State Review Framework
and Integrated Clean Water
Act Permit Quality Review

Missouri

Clean Water Act
Implementation in Federal Fiscal Year 2013

U.S. Environmental Protection Agency
Region 7, Kansas City

Final Report
January 15,2015

State Review Framework Report | Missouri | Executive Summary | Page 1


-------
Note to Users

This report presents findings and recommendation for the Clean Water Act - National Pollutant
Discharge Elimination System (CWA-NPDES). It is structured in four parts, with one
overarching Executive Summary followed by individual parts for permitting and enforcement
program reviews and an integrated part for findings and recommendations common to permitting
and enforcement. The intent of this structure is to allow the user to look exclusively at just
Permit Quality Review (PQR) or State Review Framework (SRF) enforcement information
individually, or to look at both program parts with an integrated component.

If you are interested in reviewing the CWA PQR information only, see the section titled "CWA-
NPDES Permit Quality Review."

If you are interested in reviewing the SRF information across all programs, look to the section
titled "State Review Framework Report."

The PQR and SRF components of this NPDES program review have been integrated as part of
the EPA's 2009 Clean Water Act Action Plan. The NPDES integrated oversight effort is a way
to provide the EPA with a comprehensive understanding of permitting and compliance elements
of the NPDES program. Integrated reviews reduce the burden on states by having one joint visit
and integrated report. The integrated reviews provide the EPA and the public with a greater
understanding of the challenges of a state NPDES program, and it increases transparency through
making PQR and SRF results publicly available on the EPA's website.

State Review Framework Report | Missouri | Executive Summary | Page 2


-------
Executive Summary

I.	Introduction

The National Pollutant Discharge Elimination System (NPDES) Permit Quality Reviews (PQRs)
and State Review Framework (SRF) oversight reviews of the Missouri Department of Natural
Resources (MDNR) were conducted March 10-13, 2014, by the U.S. Environmental Protection
Agency's (the EPA) Region 7 permitting and enforcement staff.

The Clean Water Act (CWA) NPDES program was reviewed under both SRF and PQR. The
Clean Air Act (CAA) Stationary Source and Resource Conservation and Recovery Act (RCRA)
Subtitle C programs are not included in this report.

SRF findings are based on file metrics derived from file reviews, data metrics, and conversations
with program staff. PQR findings are based on reviews of permit applications, permits, fact
sheets, along with any correspondence, reports or documents that provide the basis for the
development of the permit conditions, and interviews with MDNR staff.

II.	Priority Issues to Address

The following are the top-priority issues affecting the state program's performance:

A.	CWA-NPDES Integrated SRF-PQR Findings

Following are the most significant issues affecting performance of both the permitting and
enforcement programs:

•	MDNR must ensure that permits for all cities currently implementing Pretreatment
programs contain language that requires implementation in accordance with the
requirements of 40 CFR Part 403. Jefferson City, Moberly, Union, Wentzville, St. Peters,
Farmington, and Sullivan are missing implementation requirements.

•	The CAFO site specific permit is not as stringent as the federal requirements. The permit
allows for agricultural stormwater discharges from the production area.

B.	Most Significant PQR CWA-NPDES Findings

From the PQR, EPA found the following issues to be most significant:

•	MDNR is not sufficiently reviewing Notice of Intents to ensure CAFOs applying for the
state no-discharge permit do not discharge to waters of the United States.

•	Federal Rules require that permit applications for major POTWs include three priority
pollutant scans (40 CFR 122.21(j)(4) and 40 CFR 122.21 appendix J), but MDNR is only
requiring one scan from major POTWs.

State Review Framework Report | Missouri | Executive Summary | Page 3


-------
•	The factsheet states that limitations within the permit for the reissuance of permits
conform to the anti-backsliding provisions of Section 402(o) of the Clean Water Law and
40 C.F.R. Part 122.44; however, several effluent parameter limitations have changed or
been eliminated without an explanation as to how they conform to the backsliding
provision.

•	MDNR must ensure that permits for POTWs with pretreatment programs include the
requirement to reevaluate local limits in a timely manner per 40 CFR 122.44(j)(2)(ii)
when the permit has been issued or reissued.

C. Most Significant SRF CWA-NPDES Program Issues1

•	MDNR's database system MoCWIS is not able to accurately upload data to the EPA
ICIS-NPDES database. Environmental compliance data is an important tool for the EPA
and the public to add an additional level of environmental compliance tracking.

•	MDNR does not consistently issue inspection reports in a timely manner. The state has
established protocols which specify the number of days issuing an inspection report. The
state does not consistently meet their established timeframes.

•	MDNR does not consider the economic benefit a facility may have received when the
agency is developing a penalty due to environmental noncompliance. Economic benefit
calculations are an important portion of the penalty evaluation as a facility can receive
significant cost savings if the facility ignored environmental regulations.

1 the EPA's "National Strategy for Improving Oversight of State Enforcement Performance" identifies the following
as significant recurrent issues: "Widespread and persistent data inaccuracy and incompleteness, which make it hard
to identify when serious problems exist or to track state actions; routine failure of states to identify and report
significant noncompliance; routine failure of states to take timely or appropriate enforcement actions to return
violating facilities to compliance, potentially allowing pollution to continue unabated; failure of states to take
appropriate penalty actions, which results in ineffective deterrence for noncompliance and an unlevel playing field
for companies that do comply; use of enforcement orders to circumvent standards or to extend permits without
appropriate notice and comment; and failure to inspect and enforce in some regulated sectors."

State Review Framework Report | Missouri | Executive Summary | Page 4


-------
Table of Contents

CWA-NPDES Integrated SRF and PQR Review	7

I.	Introduction	7

II.	Coordination Between Permitting and Enforcement	8

III.	Integrated Review Background	9

IV.	How Report Findings Are Made	9

V.	Common Findings	10

I.	PQR BACKGROUND	12

II.	STATE PROGRAM BACKGROUND	12

A.	Program Structure	12

B.	Universe and Permit Issuance	14

C.	State-Specific Challenges	17

D.	Current State Initiatives	18

III.	CORE REVIEW FINDINGS	20

A.	Basic Facility Information and Permit Application	20

1.	Facility Information	20

2.	Permit Application Requirements	20

B.	Technology-based Effluent Limitations	21

1.	TBELs for POTWs	21

2.	TBELs for Non-POTW Dischargers	21

C.	Water Quality-Based Effluent Limitations	22

D.	Monitoring and Reporting	24

E.	Standard and Special Conditions	27

F.	Administrative Process	31

G.	Administrative Record	31

1. Documentation of Effluent Limitations	32

H.	National Topic Areas	36

1.	Nutrients	36

2.	Pesticides	38

3.	Pretreatment	39

4.	Stormwater	46

IV.	REGIONAL TOPIC AREA FINDINGS	49

A. 316(a) - Thermal Discharge	49

State Review Framework Report | Missouri | Page 5


-------
B.	316(b) - Cooling Intake Structures	50

C.	Whole Effluent Toxicity (WET)	50

D.	Missouri Sludge Program	51

E.	Concentrated Animal Feeding Operations	51

V. ACTION ITEMS	56

A.	Basic Facility Information and Permit Application	56

B.	Technology-based Effluent Limitations	56

C.	Water Quality-Based Effluent Limitations	56

D.	Monitoring and Reporting	57

E.	Standard and Special Conditions	57

F.	Administrative Process	57

G.	Documentation	57

H.	National Topic Areas	57

1.	Nutrients	57

2.	Pesticides	57

3.	Pretreatment	57

4.	Stormwater	58

I.	Regional Topic Area	58

1. & 2. 316 (a) Thermal Discharge and 316 (b) Cooling Intake Structure	58

3.	Whole Effluent Toxicity	58

4.	Sludge	58

5.	Concentrated Animal Feeding Operations	58

State Review Framework	60

I.	Background on the Clean Water Act State Review Framework	60

II.	SRF Review Process	61

III.	SRF Findings	62

Appendix A: SRF File Selection	85

Appendix B: MDNR Compliance and Enforcement Program Overview	89

Appendix C: File Review Summaries for the SRF Review	93

Appendix D: MDNR Response Letter	125

State Review Framework Report | Missouri | Page 6


-------
CWA-NPDES Integrated SRF and PQR Review

I. Introduction

The EPA reviews regional and state Clean Water Act (CWA) National Pollutant Discharge
Elimination System (NPDES) permitting and enforcement programs every five years. During
these reviews, the EPA staff review NPDES program implementation and enforcement. A
component of each review is the Permit Quality Review (PQR), which assesses whether a state
adequately implements the requirements of the NPDES program as reflected in the permit and
other supporting documents (e.g., fact sheet, calculations). A second component of these reviews
is the State Review Framework (SRF), which evaluates state enforcement programs.

