Clean Air Status and Trends Network

Third Quarter 2023 Quality Assurance Report

Summary of Quarterly Operations (July through September)

EPA Contract No. 68HERH21D0006

Introduction

This quarterly report summarizes results from the Clean Air Status and Trends Network (CASTNET)
quality assurance/quality control (QA/QC) program for data collected during third quarter 2023. The
various QA/QC criteria and policies are documented in the CASTNET Quality Assurance Project Plan
(QAPP; WSP, 2022). The QAPP is comprehensive and includes standards and policies for all
components of project operation from site selection through final data reporting. It is reviewed
annually and updated as warranted.

Quarterly Summary

During July 2023, WSP's CASTNET QA Manager was notified via EPA Chief Information Officer
directives that EPA's QA/R-5, "EPA Requirements for QA Project Plans" had been superseded by
"Quality Assurance Project Plan Standard" (CIO 2105-S-02.0). The QA Manager evaluated the
changes and verified the effects of the updates on the CASTNET QAPP Revision 10.1. The only
update required by the new standard was to identify the providers of the subcontracted field
technicians: Inquest Environmental, Inc.; Trinity Consultants, Inc.; and S&P AQS. The QAPP
Revision 10.1 includes rebranding from Wood Environment & Infrastructure Solutions, Inc. to WSP
Environment & Infrastructure Inc. (WSP) and updates to identify field subcontractors to align with the
new directive. WSP will submit Revision 10.1 to EPA for review and comment during fourth
quarter 2023.

The WSP Quality Management Plan (QMP) is under the purview of the WSP Regional Quality
Manager who is also the CASTNET Project QA Supervisor. The QA Manager notified the Project QA
Supervisor that EPA's QA/R-2, "EPA Requirements for Quality Management Plans" had been
superseded by "Quality Management Plan Standard" (CIO 2105-S-01.1).

WSP submitted results of analyses for proficiency test (PT) study 122 for Rain and Soft Waters to the
Water Science and Technology (WS&T) Directorate, a branch of Environmental Science and
Technology Laboratories with ECCC. The WS&T Directorate provides quality assurance and
proficiency testing services. Total nitrogen was one of the parameters offered under PT study 122,
and WSP submitted results of analyses of total nitrogen along with the standard CASTNET
parameters analyzed for PT studies. Final results were rated, "Good." However, two calcium values
and three sodium values were flagged indicating potential low bias. WSP is currently troubleshooting
the cause of the low values and has contacted PerkinElmer, the manufacturer of the inductively
coupled plasma-optical emission spectrometry (ICP-OES) instrument used to analyze the PT
samples. There has been no indication of recent bias in CASTNET samples or standards. A corrective
action has been initiated.

Preparation of the presentation for the annual management review and report in support of
International Organization for Standardization (ISO)/lnternational Electrotechnical Commission (IEC)
17025:2017 accreditation was completed, and the CASTNET QA Manager scheduled the

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 1 of 18


-------
EPA Contract No. 68HERH21D0006

CASTNET Quality Assurance Report - Third Quarter 2023

presentation for July 26, 2023. Attendees included the CASTNET Project QA Supervisor, CASTNET
management team, WSP regional management, and WSP QA management.

EEMS performed annual performance evaluation (PE) audits of the ROM406/206 co-located ozone
systems on August 17, 2023. The ozone system used for regulatory purposes is the ROM406 system.
EEMS notified WSP that the ROM206 site failed the audit. A WSP field technician tested the analyzer
and solenoids and found no problems. The zsp QC checks of the ROM206 site analyzer were within
criteria. However, the ROM206 analyzer was slower to respond than the ROM406 analyzer during the
audit. Co-located responses compared well during routine ambient monitoring both before and after
the audit. WSP replaced the ozone analyzer. Once the ozone analyzer that was in operation during
the August PE audit is returned to WSP's Gainesville office, it will be evaluated to try to determine the
cause of the problem.

Additionally, during the ROM206 PE audit, EEMS noted the temperature probe shield at the site as
not being located properly in accordance with the CASTNET QAPP. WSP reviewed the QAPP
temperature probe placement requirement. It states that probe inlets be "pointed north or otherwise
positioned to avoid radiated heat sources such as buildings, walls, etc."

During a PE audit by EEMS at the MCK131/231, KY site, the Nafion dryer at the MCK231 site was
broken. As a result, WSP believes the MCK131/231 audit results were suspect. The MCK231 Nafion
dryer stopped working as of September 22, 2023. The ozone analyzer at MCK231 is currently
operating without the Nafion dryer.

