe when the condition warrants. Wcrk includes the elimination of dead-end pipelines in the system and the replacement of appurtenances, such as valves, fire hydrants, and house service lines. The program serves to gradually renew deteriorated pipe and to improve available flows and water quality. 22 Small Diameter Renewal 19C FY2025 $18,795,000 $15,036,000 12/2024 1 Health 2 Regulatory 3 Reliability, safety, environment 20 0 10 DC Water Job No. KF03 - This annual project is for the renewal of small diameter (12- inch and smaller) water mains. The objective is to replace pipe when the condition warrants. Work includes the elimination of dead-end pipelines in the system and the replacement of appurtenances, such as valves, fire hydrants, and house service lines. The program serves to gradually renew deteriorated pipe and to improve available fire flows and water quality. 23 WSSC Interconnections Project FY2024 $5,302,000 $4,241,600 08/2024 1 Health 2 Regulatory 3 Reliability, safety, environment 20 0 10 DC Water Job No. U501 - The project involves improvements to five interconnection locations between DC Water and WSSC water distribution systems. There are twelve existing interconnections between the two systems. As part of the project, four existing locations will be improved and one new interconnection location will be constructed. The scope of the improvements includes installation of short sections of new piping, valves, fittings and site improvements associated with construction at the locations. 24 Out of Service LDWM Elimination FY2023 $8,810,000 $7,048,000 02/2023 1 Health 2 Regulatory 3 Reliability, safety, environment 20 0 10 The sccpe of this project will be eliminating dead ends along large diameter water mains at several locations within the DC Water distribution system. 25 Total score 30 Small Diameter Water Main Renewal 16C FY2023 $15,780,000 $12,624,000 01/2023 ------- o o o o Disadvantaged Areas HF01 HW01 MQ04 QG01 QG03 U501 F602 FT03 ' FT07 FT08 ¦ HX03 1 JZ02 KE01 > KE02 1 KE03 ¦ KF01 ¦ KF02 MV02 DISTRICT of COLUIVIBIA WATER and SEWER AUTHORITY Projects in DAC for the IUP/PPL Supplemental Funding Scale: Map prepared by DETS-GIS on 1/17/2023 Job Code Activity Name In Disadvantaged Area? Job Code Activity Name In Disadvantaged Area? F602 Soldiers' Home Transmission Main No KE02 Small Dia Water Main Rehab 18B Yes FT03 Out of Service LDWM Elimination Contract 1 Yes KE03 Small Dia Water Main Rehab 18C Yes FT07 Water Main on Bridges Repairs Contract 1 Yes KF01 SDWM Renewal 19A No FT08 Water Mains on Bridges II Yes KF02 SDWM Renewal 19B Yes HF01 Fort Reno Pump Station - Field Ops Facility West No MQ04 Ft. Reno Elevated Tank No. 2 Abandonment No HW01 Rehabilitation of Elevated Water Storage Tanks Yes MV02 Spring Place NW (w/Sewer A433) Yes HX03 SDWM Renewal 16C Yes QG01 Ft. Stanton Reservoir No. 2 Abandonment Yes JZ02 Rehab of the 66" Steel 8th St Low Service Main No QG03 Ft. Stanton Reservoir No. 1 Rehabilitation Yes KE01 Small Dia Water Main Rehab 18A No U501 WSSC Interconnections Proj No ------- |