Through these reviews, the EPA promotes national consistency, identifies successes in the base
NPDES program, and identifies opportunities for improvement in the development and
implementation of NPDES permits and enforcement. The findings of these reviews may be used
by the EPA headquarters to identify areas for training or guidance, and by the EPA region to help
identify and assist states in determining action items to improve their NPDES permitting and/or
enforcement programs.

The EPA conducted an integrated oversight review of the Missouri NPDES permitting and
enforcement and compliance program by combining a PQR and a SRF review on March 11-13,
2014. The PQR is designed to assess how well the State implements the requirements of the
NPDES program as reflected in NPDES permits and other supporting documents. The PQR
reviewed the administrative record for selected NPDES permits (core permits) using a
standardized checklist. Additionally, the PQR looked at four National Topics (areas of national
importance), and Regional Topics (area of Regional importance) listed below:

National Topic Areas

•	nutrients,

•	pesticides,

•	pretreatment, and

•	stormwater

Regional Topic Area

•	316 (a) Thermal Discharge,

•	316 (b) Cooling Intake Structures,

•	WET,

•	Sludge, and

•	CAFOs

The SRF review is designed to ensure a minimum baseline of consistent performance across
states, and that the EPA conducts oversight of state enforcement and compliance programs in a
nationally consistent and efficient manner. The SRF review looked at program elements
covering:

State Review Framework Report | Missouri | Page 7


-------
•	data (completeness, timeliness, and quality),

•	inspections (coverage and quality),

•	identification of violations,

•	enforcement actions (appropriateness and timeliness), and

•	penalties (calculation, assessment, and collection)

These reviews examined data and files generated and kept by the Missouri Department of
Natural Resources.

The reviews were conducted in three phases: analyzing information from the national data
systems, reviewing a set of state files and permits, and the development of findings and
recommendations. Consultation was built into the process to ensure the EPA and the state
understand the causes of issues, and to seek agreement on identifying the actions needed to
address issues. As part of the reviews conducted in 2014 in Missouri, Region 7 reviewed the
State's program authorization documents and the State's Memorandum of Agreement (MO A)
using the final approved Guidance for NPDES MO As between States and the EPA. The EPA is
currently working with the state on developing an updated MOA.

The integrated review examined data and files generated and kept by the Missouri Department of
Natural Resources. This section focuses only on the integrated PQR and CWA SRF NPDES
program findings.

The report is designed to capture the information and agreements developed during the review
process in order to facilitate program improvements. The report is designed to provide factual
information. The EPA also uses the information from the integrated reviews to draw a "national
picture" of the NPDES program, to develop comparable state performance dashboards, and to
identify any issues that require a national response.

II. Coordination Between Permitting and Enforcement

The state of Missouri became fully authorized to perform CWA NPDES functions on December
12, 1985. The Missouri Clean Water Law grants authority to the MDNR to implement the state's
CWA/NPDES permitting, compliance, and enforcement programs. The Division of
Environmental Quality within the MDNR central office in Jefferson City houses the Water
Protection Program, which has a branch responsible for all permitting and formal enforcement
functions. Permitting and enforcement decisions of elevated importance in MDNR must be
approved by the state's Clean Water Commission, which is a seven-member citizen's board
appointed by the governor and confirmed by the Senate.

The MDNR's regional offices, run by the Division of Field Services, conduct compliance
inspections and work with entities to resolve violations voluntarily. Incidents of noncompliance
that cannot be resolved through voluntary or informal enforcement measures are referred to the
Water Protection Program for formal enforcement. The state Attorney General elects to take

State Review Framework Report | Missouri | Page 8


-------
enforcement cases that MDNR is unable to resolve administratively. More information on
MDNR's enforcement escalation policy can be found in Appendix B.

III. Integrated Review Background

The EPA Region 7 permitting and enforcement staff conducted an integrated review during
March 2014. The review consisted of a review of permit, compliance, and enforcement files for
facilities selected by the EPA that MDNR provided electronically. These file reviews took place
in the EPA office in early March 2014 and in MDNR's central office during the week of March
11-13, 2014, at which time the EPA staff also conversed with state staff on the implementation
of their program. To facilitate an integrated review, the EPA staff from the two programs worked
adjacent to one another during the review week, compared notes prior to the exit briefing at the
end of the review week, and collaborated to develop common findings prior to finishing the draft
report.

The CWA SRF reviewed 67 enforcement files. To facilitate the coordination of the PQR and
SRF reviews, and to encourage dialogue between the permitting and enforcement components of
the NPDES Program, several common files were selected for both the PQR and SRF reviews.
The common files/permits reviewed were:

MO-0039659

MO-0134147

MO-0023663

MO-0088072

MO-0119962

MO-GS1

MO-RA

MO-R04

Eureka WWTF
JCSD, Mirasol WWTF
Drexel South WWTF
BRANDCO Investments
Sharpe Holdings

State No-Discharge Concentrated Animal Feeding Operation

Construction or land disturbance

Small Municipal Separate Storm Sewer Systems

Aside from the oversight provided in this integrated review, the EPA Region 7 permitting and
enforcement staff work together closely on an as-needed basis to review draft general permits
from the state as well as other permits for which the Region has noted past concerns with
compliance at the facility. In addition, permitting staff routinely review major and minor permits
as they are placed on public notice. The location of Region 7's permits branch and water
enforcement branch in the same division lends to efficient coordination over such matters.

For detailed information on the background of Missouri's permitting program, see the State
Permitting Program Overview in the PQR part of this report. For detailed information on the
background of Missouri's compliance and enforcement program, see Appendix B.

IV. How Report Findings Are Made

The findings in this report were made by the EPA Region 7's permitting and enforcement staff
after analyzing data in the national data systems and reviewing facility files at the state.

State Review Framework Report | Missouri | Page 9


-------
Permitting and enforcement staff consulted with state staff and each other before determining
findings. Findings cover both positive and negative aspects of the state's performance. Where the
state program was doing particularly well or was meeting all of its requirements, the EPA
identified these areas in the sections below. Where the EPA found the state had opportunities to
improve both permitting and enforcement, the EPA suggested an appropriate course of action.

V. Common Findings

This section describes findings, recommendations, and follow-up activities identified as common
issues for CWA enforcement and permitting. These issues also appear in the PQR and/or SRF
parts of the report, as noted for each item, unless the item does not fit within any PQR areas of
consideration or SRF metrics (e.g. permit enforceability findings and a Pretreatment finding, as
noted).

Pretreatment:

Finding: MDNR must ensure that permits for all cities currently implementing Pretreatment
programs contain language that requires implementation in accordance with the requirements of
40 CFRPart 403. Jefferson City, Moberly, Union, Wentzville, St. Peters, Farmington, and
Sullivan are missing implementation requirements.

Finding: MDNR must ensure that permits for POTWs with pretreatment programs include the
requirement to reevaluate local limits in a timely manner per 40 CFR 122.44(j)(2)(ii).

Concentrated Animal Feeding Operations:

Finding: The MDNR definition of process wastewater must be as stringent as the federal
regulation at 40 CFR 122.23(b)(7). The definition must include water directly and indirectly used
in the operation of a CAFO.

Finding: All uncontaminated stormwater originating outside of the production area footprint
should be diverted to prevent contact with manure, litter, or process wastewater as specified in
CFR 40 §122.42 (e)(iii). Any process wastewater/stormwater that comes in contact with these
materials as specified in 40 CFR 122.23(b)(7) must be collected and disposed of in a manner that
is consistent with the CWA. Authorization of discharges of process wastewater must be pursuant
to a NPDES permit and consistent with the Effluent Limitation Guidelines.

Finding: MDNR is not sufficiently reviewing NOIs to ensure CAFOs applying for the state no-
discharge permit do not discharge to waters of the United States.

Finding: The Wet Weather Management guide (PUB2422) contains practices that minimize
discharges from land application areas during wet weather events. Implementation of the Wet
Weather Management guide at CAFOs without an NPDES will not negate CWA liability. The
references to PUB2422 should either be removed from the state permit or the guide should be
revised based on the no-discharge requirement.