A temperature sensor at the PARI 07, WV site failed a PE audit at the highest level (49C) on
August 8, 2023. A corrective action has been opened as required under accreditation requirements for
ISO/IEC 17025:2017 accreditation by the A2LA.

EPA Region 3 contacted EPA CAMD to offer a "mini" technical systems audit (TSA) of the ozone
system at the PARI07 site consisting of a field site visit but no laboratory facility audit. WSP
coordinated the field site TSA on August 21, 2023, with the site operator and EPA Region 3. The
Region 3 auditor was very thorough with her assessment of the site operator's abilities and the
CASTNET ozone system. The site audit went well. The auditor contacted the QA Manager and
expressed satisfaction with the site operator's level of knowledge and cooperation.

The CASTNET Project Manager found a problem with the hourly flow data that was related to an
issue with the NPS/BLM continuous data exports received by WSP. Some flow data were flagged
incorrectly. Concentration data for 2000 through 2023 were rerun to correct the flagging errors and
recalculate weekly values.

Table 1 lists the quarters of data that were validated to Level 3 during third quarter 2023 by site
calibration group. Table 2 lists the sites in each calibration group along with the calibration schedule.
Table 3 presents the measurement criteria for laboratory filter pack measurements. These criteria
apply to the QC samples listed in the following section of this report. Table 4 presents the critical
criteria for ozone monitoring. Table 5 presents the critical criteria for trace-level gas monitoring.

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 2 of 18


-------
EPA Contract No. 68HERH21D0006

CASTNET Quality Assurance Report - Third Quarter 2023

Quality Control Analysis Count

The QC sample statistics presented in this report are for reference standards (RF) and continuing
calibration verification spikes (CCV) used to assess accuracy and for replicate sample analyses (RP)
used to assess "in-run" precision. In addition, laboratory method blanks (MB) containing reagents
without a filter; laboratory blanks (LB) containing reagents and a new, unexposed filter; and field
blanks (FB) containing reagents and an unexposed filter that was loaded into a filter pack assembly
and shipped to and from the monitoring site while remaining in sealed packaging are also included.
Table 6 presents the number of analyses in each category that were performed during third
quarter 2023.

Sample Receipt Statistics

Ninety-five percent of field samples from EPA-sponsored sites must be received by the CASTNET
laboratory in Gainesville, FL no later than 14 days after removal from the sampling tower. Table 7
presents the relevant sample receipt statistics for third quarter 2023.

Data Quality indicator (DQI) Results

Figures 1 through 3 present the results of RF, CCV, and RP QC sample analyses for third quarter
2023. All results were within the criteria listed in Table 3.

Table 8 presents summary statistics of critical criteria measurements at ozone sites collected during
third quarter 2023. The statistics presented contain data validated at Level 2 and Level 3. All data
associated with QC checks that fail to meet the criteria listed in Table 4 were or will be invalidated
unless the cause of failure has no effect on ambient data collection, and passing results still meet
frequency criteria. Results in shaded cells either exceed documented criteria or are otherwise notable.
Table 9 presents observations associated with the shaded cell results in Table 8.

Table 10 presents summary statistics of critical criteria measurements at trace-level gas monitoring
sites collected during third quarter 2023. The statistics presented contain data validated at Level 2
and Level 3. All data associated with QC checks that fail to meet the criteria listed in Table 5 were
or will be invalidated unless the cause of failure has no effect on ambient data collection, and
passing results still meet frequency criteria. Results in shaded cells either exceed documented
criteria or are otherwise notable. Table 11 presents observations associated with the shaded cell
results in Table 10.

Laboratory Control Sample Analysis

The laboratory control sample (LCS) is a reagent blank spiked with the target analytes from the
established analytical methods and carried through the same extraction process that field samples
must undergo. LCS analyses are performed by the laboratory to monitor for potential sample handling
artifacts and provide a means to identify possible analyte loss from extraction to extraction. Figure 4
presents LCS analysis results for third quarter 2023. All recovery values were between 85.9 percent
and 109.6 percent.

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 3 of 18


-------
EPA Contract No. 68HERH21D0006

CASTNET Quality Assurance Report - Third Quarter 2023

Blank Results

Figures 5 through 7 present the results of MB, LB, and FB QC sample analyses for third quarter 2023.
All third quarter results were within criteria (two times the reporting limit) listed in Table 3.