State Review Framework Report | Missouri | Page 10


-------
Inspections at CAFOs operating without an NPDES permit need to effectively evaluate and
clearly document whether the facility discharges and is subject to NPDES permitting
requirements.

State Review Framework Report | Missouri | Page 11


-------
I. PQR BACKGROUND

National Pollutant Discharge Elimination System (NPDES) Permit Quality Reviews (PQRs) are
an evaluation of a select set of NPDES permits to determine whether permits are developed in a
manner consistent with applicable requirements established in the Clean Water Act (CWA) and
NPDES regulations. Through this review mechanism, the EPA promotes national consistency,
and identifies successes in implementation of the NPDES program and identifies opportunities
for improvement in the development of NPDES permits.

The EPA's on-site PQR review team, Sunny Wellesley, Donna Porter, Mark Matthews, and John
Dunn, conducted the on-site review portion of the MDNR NPDES permitting program in
Jefferson City, MO from March 10 to March 13, 2014. Kimberly Hill conducted portions of the
review from Region 7's office in Lenexa, Kansas.

The MDNRs PQR consisted of two components: permit reviews and special focus area reviews.
The permit reviews focused on core permit quality and included a review of the permit
application, permit, fact sheet, and any correspondence, reports or documents that provided the
basis for the development of the permit conditions.

The core permit review involved the evaluation of selected permits and supporting materials
using basic NPDES program criteria. Reviewers completed the core review by examining
selected permits and supporting documentation, assessing these materials using standard PQR
tools, and talking with permit writers regarding the permit development process. The core review
focused on the Central Tenets of the NPDES Permitting Program2 to evaluate the MDNR's
NPDES program. In addition, discussions between the EPA and state staff addressed a range of
topics including program status, the permitting process, responsibilities, organization, and
staffing. Core topic area permit reviews are conducted to evaluate similar issues or types of
permits in all states. The national topics reviewed in the Missouri NPDES program were:
nutrients, pesticide general permit, pretreatment, and stormwater.

Regional topic area reviews target regionally-specific permit types or particular aspects of
permits. The regional topic areas selected by the EPA Region 7 included: 316 (a) Heat discharge,
316 (b) Intake Structure, Sludge Program, Whole Effluent Toxicity (WET), and CAFOs. These
reviews provide important information to Missouri, the EPA Region 7, the EPA HQ and the
public on specific program areas.

II. STATE PROGRAM BACKGROUND

A. Program Structure

The State of Missouri has been authorized by the EPA to administer a program equivalent to the
federal NPDES program. Missouri has termed their permits as State Operating Permits; the
operating permits are issued through the Clean Water Commission and are considered as
effective as federal permits under the NPDES program. The EPA oversees the state permitting
program and provides the national framework for the NPDES Program, including requirements

2 http://www.the EPA.gov/npdes/pubs/tenets.pdf

State Review Framework Report | Missouri | Page 12


-------
for state programs. This program authorization involves permitting, inspection and enforcement
activities, requiring varying interactions between MDNR and their regulated community.

The Missouri Clean Water Commission consists of seven members who are appointed by the
governor. Each commission member represents the general interest of the public and has an
interest in and knowledge of conservation and the effects and control of water pollutants. The
duties of the commission are to issue permits for the construction and operation of wastewater
treatment facilities or other point sources, monitor waters of the state and plan to protect and
improve them; inspect and monitor water contaminant sources; investigate complaints from the
public; adopt regulations; enforce the Clean Water Law and State regulations; and administer
grants to municipalities and political subdivisions for construction of wastewater treatment
facilities.

MDNR's responsibilities also include water quality monitoring and analysis, technical assistance
and education. MDNR also provides financial assistance for construction of wastewater
infrastructure projects at publicly-owned treatment works. The program has helped communities
keep up with infrastructure needs and comply with CWA requirements.

MDNR operates a Central Office located at Lewis and Clark State Building, 1101 Riverside Dr.,
Jefferson City, MO and five Regional field offices with satellite offices within each office. The
Regional offices are located in Springfield, with satellite offices at Lake of the Ozarks and
Newton County; Macon with a satellite office at Kirksville; Popular Bluff, with satellite offices
at Cape Girardeau County, Howell County, Madison County, and Rolla Satellite; Kansas City,
with satellite offices at Northwest Missouri and Truman Lake; St. Louis, with satellite offices at
Franklin County, Jefferson County, and Lincoln County. MDNR's Regional Offices conduct
field inspections, complaint investigation, and provide technical assistance on environmental
issues and emergencies.

MDNR's WPP also conducts water quality monitoring in an effort to track pollution trends and
to educate their citizens on natural resources. Monitoring allows the department to customize
permit limitations based on the unique conditions of the waterbody. Monitoring also provides the
evidence of water quality improvement. Impairments of waterbodies comes from many sources,
addressing them and documenting the restoration of waters to meet water quality standards is a
major goal for the program.

At the time of the review, the MDNRs NPDES program has nineteen permit writers. The
program is split into several sections.

Permits Section Chief - Chris Wieberg

Industrial Unit Chief
(includes CAFO)- Amanda
Sappington

Stormwater Unit Chief-
Carrie Schulte

Domestic Unit Chief- Curt
Gateley

Tony Dohmen

Joshua Ernst

Cameron Eisterhold

Logon Cole

Stacia Bax

Charles Harwood

State Review Framework Report | Missouri | Page 13


-------
Thabit Hamoud

Ruth Wallace

Johnny O'Dell

Greg Caldwell

Chris Miller

Lacey Hirschvogel

Vacant



Emily Twining-Gerdes
Andrew Combs





Angela Falls





Brant Farris

The WPP also has three water quality modelers, four Total Maximum Daily Load (TMDL) staff
members, an engineering section, a financial assistance center, and an antidegradation unit. Each
of these groups are not permit writers but they assists permit writers by providing them vital
information necessary to write a complete and effective permit.

The EPA and MDNR are in the process of revising the existing Memorandum of Agreement
(MOA) between the EPA and state governing the NPDES permit and enforcement programs as
part of the Agency's activities under the October 15, 2009, Clean Water Act Action Plan (CWA
Action Plan), and the Interim Guidance to Strengthen Performance in the NPDES Program (June
22, 2010). EPA Region 7 revised the existing MO A and submitted to MDNR for review. At the
time of the on-site review, there have been on-going discussions regarding the revision of the
MOA.

B. Universe and Permit Issuance

As seen in the tables below (counts are current as of March 2014) MDNRs permitting universe is
comprised of 3,013 site specific Missouri State Operating permits and 3,578 facilities covered
by a set of general permits.

Table 1

Publicly Owned Treatment Works (POTWs)

Permits

Majors (greater than 1 million gallons per day)

122

Non majors (less than 1 million gallons per day)

781

Combined sewer overflows

5

Table 2

Non municipal

Permits

Majors

49

Major industrial stormwater

4

Non major

2,038

CAFO (concentrated animal feeding operations)

21

State Review Framework Report | Missouri | Page 14


-------
Table 3

Stormwater

Permits

Municipal

3

Industrial

198

Construction

2916

Non stormwater general permit

534

CAFO general permit

505

Table 4

General permit categories (MO-R and MO-G)

Small Municipal Separate Storm Sewer Systems	

Oil/Water Separators	

Agrichemical Facilities - SIC 5191	

Swimming Pools Discharges	

Fab. Metal, Light Industrial	

Small Domestic Discharges <50,000 gpd	

Lumber and Wood Primary	

Solid Waste Transfer	

Clay Pits	

Wood Treaters	

Chemical Mfg.	

Hydro Testing Non-Petroleum Related Pipelines and Storage Tanks	

Sand and Gravel Washing	

Heat Pumps	

Fuel Spill Cleanup	

Plastics and Rubber Mfg.	

Abandoned Mine Land Reclamation	

Land App of Food Processing WW	

Limestone Quarries	

Pesticide Applications	

Construction or Land Disturbance	

Land App of Domestic Wastewater	

Land Disturbance by City or County	

Petroleum Storage <250,000 gallons	

Hydrostatic Testing Petroleum Related Oil & Gas Pipelines and Storage Tanks

Land App Pom WW Biosolids <2000	

Motor Freight Transportation	

Airports	

Feedstock Compost Sites	

Yard Waste Compost Sites	

Agricultural, Wood, and Food Product Compost	

State No-Discharge CAFO	

CAFO: Concentrated Animal Feeding Operation	

State Review Framework Report | Missouri | Page 15


-------
Dredging Lakes/River Harbors	

Dredging on the Missouri and Mississippi Rivers

Textile and Apparel/Printing and Publ.	

Zeolite Softeners	

Biodiesel Manufacturing	

Car Wash	

Lumber and Wood (Secondary)	

WTP Settling Basins (MO & MISS)	

Motor Vehicle Salvage	

Fish Farms/Hatcheries

MDNR has a backlog of 196 (6.5 % of universe) individual permits. The backlogged permits are
comprised of 18 major and 178 minor permits. Complex issues such as 316 (a) and (b), TMDLs
with nutrient wasteload allocations, and water treatment plants discharging to the Missouri and
Mississippi River are just some of the reasons for permitting backlog.

When MDNR. receives a permit application, it is first logged in with date received into the
Missouri Clean Water Information System database (MoCWIS). MoCWIS is MDNRs in-house
data management system. It is used to track applications, permits, discharge monitoring reports,
compliance monitoring and enforcement activities. The database is a web enabled user interface
system and submits permit and DMR information to ICIS weekly. If an application is received
with a fee, the check number, amount and date is written on the application and recorded into
MDNR's accounting system known as SAM II. Next the application will be reviewed for
completeness, that all required and necessary information has been included, along with fees (if
necessary). MDNR has developed a completeness checklist for their permit writers to use to help
them identify if the application package is incomplete. Depending upon the issue, a permit writer
may determine that the application is incomplete and return it to the applicant with a letter
explaining the deficiency.

An operating permit includes several parts: 1) Cover page, 2) Certificate Page, 3) Effluent
Limitations, 4) Monitoring and Reporting Requirements, 5) Special Conditions, 6) Standard
Conditions, and 7) Fact Sheet or Statement of Basis. In addition, a water quality review sheet
and/or antidegradation review may also be attached to the permit if one was needed. All
developmental documents produced during the permit application review period are also
considered as an integral part of a permit and will be made part of the facility record. The
purpose of a permit is to document the requirements and to establish standards for a facility that
discharges or otherwise disposes (e.g. irrigates) wastewater. Once a permit has been issued, it is
enforceable by MDNR, the EPA and by private citizens.

The permit writer will prepare a draft permit for public notice. Public notice of a permit notifies
interested parties that a draft permit is pending and then allows at least 30 days for public
comment. Notification of the public notice is sent to the applicant, post office, downstream
landowner, and also placed on MDNR's website. If a permit has a high degree of interest, a
public hearing can be held and a notification for the hearing would be announced 30 days prior
to the event. In the case of an applicant request for a permit modification or a termination request
is denied public notice is not required, rather, the applicant would be notified of the denial in
writing. All relevant comments received in response to the public notice shall be given

State Review Framework Report | Missouri | Page 16


-------
consideration before making final permitting decisions. A written response will be made to
significant comments on the draft permit raised during the public notice comment period.

Permit issuance occurs as soon as possible after the end of the public comment period and after
all appropriate comments have been incorporated into the permit. Permitting staff strive to issue
site-specific operating permits within 180 days and general permits within 60 days of the receipt
of the permit application. An applicant may appeal any condition in the permit within 30 days of
notification of issuance. Appeals are filed with and heard by the Administrative Hearing
Commission. The appeal may be made by the applicant, permittee, or any other person with an
interest that is or may be adversely affected.

C. State-Specific Challenges

MDNR has gone through many structural changes. Management personnel have changed
positions and many of the permit writers have less than one year of experience. In addition to the
restructuring and personnel changes, MDNR has been making several changes to permitting
procedures in an effort to streamline their processes.

Several House Bills (HB) that have passed have proven to be challenging. These HBs have
required MDNR to undergo many new procedures. Listed below are a few of the HBs:

HB 89 stated the following requirements for MDNR:

Affordability Determinations

The act requires the Department of Natural Resources to study and make a determination
regarding the affordability to communities and their residents of permit requirements and other
department decisions related to combined or separate sanitary sewer systems or publicly-owned
treatment works or that no finding is required because the permit contains no new conditions or
requirements that convey a new cost to the facility. The affordability determination must be
made prior to issuing a permit or rendering a decision or else the permit or decision is void and
unenforceable.

The act lists criteria the department must use in developing its procedures for determining
affordability. The criteria include: a community's financial resources; affordability of pollution
control options; an evaluation of the overall costs and environmental benefits of the control
technologies; ways to reduce economic impacts on distressed populations in the community; an
assessment of other community investments relating to environmental improvements; an
assessment of factors in certain federal guidance; and other relevant local community economic
conditions. Affordability determinations must be made in the context of all relevant factors and
indicators, and should not be based on the achievement of one single economic or social factor or
measure.

State Review Framework Report | Missouri | Page 17


-------
Clean Water Permit Fees

Under current law, the authority expired on December 31, 2010 for the Clean Water Commission
to charge fees for construction permits, operating permits, and operator's certifications related to
water pollution control. This act extended the expiration date to September 1, 2013.

The act required the Department of Natural Resources to study the fees and present a plan for the
fees to the General Assembly by December 31, 2012. The department was required to conduct
stakeholder meetings and provide a plan that included timelines for permit issuance, ways to
expedite permits, and recommendations for improved services. MDNR followed through by
creating a Clean Water Fee Stakeholder group. The Stakeholder group worked together and
finalized the required study to the General Assembly by the given deadline.

HB 1074 stated the following requirements for MDNR:

This bill prohibits the Missouri Clean Water Commission from modifying any permit by
increasing or decreasing the volume of any water contaminants or pollutants authorized by the
permit to be discharged from any point source or changing any existing limits within the 12
months immediately before any new construction or operating permit is issued until an
independent and unique study commissioned by the state verifies the environmental and
economic need for the increase or decrease for each stream segment affected. This amendment
has been adopted and currently has a proposed effective date of August 8, 2014.

HB 2256 stated the following requirements for MDNR:

No department or agency of this state shall be required to enforce any regulation promulgated by
any federal agency. No department or agency of this state shall enforce any regulation
promulgated by any federal agency within the borders of this state unless the enforcement of
such regulation is approved by the general assembly.

MDNR has increased the number of stakeholder groups/meetings. This action has provided more
opportunity for the citizens to become involved with MDNR. While these stakeholder meetings
are necessary for MDNR, they are very time consuming and have affected staff by increasing
their workload. Another issue has been the process of obtaining stakeholder consensus. At times
stakeholders have not been able to reach an agreement, and this can result in delaying MDNR
from moving forward on several action items.

D. Current State Initiatives

Previously, MDNR conducted their permitting activities in combination with the Regional
Offices and their Central Office. The Regional Offices were charged with writing general
permits and site specific permits that had a design flow of less than one million gallons per day.
The Central Office wrote all other permits with a design flow of greater than one million gallons
per day. However, during this time period MDNR realized that there were inconsistencies in
permits among the Regional Offices. MDNR, striving for consistency, began to centralize
permitting activities in 2012. Centralization has helped MDNR's permit issuance processes and

State Review Framework Report | Missouri | Page 18


-------
consistency in permits, since drafting and issuing of permits is under one process and review
unit.

The Regional Offices, however, are still responsible for many of the permitting activities. Staff
provides assistance for applicants applying for an electronic land disturbance permit, provide
information to the Central Office permit writers as requested, review general permit applications
and then finalize the permitting action depending upon the application type by terminating,
transferring, modifying, or issuing. Regional staff also review No-Exposure Certification
requests and provide notification of exclusion from permitting with associated no-exposure
number or require an application for a permit based upon the information obtained during a site
visit.

Another useful tool MDNR has developed to help with consistency is the Water Pollution
Control Permits Manual. The permits manual is continuously updated to incorporate new
information and process changes. The Permits Manual is a guidance document for the permitting
staff to help them find basic information and to find other relevant resources. It is intended to
help MDNR staff involved in water pollution control permitting follow the same basic processes
and guidelines when drafting permits. This manual is available on MDNR's website so that all
interested parties would be able to understand MDNR's permitting process.