Suspect/Invalid Filter Pack Samples

Filter pack samples that were flagged as suspect or invalid during third quarter 2023 are listed in
Table 12. This table also includes associated site identification and a brief description of the reason
the sample was flagged. During third quarter, nine filter pack samples were invalidated.

Field Problem Count

Table 13 presents counts of field problems affecting continuous data collection for more than one day
for third quarter 2023. The problem counts are sorted by a 30-, 60-, or 90-day time period to
resolution. A category for unresolved problems is also included.

References

American Society for Testing and Materials (ASTM). 2022. ASTM E29-22, "Standard Practice for
Using Significant Digits in Test Data to Determine Conformance with Specifications." ASTM
International, West Conshohocken, PA, DOI:10.1520/E0029-22. www.astm.org.

U.S. Environmental Protection Agency (EPA). 2022. Title 40 Code of Federal Regulations Part 58,
"Appendix A to Part 58 - Quality Assurance Requirements for Monitors used in Evaluations of
National Ambient Air Quality Standards."

WSP USA Environment & Infrastructure Inc. (WSP) formerly known as Wood USA Environment &
Infrastructure Inc. 2022. Clean Air Status and Trends Network (CASTNET) Quality
Assurance Project Plan (QAPP) Revision 9.5. Prepared for the U.S. Environmental Protection
Agency, Office of Air and Radiation, Office of Atmospheric Protection, Clean Air Markets
Division, Washington, DC. Contract No. 68HERH21D0006. Gainesville, FL.
https: //j ava. e pa. g ov/castn et/docu m e nts. do.

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 4 of 18


-------
EPA Contract No. 68HERH21D0006	CASTNET Quality Assurance Report- Third Quarter 2023

Table 1 Data Validated to Level 3 through Third Quarter 2023

Calibration Group*

Months Available

Number of Months

Complete Quarters

Number of
Quarters

E-3/W-10t

November 2022-
April 2023

6

Quarter 1 2023

1

SE-4/MW-6*

January 2023-
June 2023

6

Quarter 1 2023-
Quarter2 2023

2

Notes: "The sites contained in each calibration group are listed in Table 2.
~Contains ROM206 of the ROM406/ROM206 co-located pair
~Contains MCK131/231 co-located pair

Table 2 Field Calibration Schedule for 2023

Calibration
Group

Months Calibrated

Sites Calibrated

Eastern Sites (22 Total)

E-1

(8 Sites)

February/August

BEL116, MD WSP 144, NJ ARE128, PA PED108, VA
BWR139, MD CTH110, NY PSU106, PA VPI120, VA

E-2

(9 Sites)

April/October

ABT147, CT CAT175, NY NIC001,NY
ASH135, ME HWF187, NY1 EGB181,ON
WST109, NH WFM105, NY UND002, VT

E-3

(5 Sites)

May/November

KEF112, PA LRU 17, PA CDR119,WV
MKG113, PA PARI07, WV

Southeastern Sites (11 Total)

SE-4

(7 Sites)

January/July

SND152, AL BFT142, NC COW137, NC SPD111,TN
GAS 153, GA CND125, NC DUK008, NC1

SE-5
(4 Sites)

February/August

CAD150, AR SUM156, FL
IRL141, FL CVL151, MS

Midwestern Sites (18 Total)

MW-6
(6 Sites)

January/July

CDZ171, KY MCK131, KY PNF126, NC1
CKT136, KY MCK231, KY ESP127, TN

MW-7
(8 Sites)

March/September

BVL130, IL2 VIN140, IN DCP114, OH QAK172, OH
STK138, IL RED004, MN OXF122, OH PRK134,WI

MW-8
(4 Sites)

April/October

SAL133, IN ANA115, Ml
HOX148, Ml UVL124, Ml

Western Sites (13 Total)

W-9
(5 Sites)

March/September

KNZ184, KS CHE185, OK ALC188, TX
KIC003, KS SAN189, NE

W-10
(8 Sites)

May/November

LPO010, CA ROM206, CO3 PAL190, TX CNT169,WY
GTH161, CO NPT006, ID UMA009, WA PND165,WY3

Notes: 1Trace-level gas calibrations are performed quarterly in January, April, July, and October.

2Trace-level gas calibrations are performed quarterly in March, June, September, and December.
3Trace-level gas calibrations are performed quarterly in February, May, August, and November.