In conjunction with centralization, MNDR moved toward a Watershed based management
system. This system was a phased approach that included: partnership building, assessing and
documenting concerns, setting watershed goals, identifying solutions, and developing an
implementation plan for completing activities. Watershed based management provided the basis
for coordinating water activities over a five year time frame. Its goals are to coordinate an
approach to evaluate each watershed at a defined scale and set up a statewide schedule to rotate
watersheds and NPDES permits on a five year phased approach. This process created permit
synchronization, in which all permits within a watershed would be moved through the Watershed
based management cycle together and would expire in the same fiscal year. With this approach,
some permits will be issued for less than the full five years in order to achieve synchronization.

MDNR has developed a web-enabled electronic system for wastewater facilities to streamline the
management of discharge monitoring reports (DMRs), otherwise called eDMRs. The eDMR
system provides wastewater treatment facilities with an alternative way to submit DMR data and
allows the department to electronically validate the data, acknowledge receipt, and upload data to
Missouri's Clean Water Information System (MoCWIS) database. Creation of this system has
saved facilities money by decreasing compliance costs, reduced resources spent on paper DMRs,
and improved the accuracy of compliance data.

ePermitting is another new program that has been implemented. ePermitting is an on-line system
for which the applicant is able to obtain a general land disturbance permit on the same day.
Whereas prior to ePermitting, a land disturbance permit involved a paper application, several
permit's staff and took several days to issue the permit. This new system has greatly reduced the
manpower spent since general land disturbance permits make up approximately 44% of all clean
water permits.

State Review Framework Report | Missouri | Page 19


-------
MDNR has also increased their involvement with stakeholders on a variety of clean water topics.
These stakeholders are members of the public and any other interested parties wanting/willing to
participate in discussions to come up with goals and solutions for any given topic. WPP hosts a
series of formal meetings that include open discussions between the stakeholders and WPP staff.
These meetings are streamed live over the Internet and open to the public to attend. In addition to
these major formal meetings, WPP holds several smaller, ad hoc groups to discuss sector-
specific interests in which stakeholders help to provide a variety of suggestions. Stakeholder
input has created collaboration and understanding, not only between them and MDNR but also
between the stakeholder members. MDNR does well to update their web page for these
meetings. They post agendas, presentations, and handouts from the stakeholder meetings. Listed
below are the different meeting types:

» 303(d) Public Hearing
» Clean Water Commission
» Clean Water Fee Stakeholders

»	Nutrient Reduction Strategy

»	On-Site Wastewater Stakeholders

»	Water Classification Workgroup

»	Water Permit Fee Stakeholders

»	Water Protection Forum

Additional initiatives that MDNR has made include: 1) revisions related to short-term E. coli
limits and E. coli monitoring frequency; 2) revision of the bypass language to match the federal
definition; 3) specifying that operating permits may include schedules of compliance in
accordance with federal regulations; 4) language that details the different authorities for placing
limits in permits; 5) language that clarifies the reasons for including whole effluent toxicity
testing requirements and nitrate limits in certain permits; 6) a requirement for quarterly effluent
monitoring for nutrients at large wastewater treatment plants; and 7) language that would allow
for reduced effluent monitoring frequencies at facilities that routinely meet limits and do no not
have high variability.

III. CORE REVIEW FINDINGS

A. Basic Facility Information and Permit Application

1.	Facility Information

Basic facility information is necessary to properly establish permit conditions. For example,
information regarding facility type, location, processes and other factors is required by NPDES
permit application regulations (40 CFR 122.21). This information is essential for developing
technically sound, complete, clear and enforceable permits. Similarly, 40 CFR 124.8(b)(1)
specifies that fact sheets must include a description of the type of facility or activity subject to a
draft permit.

2.	Permit Application Requirements

Federal regulations at 40 CFR122.21 and 122.22 specify application requirements for permittees
seeking NPDES permits. Although federal forms are available, authorized states are also
permitted to use their own forms provided they include all information required by the federal
regulations. This portion of the review assesses whether appropriate, complete, and timely

State Review Framework Report | Missouri | Page 20


-------
application information was received by the state and used in permit development. MDNR uses
its own application forms, but they are based on the EPA's forms. However for No exposure
certifications MDNR utilizes the EPA's form.

Once an application is received by MDNR, it is checked to see if a permit fee is required. If all
fees are up to date, the application is forwarded to the operating permits section where it is
assigned a folder tracking number and then forwarded to the appropriate unit chief. The unit
chief assigns the application to a permit writer for review. The application is then reviewed for
completeness and a letter or email is drafted to the permittee notifying them that the permit has
been assigned and indicating any incomplete information that is required for further processing.

MDNR also sends out renewal reminder letters about 7-8 months prior to expiration for site
specific permits and 60 days prior to the expiration of general permits.

The applications reviewed during this PQR provided the required basic facility information;
however Federal Rules require that permit applications for major POTWs include three priority
pollutant scans (40 CFR 122.21(j)(4) and 40 CFR 122.21 appendix J). MDNR is only requiring
one scan from major POTWs.

B. Technology-based Effluent Limitations

NPDES regulations at 40 CFR 125.3(a) require that permitting authorities develop technology-
based requirements where applicable. Permits, fact sheets and other supporting documentation
for POTWs and non-POTWs were reviewed to assess whether technology based effluent
limitations (TBELs) were the appropriate level of control for the permitted facilities.

MDNR utilizes the EPA's established daily and monthly limits for certain industries based on the
production of the facility, or, more commonly, a simple concentration based limit. Both daily and
monthly limits must be included in the permit. MDNR recommends that their permittees target
the design of its treatment system to meet the long-term average monthly rather than the daily
limits, since the daily limit is intended to account for variation in effluent concentration above
the monthly limit. TBELs are found in MDNR's regulations at 10 CSR 20-7.015 which contains
technology based limits for BOD, TSS and pH for domestic waste discharges.

1.	TBELs for POTWs

POTWs must meet secondary or equivalent to secondary standards (including limits for BOD,
TSS, pH, and percent pollutant removal), and must contain numeric limits for all of these
parameters (or authorized alternatives) in accordance with the secondary treatment regulations at
40 CFR Part 133. POTWs are routinely reviewed as they are put on public notice. These reviews
indicate that Missouri is appropriately establishing technology-based permit limits for POTWs:
all permits reviewed contained all parameters required by 40 CFR Part 133, based on the
secondary treatment process, and limits were set using correct units of measure.

2.	TBELs for Non-POTW Dischargers

Permits issued to non-POTWs must require compliance with a level of treatment performance
equivalent to Best Available Technology Economically Achievable (BAT) or Best Conventional
Pollutant Control Technology (BCT) for existing sources, and consistent with New Source
Performance Standards (NSPS) for new sources. Where federal effluent limitations guidelines

State Review Framework Report | Missouri | Page 21


-------
(ELGs) have been developed for a category of dischargers, the TBELs in a permit must be based
on the application of these guidelines. If ELGs are not available, a permit must include
requirements at least as stringent as BAT/BCT developed on a case-by-case basis using best
professional judgment (BPJ) in accordance with the criteria outlined at 40 CFR 125.3(d).

Region 7 routinely reviews industrial permits. In the Permit Rationales permit writers identify
applicable ELGs and document the calculation of permit limits. Missouri utilizes 10 CSR 20-
7.015 with the development of TBELs. The state rule essentially mirrors federal requirements for
TBELs. MDNR establishes what the pollutant of concern would be in regard to the discharge.
Permits reviewed, such as BASF permit, show that state permit writers work to assess the proper
SIC codes and applicable effluent guidelines. Fact sheets then show how the guidelines are
applied to calculate TBELs. Where there is no effluent guideline, permit writers follow 40 CFR
125.3(d) which tells the permit writer to apply the six factors associated with setting BPJ-based
TBELS.

C. Water Quality-Based Effluent Limitations

The NPDES regulations at 40 CFR 122.44(d) require permits to include any requirements in
addition to or more stringent than technology-based requirements where necessary to achieve
state water quality standards, including narrative criteria for water quality. To establish such
"water quality-based effluent limits" (WQBELs), the permitting authority must evaluate the
proposed discharge and determine whether technology-based requirements are sufficiently
stringent, and whether any pollutants or pollutant parameters could cause or contribute to an
excursion above any applicable water quality standard.

The PQR for MDNR assessed the processes employed by permit writers and water quality
modelers to implement these requirements. Specifically, the PQR reviewed permits, fact sheets,
and other documents in the administrative record to evaluate how permit writers and water
quality modelers:

•	determined the appropriate water quality standards applicable to receiving waters;

•	evaluated and characterized the effluent and receiving water including identifying
pollutants of concern;

•	determined critical conditions;

•	incorporated information on ambient pollutant concentrations;

•	assessed any dilution considerations;

•	determined whether limits were necessary for pollutants of concern and, where
necessary;

•	calculated such limits or other permit conditions.