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 5 of 18


-------
EPA Contract No. 68HERH21D0006	CASTNET Quality Assurance Report- Third Quarter 2023

Table 3 Data Quality Indicators forCASTNET Laboratory Measurements

Analyte

Method

Precision1
(MARPD)

Accuracy2
(%)

Nominal Reporting Limits3

mg/L

jjg/Filter

Ammonium (NH4)

AC

20

90-110

0.020*

0.5

Sodium (Na+)

ICP-OES

20

95-105

0.005

0.125

Potassium (K+)

ICP-OES

20

95-105

0.006

0.15

Magnesium (Mg2+)

ICP-OES

20

95-105

0.003

0.075

Calcium (Ca2+)

ICP-OES

20

95-105

0.006

0.15

Chloride (CI )

IC

20

95-105

0.020

0.5

Nitrate (N03)

IC

20

95-105

0.008*

0.2

Sulfate (SO4)

IC

20

95-105

0.040

1.0

Notes: 1This column lists precision goals for both network precision calculated from co-located filter samples and laboratory precision based
on replicate samples for samples > five times the reporting limit. The criterion is ± the reporting limit if the sample is < five times the
reporting limit.

2This column lists laboratory accuracy goals based on reference standards and continuing calibration verification spikes. The

criterion is 90-110 percent for ICP-OES reference standards.

3The reporting limit for sulfate on cellulose filters is 0.080 mg/L (2.0 |jg/filter).

AC	= automated colorimetry

IC	= ion chromatography

ICP-OES	= inductively coupled plasma-optical emission spectrometry

MARPD	= mean absolute relative percent difference

mg/L	= milligrams per liter

|jg/Filter	= micrograms per filter

*	= as nitrogen

Values are rounded according to American Society for Testing and Materials (ASTM) E29-22, "Standard Practice for Using
Significant Digits in Test Data to Determine Conformance with Specifications" (ASTM, 2022).

For more information on analytical methods and associated precision and accuracy criteria, see the CASTNET QAPP, (WSP, 2022).

Table 4 Ozone Critical Criteria*

Type Check

Analyzer Response

Zero

Less than ± 3.1 parts per billion (ppb)

Span

Less than ± 7.1 percent between supplied and observed concentrations

Single Point QC

Less than ± 7.1 percent between supplied and observed conentrations

Notes: 'Applies to CASTNET sites that are configured and operated in accordance with Part 58 of Title 40 of the Code of Federal
Regulations (EPA, 2022). The minimum frequency for these checks is once every two weeks.

Values are rounded according to ASTM E29-22, "Standard Practice for Using Significant Digits in Test Data to Determine
Conformance with Specifications" (ASTM, 2022).

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 6 of 18


-------
EPA Contract No. 68HERH21D0006	CASTNET Quality Assurance Report- Third Quarter 2023

Table 5 Trace-level Gas Monitoring Critical Criteria*

Parameter

Analyzer Response

Zero Check

Span Check / Single Point QC Check

so2

Less than ± 1.51 ppb

Less than ±10.1 percent between supplied and
observed concentrations

NOy

Less than ± 1.51 ppb

CO

Less than ± 50 ppb

Notes: 'Applies to CASTNET sites that are configured and operated in accordance with Part 58 of Title 40 of the Code of Federal
Regulations (EPA, 2022). The minimum frequency for these checks is once every two weeks.

Values are rounded according to ASTM E29-22, "Standard Practice for Using Significant Digits in Test Data to Determine
Conformance with Specifications" (ASTM, 2022).

SO, =	sulfur dioxide

NOy =	total reactive oxides of nitrogen

CO =	carbon monoxide

ppb =	parts per billion

Table 6 QC Analysis Count for Third Quarter 2023

Filter Type

Parameter

RF Sample
Count

CCV
Sample
Count

RP Sample
Count

MB
Sample
Count

LB Sample
Count

FB Sample
Count

Teflon

S024

54

150

63

13

22

43

no3

54

150

63

13

22

43

nh;

26

135

62

13

22

43

CI"

54

150

63

13

22

43

Ca2+

26

135

62

13

22

43

Mg2+

26

135

62

13

22

43

Na+

26

135

62

13

22

43

K+

26

135

62

13

22

43

Nylon

so2"

27

125

56

8

22

43

no3

27

125

56

8

22

43

Cellulose

S024

38

133

60

12

24

85

Table 7 Filter Pack Receipt Summary for Third Quarter 2023

Count of samples received more than 14 days after
removal from tower:

15

Count of all samples received

652

Fraction of samples received within 14 days:

0.977

Average interval in days:

5.299

First receipt date:

7/1/2023

Last receipt date:

9/27/2023

Note: Sample shipments for the Egbert, Ontario site (EGB181) are in groups of four.
Samples associated with EGB181 are excluded from this statistic.

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 7 of 18


-------
EPA Contract No. 68HERH21D0006	CASTNET Quality Assurance Report- Third Quarter 2023

Table 8 Ozone QC Summary for Third Quarter 2023 (1 of 2)	

Site ID

% Span
Pass1

Span [%D]2

% Single
Point QC
Pass1

Single Point
QC [%D]2

% Zero
Pass1

Zero
Average
(PPb)2

ABT147, CT

100.00

2.79

100.00

2.62

100.00

0.41

ALC188, TX

100.00

0.53

100.00

0.78

100.00

0.34

ANA115, Ml

100.00

1.84

100.00

2.53

100.00

0.40

ARE128, PA

100.00

1.99

100.00

2.44

100.00

0.84

ASH135, ME

N/A

N/A

N/A

N/A

N/A

N/A

BEL116, MD

100.00

1.45

100.00

0.60

100.00

0.32

BFT142, NC

100.00

2.89

100.00

2.94

100.00

0.37

BVL130, IL

100.00

2.24

100.00

3.43

98.88

1.31

BWR139, MD

100.00

1.60

100.00

1.11

98.94

0.43

CAD150, AR

100.00

3.69

100.00

3.74

100.00

0.30

CDR119, WV

N/A

N/A

N/A

N/A

N/A

N/A

CDZ171, KY

N/A

N/A

N/A

N/A

N/A

N/A

CKT136, KY

100.00

1.24

100.00

1.41

100.00

0.15

CND125, NC

100.00

1.38

100.00

1.48

100.00

0.25

CNT169, WY

100.00

2.12

100.00

2.46

100.00

0.65

COW137, NC

100.00

0.60

100.00

1.11

100.00

0.28

CTH110, NY

100.00

1.77

100.00

1.52

100.00

0.18

CVL151, MS

100.00

1.98

100.00

2.12

100.00

0.27

DCP114, OH

N/A

N/A

N/A

N/A

N/A

N/A

DUK008, NC

100.00

2.92

100.00

2.73

100.00

0.99

ESP127, TN

100.00

1.34

100.00

1.55

100.00

0.37

GAS 153, GA

100.00

1.04

100.00

1.92

100.00

0.66

GTH161, CO

100.00

2.36

100.00

2.13

100.00

0.26

HOX148, Ml

94.79

10.02

95.79

9.29

100.00

0.28

HWF187, NY

N/A

N/A

N/A

N/A

N/A

N/A

IRL141, FL

98.88

2.14

100.00

1.79

100.00

0.43

KEF112, PA

100.00

3.35

100.00

1.75

100.00

0.55

LPO010, CA

98.95

1.89

100.00

1.43

100.00

0.46

LRU 17, PA

100.00

1.88

100.00

1.53

100.00

0.35

MCK131, KY

100.00

0.67

100.00

0.83

100.00

0.19

MCK231, KY

88.12

2.75

94.06

2.41

95.00

0.67

MKG113, PA

97.89

4.56

95.79

4.86

96.84

0.80

NPT006, ID

100.00

1.73

100.00

1.86

100.00

0.12

OXF122, OH

100.00

1.62

100.00

1.49

100.00

0.27

PAL 190, TX

100.00

1.92

100.00

2.24

100.00

0.45

PARI 07, WV

100.00

1.50

100.00

1.23

100.00

0.15

PED108, VA

100.00

1.84

100.00

2.21

100.00

0.28

PND165, WY

100.00

3.49

100.00

2.75

100.00

0.73

PNF126, NC

N/A

N/A

N/A

N/A

N/A

N/A

PRK134, Wl

100.00

2.18

97.98

2.32

97.98

0.43

PSU106, PA

96.00

2.64

95.00

5.15

97.00

0.72

QAK172, OH

100.00

1.63

100.00

3.37

100.00

0.65

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 8 of 18


-------
EPA Contract No. 68HERH21D0006	CASTNET Quality Assurance Report- Third Quarter 2023

Table 8 Ozone QC Summary for Third Quarter 2023 (2 of 2)