For impaired waters, the PQR also assessed whether and how permit writers consulted and
developed limits consistent with the assumptions of applicable the EPA-approved total
maximum daily loads (TMDLs).

MDNR calculates water quality-based effluent limitations using the procedures found in the
Technical Support Document for Water Quality-Based Toxics Control (TSD) [EPA/505/2-90-
00]. If the water body has designated uses to protect human health such as drinking

State Review Framework Report | Missouri | Page 22


-------
water supply (DWS), human health fish consumption, groundwater protection, or irrigation, and
in comparison to the aquatic life criteria for that pollutant of concern, the most stringent criteria
is the human health criteria; water quality-based effluent limit must be based upon the more
stringent criteria.

To establish reasonable potential to exceed applicable water quality criteria, MDNR uses the
following procedures for a pollutant of concern.

1)	Discharge Monitoring Report (DMR) data for the pollutants of concern must be obtained
in electronic format from DMRs reported by the permittee. Typically, five years of data is
used, if available.

2)	Review current permit for revisions during the course of the permit cycle.

3)	Check data for representativeness and outliers.

4)	Check the method detect limit or minimum level for parameter at: http://www.nemi.gov/.

5)	Assign approach for non-detection or values at the minimum level.

a. Hardness data is a consideration for hardness-dependent metals and should be the
lower 25percentile [10 CSR 20-7.031(1)(Y)].

6)	Once outliers are determined, DMR data should be copied to a new or existing Microsoft
Excel spreadsheet and the following calculations performed on the data:

a.	Number of samples in the data set - Count;

b.	Maximum data point - Max;

c.	Minimum data point - Min;

d.	Mean data point - Average;

e.	Standard Deviation of the data set - StDev;

f.	Coefficient of variation (CV) - Stdev/Mean.

7)	Characterize the highest measured effluent concentration based on the 99th percentile
confidence level. The value of _n is the percentile represented by the highest
concentration in the dataset that has 'n' number of samples.

8)	Determine the relationship between the percentile represented by the highest
concentration in the dataset and the 99th percentile upper bound of the lognormal effluent
distribution (C99/C11). Where CV is the coefficient of variation determined from the data
set and 'z' is the normal distribution value for the _n percentile (Note: If n<10, the
coefficient of variation (CV) is estimated to equal 0.6, TSD on Page 50, Box 3-2): Note:

Z99 = 2.326

9)	Calculate the z-score, which is the distance from the sample mean to the population mean
in units of the standard error or use the table at:
http://en.wikipedia.org/wiki/Standard normal table

10)	To obtain a maximum effluent concentration based on the distribution and variability of
effluent data, the relationship determined in Step 8 is multiplied by the maximum value
determined in Step 6.

11)	The maximum effluent concentration and appropriate available dilution are used to
project a maximum receiving water concentration (RWC) using the mass balance
approach.

12)	Compare the projected maximum RWC with applicable criteria (acute (CMC), chronic
(CCC), or reference ambient concentration (RAC)). RAC is the concentration of a
chemical in water that will not cause adverse impacts to human health. If the maximum
RWC is greater than the applicable ambient criterion, there is reasonable potential to

State Review Framework Report | Missouri | Page 23


-------
cause an exceedance of the criterion (More recent permits have a minimally-degrading
effluent limit (MDEL) that maintains the assimilative capacity less than 10% for Tier 2
pollutants. For these POCs, the RWC is compared to the maximum daily limit for that
POC'sMDEL).

13) The results of the comparison between RWC and applicable criteria will require the
reviewer to decide between removal or application of a limit, reduction to monitoring
only, or depending on the results of the last RPA, discontinuing monitoring only.

It is noted that some of the permit application data provided was not being applied when
calculating Reasonable Potential as was found in the review of the Carthage and Platte City
permits.

The EPA on September 18, 2013, commented on MDNR's June 17, 2013, proposed revisions to
their effluent regulations (10 CSR 20-7.015) and water quality standards (10 CSR 20-7.031). The
EPA supported many of the revisions; however, recommended some modified provisions in
order to clarify MNDR's intentions.

D. Monitoring and Reporting

NPDES regulations at 40 CFR 122.41(j) require permittees to periodically evaluate compliance
with the effluent limitations established in their permits and provide the results to the permitting
authority. Monitoring and reporting conditions require the permittee to conduct routine or
episodic self-monitoring of permitted discharges and where applicable, internal processes, and
report the analytical results to the permitting authority with information necessary to evaluate
discharge characteristics and compliance status.

Specifically, 40 CFR 122.44(i) requires NPDES permits to establish, at minimum, annual
monitoring for all limited parameters sufficient to assure compliance with permit limitations,
including specific requirements for the types of information to be provided and the methods for
the collection and analysis of such samples. In addition, 40 CFR 122.48 requires that permits
specify the type, intervals, and frequency of monitoring sufficient to yield data which are
representative of the monitored activity. The regulations at 40 CFR 122.44(i) also require
reporting of monitoring results with a frequency dependent on the nature and effect of the
discharge. All of the permits reviewed included a description and appropriate level of
monitoring.

According to MDNR, for pollutants with an effluent limitation they gather sufficient data to
establish a record of performance for the facility to ensure that they are in compliance. For
pollutants without effluent limits the goal is collecting enough data to determine reasonable
potential. In both of these cases, the minimum monitoring frequency is quarterly. Monitoring for
pollutants without effluent limits is most often required when the permit writer has reason to
believe the pollutant may exist in the effluent, but does not have enough information to
determine if reasonable potential exists. Monitoring is also required in situations where no
reasonable potential exists, but the pollutant still exists in the waste stream and MDNR seeks to
verify the continued efficacy of pollution controls (normally for those with pretreatment
programs, and for ammonia treatment at the WWTF).

State Review Framework Report | Missouri | Page 24


-------
The frequency of monitoring will depend on the design flow of the facility. Guidelines for
monitoring frequency for processed wastewater outfalls are as follows:

Design Flow

Frequency

Less than 25,000 gallons/day

Once/year

25,000-1,000,000 gallons/day

Once/year for each 50,000 gal/day or fraction
thereof

Greater than 1,000,000 gallons/day (1
mgd)

A minimum of 20 samples/year unless applicant
can show that wastewater has a consistent
quality.

MDNR has set the sampling frequency to be spread out evenly throughout the discharge year.
This means that a point source with continuous discharge will take samples on a regular
schedule, and point sources with seasonal discharge will sample during their operating seasons.
The monitoring frequency and sample types stated above are minimum requirements. The permit
writer establishes monitoring frequencies and sampling types to fulfill the site specific
informational needs.

Discharges from stormwater outfalls are often unknown. And so it depends on the amount and
timing of precipitation, the size of the drainage area above the outfall, topography, vegetative
cover, and amount of impervious surface within the drainage area. For major facilities (e.g. those
with design capacities of more than 1 million gallons per day of processed wastewater) and for
construction sites, a sample for each precipitation event that produces runoff may be required.
For smaller facilities, samples taken once a month or once a quarter may be sufficient.

The frequency of In-Stream monitoring depends on the size of the facility. The size of the
receiving stream is also taken into account. As a guideline, MDNR sets the following in-stream
monitoring frequencies based on facility size and receiving stream characteristics. However,
there are times when it is not possible to establish an upstream monitoring point for facilities that
are located in headwater areas of streams where there may be no flow.

MDNR has several types of reporting and record keeping requirements for permits including the
documentation of:

1)	the characteristics of discharges;

2)	facility operations and management of residuals (e.g. sludge); and;

3)	facility or site status and changes of that status. These reporting and record keeping
requirements are based on state and federal regulatory provisions.

Minimum effluent sampling and reporting requirements are outlined throughout MDNR's
regulations located in 10 CSR 20-7.015 and vary based upon the receiving water, design flow,
type of treatment and, in some cases, on enforcement action. The provisions of Missouri's
Effluent Regulations provide guidance for the development of relatively standardized schedules
of monitoring and subsequent reporting and also allow permit writer discretion. Facilities also
may be required to sample and report the characteristics of stormwater and other periodic
discharges. Monitoring should be based on the potential water quality effect and volume of the

State Review Framework Report | Missouri | Page 25


-------
discharge. The permit writer determines sampling and reporting frequency for the monitoring of
discharges related to precipitation events or irregular wastewater releases.