Site ID

% Span
Pass1

Span [%D]2

% Single
Point QC
Pass1

Single Point
QC [%D]2

% Zero
Pass1

Zero
Average
(ppb)2

ROM206, CO

98.77

1.81

100.00

1.50

100.00

0.21

SAL 133, IN

100.00

1.06

100.00

0.99

100.00

0.34

SAN 189, NE

100.00

1.34

100.00

1.61

100.00

0.27

SND152, AL

100.00

1.28

100.00

1.66

97.89

0.43

SPD111, TN

99.07

1.71

100.00

2.07

100.00

0.56

STK138, IL

100.00

3.50

100.00

3.37

100.00

0.86

SUM156, FL

100.00

2.58

100.00

2.91

100.00

0.15

UMA009, WA

100.00

0.50

100.00

0.69

100.00

0.30

UVL124, Ml

100.00

1.65

98.96

1.17

100.00

0.52

VIN140, IN

100.00

1.44

100.00

1.42

100.00

0.17

VPI120, VA

96.36

1.90

93.33

3.04

96.19

0.60

WSP144, NJ

100.00

1.28

98.84

1.54

96.51

0.48

WST109, NH

N/A

N/A

N/A

N/A

N/A

N/A

Notes: Percentage of comparisons that pass the criteria listed in Table 4. Values falling below 90 percent are addressed in Table 9.

2Absolute value of the average percent differences between the on-site transfer standard and the site monitor. Values exceeding the
criteria listed in Table 4 are addressed in Table 9.

%D =	percent difference

ppb =	parts per billion

Table 9 Ozone QC Observations for Third Quarter 2023

Site ID

QC Criterion

Comments

HOX148, Ml

Span |%D|

Single Point QC |%D|

Site analyer pump failed on 8/14/2023 and was replaced on
8/16/2023. Associated data will be invalidated.

MCK231, KY

% Span Pass

The ozone dryer was broken on 9/22/2023, and the Nation dryer
was bypassed on 9/29/2023.

Note: %D = percent difference

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 9 of 18


-------
EPA Contract No. 68HERH21D0006	CASTNET Quality Assurance Report- Third Quarter 2023

Table 10 Trace-level Gas QC Summary for Third Quarter 2023

Parameter

% Span
Pass1

Span [%D]2

% Single
Point QC
Pass1

Single Point
QC [%D]2

% Zero
Pass1

Zero
Average
(ppb)2

BVL130, IL

so2

100.00

2.48

90.48

5.28

100.00

0.57

NOy

95.65

5.40

95.56

18.99

95.56

2.96

CO

100.00

1.21

100.00

3.76

100.00

24.91

DUK008, NC

NOy

100.00

3.44

100.00

1.73

97.83

2.21

HWF187, NY

NOy

N/A

N/A

N/A

N/A

N/A

N/A

PND126, NC

NOy

100.00

1.78

100.00

2.63

100.00

0.26

PNF126, NC

NOy

N/A

N/A

N/A

N/A

N/A

N/A

ROM206, CO

NOy

97.92

1.77

97.92

2.76

100.00

0.38

Notes: Percentage of comparisons that pass the criteria listed in Table 5. Values falling below 90 percent are addressed in Table 11.

2Absolute value of the average percent differences between the supplied and observed concentrations. Values exceeding the criteria
listed in Table 5 are addressed in Table 11.

%D = percent difference
ppb = parts per billion

Table 11 Trace-level Gas QC Observations for Third Quarter 2023

Site ID

Parameter

QC Criterion

Comments

BVL130, IL

NOy

Single Point QC |%D|

An extra filter was erroneously installed resulting in a
flow restriction. Associated data will be invalidated.

Note: %D = percent difference

Table 12 Filter Packs Flagged as Suspect or Invalid During Third Quarter 2023

Site ID

Sample No.

Reason

CND125, NC

2330001-14
2331001-14

The site had data logger issues due to low voltage
from the battery pack.

CVL151, MS

2331001-18

Data logger issues

KNZ184, KS

2329001-29

Flow pump was left off until the broken knockout
bottle was replaced.

SHE604, WY

2327005-05
2328005-05
2329005-05
2330005-05
2331005-05

The flow pump and the mass flow controller failed.
Both were replaced.

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 10 of 18


-------
EPA Contract No. 68HERH21D0006	CASTNET Quality Assurance Report- Third Quarter 2023

Table 13 Field Problems Affecting Data Collection

Days to Resolution Problem Count

30

324

60

7

90

0

Unresolved by end of quarter

0

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 11 of 18


-------
EPA Contract No. 68HERH21D0006

Figure 1 Reference Standard Results for Third Quarter 2023 (percent recovery)

CASTNET Quality Assurance Report - Third Quarter 2023

RF - Teflon ICP-OES
Ca ¦ Mg• NaA K



































































































o























































o



































8 2



















Q O











2 ~ ~

o









a













L	

A

	A	



£





! J,





-fN







8





8 * °

o 4 o

2

if



8









6

1

$



























o
&

o

o









c













Q

A





o



o

o

0









A















i 4E i













o





&



o





^ O

o

u









A









o

o







O



















8

















u

































7/2/2023



' 7/14/2023

7/26/2023



8/19/2023
8/7/2023

§
ly







9/12/2023



9/24/2023

RF-Teflon IC&AC
~ TS04# TN03# TNH4A Cl



























































































































0



























Oft



o



$ Q

as ce





Q









_





_

A



j









29

o

6d





f6



9

cP

*

&

\



4J



AA^

















G

1	

J



A	







J

4

M



i



a



© 0



Aa

©A



3

A

A



1 s

A

AA





0
o









































8







8





























o









O























o







O









































































i



1









8/31/2023

§ §
1 ^

~ NS04# NHN03

































































































































A







.A













A

AA

AA

.



A

A











A

A

A »

A











.



A















A









o





A





















































































































































































































































































































>







;





8/19/2023



9/12/2023



Analysis Date

A WS02













































































































































































I «











1 l ^i





[*j | |







"A i



aa







o



aa































A

1 *

















A

M









jA "| |



aA





A







e

A !

















I A































r ]



























































































































































































































































































1

3

I





8/19/2023

§



9/12/2023

9/24/2023

Analysis Date

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 12 of 18


-------
EPA Contract No. 68HERH21D0006	CASTNET Quality Assurance Report - Third Quarter 2023

Figure 2 Continuing Calibration Spike Results for Third Quarter 2023 (percent recovery)

Ca ¦ Mg« NaA. K

















































































































0













1















o

A

G



o

r» O

o



















Q j













2 -

























S c













5 |

























B i







\





3 ?

























B 1









I



5

























u f













s







o





















o



2







o





















o































































































7/2/2023





n



7/26/2023





8/7/2023



8/19/2023

8/31/2023

s



9/24/2023

Analysis Date

~ NS04# NHN03



























































































































A

1

A









5







A

*

A

















-a





aa

ft





























AA

J

—*4















-si













A*



1















°S

COD Qf»























6

	A	

wA **A

a .a





A





A

















it 1









A

















aS

























A

























































































































































































:





Analysis Date







ccv

Cellulose IC
A WS02















































































































































105

























































































































j*~ A

























£¦

S 100

i

























































i



























A





















































































95











































































































































































90











































3

1

Analysis Date

8/19/2023

S

i

9/12/2023



WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 13 of 18


-------
EPA Contract No. 68HERH21D0006

CASTNET Quality Assurance Report - Third Quarter 2023

Figure 3 Replicate Sample Analysis Results for Third Quarter 2023 (percent difference)

RP - Teflon ICP-OES
Ca ¦ Mg# NaA K















































































































































































































































































































































A















































A

























o





















r\

o

A

0



o

















c











f







n ft









Q









\ 8





J

1

a

I I

§ s

J



9









I

p



!



B

1







t§

o

RP - Teflon IC & AC
~ TS04# TN03# TNH4A Cl





















































































































































































































































































































































































































o













































o

°8











o

_ f~\







°0



«

A



0



.



0

KJ

0° to





A

i

0°





oA



flt a§



s.

J

t

£

SL22 S



0

1

$

i §

§

6 I



3

ro



s

! |













1

~ NS04# NHN03



























































A





















































































































A











A



A







A







































A

	u	



















































A











aa



















A









A















































A



A



AA





V





A .

A

























A

A

























1*





































A

	^

		





»w

















1 1 !

£ e?

§ i

; g O j

i
'

1

9/12/2023

9/24/2023

Analysis Date

A WS02





























































































































































































































































































































































































































































A 1 '

















































































































































































7/2/2023





I







3

; |



i
i

9/12/2023

9/24/2023

Analysis Date

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 14 of 18


-------
EPA Contract No. 68HERH21D0006

Figure 4 Laboratory Control Sample Results for Third Quarter 2023

LCS - Tenon ICP-OES
Ca ¦ Mg« NaA K













































































	A	

o

©

A



6



A

a o o

a

1 €

—

6

6

A t ,



8













8





























































7/2/2023

3
s

O j

!