Standard report forms have been developed for the various types of discharges from facilities.
These include the:

•	Monthly Monitoring Report for larger, publicly owned, domestic wastewater treatment
facilities;

•	NPDES Monitoring Report for non-municipal domestic wastewater discharges; and

•	Whole effluent toxicity testing for compliance biomonitoring.

In addition, MDNR is able to develop a site-specific monitoring report on behalf of the permittee
or the permittee can develop a site-specific monitoring report and obtain approval from the
department to use the form as their official form. Industrial facilities can utilize or modify a
domestic wastewater monitoring report, or report information about their discharges on a self-
developed form approved by MDNR. Permittees are also required to report information related
to facility operations and the management of residuals, including the land application or other
disposal of wastewater and sludge (biosolids). These requirements are also based on provisions
of the Permit and Effluent Regulations and Water Quality Standards. Most of these provisions
are also reflected in the Standard and Special Conditions for NPDES Permits.

The monthly monitoring report form for larger POTWs requires submission of operational
control parameters. Less detailed operational information for non-municipal wastewater facilities
must be reported on an annual basis. No-discharge permit facilities must report, at a minimum,
about the amounts of wastewater that is land applied, storage lagoon characteristics, weather
conditions in particular precipitation amounts, sludge disposal practices, and information about
the soils and crops grown at irrigation sites. The various sections of Forms S, SC and SD require
detailed information about most aspects of domestic and industrial sludge (biosolids)
management and disposal.

Facilities are required to report to MDNR information about:

•	Changes in which officials of an organization can submit applications and reports to the
department;

•	Local planning and zoning agency notifications about construction permit projects;

•	Planned physical alterations of the facility;

•	Anticipated noncompliance;

•	Transfers of the permit to another person or organization;

•	Conformance with compliance schedule milestones;

•	Noncompliance that endangers human health or the environment within 24 hours of the
event;

•	Noncompliance related to unanticipated bypasses and plant upsets within 24 hours of the
event;

•	Violations of maximum daily effluent limits for selected pollutants within 24 hours of the
event if listed in the permit;

•	All other noncompliance at the time the regular discharge monitoring report is filed; and

State Review Framework Report | Missouri | Page 26


-------
• If a POTW will receive any new introduction of pollutants or substantial change in
nondomestic pollutants already being received at the facility.

MDNRs regulatory provisions related to these reporting requirements are located in 10 CSR 20-
6.010(2)(D), (4)(I), (7)(C), (8)(A)5, 6 and 9. These state regulatory provisions are derived from
various federal regulations, including 40 CFR 122.41(1), 122.44(g) and 122.48.

E. Standard and Special Conditions

Federal regulations at 40 CFR 122.41 require that all NPDES permits, including NPDES general
permits, contain an enumerated list of "standard" permit conditions. Further, the regulations at 40
CFR 122.42 require that NPDES permits for certain categories of dischargers must contain
additional standard conditions. Permitting authorities must include these conditions in NPDES
permits and may not alter or omit any standard condition, unless such alteration or omission
results in a requirement more stringent than required by the federal regulations. All of the
permits and fact sheets reviewed appropriately used and described the Standard and Special
Conditions.

In addition to standard permit conditions, permits may also contain additional requirements that
are unique to a particular permittee or discharger. These case-specific requirements are generally
referred to as "special conditions." Special conditions might include requirements such as:
additional monitoring or special studies such as pollutant management plan or a mercury
minimization plan; best management practices [see 40 CFR 122.44(k)], or permit compliance
schedules [see 40 CFR 122.47], Where a permit contains special conditions, such conditions
must be consistent with applicable regulations.

MDNR utilizes Federal regulations 40 CFR 122.41 as the basis for their Missouri Standard
Conditions for NPDES Permits. They have three sets of Standard Conditions. Part I is a set of
"General Conditions" and is included in all permits: this is equivalent to the standard conditions
set out in 40 CFR 122.41. The Part II are the Special Conditions for Publically Owned Treatment
Works (POTW) with Major Contributing Industries. Part III is for Sludge and Biosolids from
Domestic Wastewater Treatment Facilities.

Standard Conditions for NPDES Permits (Part I, Section A) discuss the conditions for Sampling,
Monitoring and Recording. Discharge Monitoring Reports can be required on a monthly,
quarterly, or annual basis and operating permits can require several monitoring and reporting
frequencies within a single operating permit. Reporting due dates are based upon the issuance
date of the permit. The NPDES Standard Conditions also specify the record keeping (records
retention) requirements for permittees. Records related to effluent quality, facility status,
compliance schedule information, notifications of noncompliance and bypassing should be
retained by the facility for a minimum of three years (Standard Conditions, Part I-Section A-5.).
Records related to sludge (biosolids) management must be retained for a period of five years
(See Standard Conditions, Part I-Section A-5.). NPDES Standard Conditions require permittees
to keep facility records on-site or at another designated location so that they can be made
available upon inspection.

During the 2010 PQR, the EPA found that there were omissions of federal standard conditions
that needed to be in the General Conditions. Listed below are the items that were noted:

State Review Framework Report | Missouri | Page 27


-------
•	The Bypass provisions are less stringent than the federal regulations. There is no "duty to
comply" provision.

•	There is no "duty to mitigate" provision.

•	There is no "need to halt or reduce activity not a defense" provision.

On November 1, 2013, MDNR revised their Standard Conditions Part I to match Federal
definitions for the above stated provisions.

MDNR's Special conditions in permits are designed to provide an additional measure of control
for the reduction of discharges of pollutants to waters of the state. Some reasons to use special
conditions in a permit include the following:

1)	To incorporate preventative requirements such as Best Management Practices (BMP);

2)	To address possible changes to processes or raw materials that may affect effluent
characteristics;

3)	To incorporate compliance schedules to provide the time necessary to comply with
permit conditions;

4)	To incorporate other requirements such as pretreatment or sludge disposal;

5)	To impose requirements to conduct special studies such as ambient stream sediment
studies, mixing or mixing zone studies, pollutant reduction evaluations, etc.

The group of seven basic special conditions (which MDNR refers to as the "Simple Seven") is
typically used in permits for publicly owned treatment works (POTWs) and private domestic
wastewater treatment plants. The seven special conditions address:

1.	Reopening and modifying the permit to incorporate new effluent limitations to reflect
results of waste load allocations, toxicity studies, 303(d) studies and TMDLs;

2.	Marking outfalls in the field;

3.	Connection to area-wide treatment systems;

4.	Changes in discharge of toxic substances;

5.	Reporting as no-discharge when this occurs;

6.	Fully complying with the Water Quality Standards, including the General Criteria; and

7.	Sludge and biosolids use for domestic wastewater facilities.

Special studies and additional monitoring requirements that may be included under the Special
Conditions of a permit are generally used to supplement numeric effluent limits or support future
permit development activities. Examples of types of special studies include:

1)	Treatability studies, when treatability information is lacking for a pollutant or pollutants
that would prohibit a permit writer from developing defensible technology-based limits.
Treatability studies can also be required when the permit writer is not completely
confident that a facility is able to comply with an effluent limit.

2)	Toxicity identification evaluation/Toxicity reduction evaluation (TIE/TRE), required for
facilities for which wastewater discharges are found to be toxic as a result of whole
effluent toxicity (WET) test. The purpose of these evaluations is to identify and control
the sources of toxicity in an effluent.

State Review Framework Report | Missouri | Page 28


-------
3)	Mixing or mixing zone studies are used to assist in determining the allowable ambient
mixing that can be applied when developing water quality based effluent limits.

4)	Sediment monitoring may be used if the permit writer suspects that pollutants contained
in wastewater discharges accumulate in the sediments of the receiving water.

5)	Bioconcentration studies are used to determine whether pollutants contained in
wastewater discharges bioaccumulate in aquatic organisms. These types of studies are
usually recommended when water quality based effluent limits for pollutants that
bioaccumulate are established below analytical detection levels. When establishing
special conditions, the permit writer must ensure that any particular requirements related
to the study (e.g., sampling or analytical procedures) are specified in the permit
condition. In addition, the permit writer must establish a reasonable schedule for
completion and submission of the study or monitoring program. If the anticipated
schedule is longer than 6 months to 1 year, then it is recommended that the permit writer
require that the facility provide an interim progress report.