9/24/2023
9/12/2023
8/31/2023
8/19/2023

Analysis Date

CASTNET Quality Assurance Report - Third Quarter 2023

(percent recovery)

LCS - Tenon IC & AC
~ TS04# TN03# TNH4A. CI







O













O

9

O °

O <0

0 <
° «

o °

S a fi



8

A



8

n A

o
A



—r i ~—f















































































1
§











9/24/2023

Analysis Date

120



LCS
~

Nylon IC
NS04 ~ NHN03























































115











































110































































105
u 100





A



A









		" * '



1

95













A

A

A

A



























































A













85





















80

s





























j

i





§
1

Analysis Date



9/24/2023
9/12/2023



LCS

Cellulose IC
A WS02





















































115



























































110

























































105





























































£¦





















S 100





















§





















2





















95

































































90













































































85















































80























3 3

"If]

i

Analysis Date

§

9/12/2023



WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 15 of 18


-------
EPA Contract No. 68HERH21D0006

CASTNET Quality Assurance Report - Third Quarter 2023

Figure 5 Method Blank Analysis Results for Third Quarter 2023 (total micrograms)

0.16





MB - Teflon ICP-OES
Ca ¦ Mg« NaA K























® ©

©



©

&

© ©

© (2

a

a

a



0.14













































0.12

o o

o o

o

o

o
o

o c

o

o

o





















0.1

























































| 0.08







































i



















O 0.06































































004































































0.02







































|

7/14/2023



s g
§

o o c
Analysis Date

I

L



MB - Teflon IC & AC
~ TS04# TN03# TNH4A Cl



























































A A

A <5

—!— A



A

A A

A A



A

A



































































































































































































© ©

AO

o ©



© © ©

© ©



©

O A

fftj









































































	Q	Q

o c

	n	

O-

o	Q

o o



©

-O-O--











































































































2 | j





s

; §
§



se

9/24/2023

MB - Nylon IC
~ NS04 4> NHN03

1	A	A	A	A	A	A	 	A—		*-

0.8 ;

1 0.6
§

S

0.4 !

0.2 —

Analysis Dale

A WS02













































































































































































































































































































































































































































































































i i

1 1

8/7/2023

1



i

9/24/2023

Analysis Date

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 16 of 18


-------
EPA Contract No. 68HERH21D0006

CASTNET Quality Assurance Report - Third Quarter 2023

Figure 6 Laboratory Blank Analysis Results for Third Quarter 2023

0.16
0.14

o o o

LB - Teflon ICP-OES
Ca ¦ Mg« NaA K

® a
o o

total micrograms)

LB-Teflon IC&AC
~ TS04# TN03# TNH4A Cl













































































































































































































































































OA OA

0

© OA

OA

OA

OA



OA

OA



































































	o	o

	Q	

o o

c

Q

	o



	Q	

Q	































































































7/26/2023
7/14/2023
7/2/2023

5

; §
§



se

9/24/2023

1.2





LB - Nylon IC
L NS04•

NHN03



























































































































































0.8

















































































c



























1 0.6





















































i

























s























































0.4





































































































































0.2

























































































































0

c































7/14/2023

|

j

: 5
| |
Analysis Date

j

1

N

A WS02



































































































































































































































































































































































































7/14/2023

i

8/7/2023

1



i

9/24/2023

Analysis Date

WSP USA Environment & Infrastructure Inc. - Project No. 6064236203

Page 17 of 18


-------
EPA Contract No. 68HERH21D0006

CASTNET Quality Assurance Report - Third Quarter 2023

Figure 7 Field Blank Analysis Results for Third Quarter 2023 (total micrograms)

FB - Teflon ICP-OES
Ca ¦ Mg« NaA K

o o o











FB - Teflon IC & AC
A TS04# TN03# TNH4A. CI







































































































































































0.8



















































































.1

| 0.6

































































§



















E



s





OAA® Ot

©A ©







8

0.4













































































0.2

	

D









—OCX)	c

	oo	o















































































0

j





















i



1

s

u,
£

1 \

w <
Analysis Dale





i

1.2







FB - Nylon IC

A NS04 ~ NHN03







































































1



&







—A—	A

	A	

A A

A

































0.8







































































c

























1 0.6

















































i



















s







































0.4















































































































0.2









































































































0

?































1 i

Analysis

Date

S»

i '

|















FB - Cellulose IC
A WS02





















































































2.15

























































































2.1















































































§



























2 2.05











































§





















i









































2











































































































































































































































1.9



























;





7/13/2023

3

1

S2

1

Analysis Date

8/18/2023



j

WSP USA Environment & Infrastructure Inc. - Project No, 6064236203

Page 18 of 18


-------