In accord with 40 CFR 122.2 Definitions, BMPs include schedules of activities, prohibitions of
practices, maintenance procedures, and other management practices to prevent or reduce the
pollution of waters of the United States and the State. BMPs also include treatment requirements,
operating procedures, and practices to control plant site runoff, spillage or leaks, sludge or waste
disposal, or drainage from raw material storage. BMPs are measures to prevent or mitigate water
pollution for sources associated with agricultural, municipal, commercial and industrial
processes and wastewater treatment. BMPs also apply to stormwater sources and permits and
land disturbance activities.

MDNR includes Best Management Practices as special conditions when:

1)	Numeric limitations are infeasible;

2)	Chemical analyses are inappropriate or impossible;

3)	A history of leaks and spills exist or housekeeping is sloppy;

4)	A complex facility lacks toxic pollutant data; and

5)	Other discharge control options are prohibitively expensive.

The permit writer may use a special condition that requires the permittee to develop, implement,
and reevaluate its own BMP for the facility. To select a specific BMP, the permit writer must:

1)	Determine the processes that apply;

2)	Evaluate whether the BMP would help to achieve the environmental objectives; and

3)	Use examples from other permits, pollution prevention sources, or the EPA guidance
documents.

BMP plans can be submitted for review by the regulatory agency but are usually kept on-site and
made available upon request. If a BMP is required, it should be completed within six months and
implemented within twelve months of permit issuance.

Pollution prevention has been shown to reduce costs as well as pollution risks through source
reduction and recycling techniques. The Pollution Prevention Act of 1990 established a national
policy for a hierarchy of waste management:

1) Pollution should be prevented or reduced at the source, whenever feasible;

State Review Framework Report | Missouri | Page 29


-------
2)	Pollution that cannot be prevented should be recycled in an environmentally safe manner,
whenever feasible;

3)	Pollution that cannot be prevented or recycled should be treated in an environmentally
safe manner; and

4)	Disposal or other release into the environment should be employed only as a last resort
and should be conducted in an environmentally safe manner.

These should be viewed as establishing a set of preferences, rather than a requirement. But the
waste management hierarchy as national policy implies that openness to and consideration of
pollution prevention practices should be routine in permitting.

The Pollution Prevention Act emphasizes that pollution prevention means source reduction and
defines source reduction as any practice that:

1)	Reduces the amount of any hazardous substance, pollutant, or contaminant entering any
waste stream or otherwise released into the environment prior to recycling, treatment, or
disposal;

2)	Reduces the threats to public health and the environment associated with the release of
hazardous substances, pollutants, or contaminants; and

3)	Increases the efficiency of using raw materials, energy, water, or other resources, or
protects natural resources by conservation.

Pollution prevention includes the Best Management Practices (BMPs) which have traditionally
focused on good housekeeping measures and good management techniques that attempt to avoid
contact between pollutants and water as a result of leaks, spills and improper waste disposal.

However, BMPs may include production modifications, operational changes, material
substitutions, material and water conservation, toxics use reduction, internal or external reuse of
wastes and other such measures. Pollution prevention practices are frequently described through
examples that primarily relate to industrial settings. However, source reduction is also applicable
in agricultural operations, domestic wastewater treatment, drinking water treatment, stormwater
control programs, land disturbance and other activities.

MNDR permit writers may include schedules of compliance to allow permittees additional time
to achieve compliance. Schedules must require compliance as soon as possible, but may not
extend the date for final compliance beyond compliance dates established by federal or state law
or regulation. If the schedule exceeds one year from date of permit issuance, the schedule shall
set interim dates for requirements or progress reports.

Examples of situations where compliance schedules may be appropriate include:

1)	Pretreatment program development;

2)	New or revised effluent regulations;

3)	New or revised water quality standards;

4)	Best Management Practices (BMP) development and implementation; and

5)	Stormwater, CSO and/or SSO control program development and/or implementation.

State Review Framework Report | Missouri | Page 30


-------
In situations where the permittee will be unable to meet permit conditions, and where a
compliance schedule is not allowed, the facility should be referred to the WPP's Enforcement
Section for appropriate action.

F.	Administrative Process

The administrative process includes documenting the basis of all permit decisions (40 CFR 124.5
and 40 CFR 124.6); coordinating the EPA and state review of the draft (or proposed) permit (40
CFR 123.44); providing public notice (40 CFR 124.10); conducting hearings if appropriate (40
CFR 124.11 and 40 CFR 124.12); responding to public comments (40 CFR 124.17); and,
modifying a permit (if necessary) after issuance (40 CFR 124.5). MDNRs permitting procedures
include all of these required components. Draft permits along with their corresponding factsheets
and/or statement of basis are placed on the internet for the public to view and make comments.
Additional information regarding administrative processes can be found under the section
Universe and Permit Issuance. All of the permits reviewed appropriately followed the
administrative process regarding public notice of the permit and considering public comments
received during the public comment period.

MDNR's permit writer will check to make sure all required signatures are on the transmittal
sheet and then will enter the following data into MoCWIS:

a.	Effective date

b.	Issuance date

c.	Expiration date

Next the permit writer will review the permit details in MOCWIS, enter the dates into the
customized DMRs and I/I reports, and then issue permit in MOCWIS. The permit writer will
generate permit cover letters from Reports in MOCWIS, then merge the final permit with a copy
of the application and save for weekly issuance to their website.

G.	Administrative Record

The administrative record is the foundation that supports the NPDES permit. If the EPA issues
the permit, 40 CFR 124.9 identifies the required content of the administrative record for a draft
permit and 40 CFR 124.18 identifies the requirements for a final permit. Authorized state
programs should have equivalent documentation. The record should contain the necessary
documentation to justify permit conditions. At a minimum, the administrative record for a permit
should contain the permit application and supporting data; draft permit; fact sheet or statement of
basis; all items cited in the statement of basis or fact sheet including calculations used to derive
the permit limitations; meeting reports; correspondence between the applicant and regulatory
personnel; all other items supporting the file; final response to comments; and, for new sources
where the EPA issues the permit, any environmental assessment, environmental impact
statement, or finding of no significant impact.

Current regulations require that fact sheets include information regarding the type of facility or
activity permitted, the type and quantity of pollutants discharged, the technical, statutory, and
regulatory basis for permit conditions, the basis and calculations for effluent limits and
conditions, the reasons for application of certain specific limits, rationales for variances or

State Review Framework Report | Missouri | Page 31


-------
alternatives, contact information, and procedures for issuing the final permit. Generally, the
administrative record includes the permit application, the draft permit, any fact sheet or
statement of basis, documents cited in the fact sheet or statement of basis, and other documents
contained in the supporting file for the permit. The permits review included a review of the
permits file and permitting supporting documents making up the administrative record. A review
of these records indicated the state followed all of the administrative procedures as required and
described in this report.

MDNRs fact sheets are very complete and provide a great deal of information. The format of the
fact sheet helps permit writers build a good permit and creates a transparent record for the
permittee and the public. The MDNR fact sheet is a checklist/template used by permit writers in
both documenting permit derivation and as a tool to help write the permit. Fact sheets include:

•	Location information including Lat/Long and UTM data

•	Complete receiving stream information with designated uses identified

•	Calculations for TBELs and WQBEL are shown for each parameter in the permit

1. Documentation of Effluent Limitations

Permit records for POTWs and industrial facilities should contain comprehensive documentation
of the development of all effluent limitations. Technology-based effluent limits should include
assessment of applicable standards, data used in developing effluent limitations, and actual
calculations used to develop effluent limitations. The procedures implemented for determining
the need for water quality-based effluent limitations as well as the procedures explaining the
basis for establishing, or for not establishing, water quality-based effluent limitations should be
clear and straight forward. The permit writer should adequately document changes from the
previous permit, ensure draft and final limitations match (unless the basis for a change is
documented), and include all supporting documentation in the permit file.

MDNR permits, provide the documentation required by regulation. Facility descriptions are
usually complete and clearly written. The permit records contain facility location, maps of
facilities and receiving streams, and flow maps for industrial facilities. Receiving streams are
listed and applicable levels of protection are described in the permit rationale.

Permit writers make the assessment of applicable SIC Code and determine if an Effluent
Limitation Guideline applies. The permit writer creates a list of pollutants of concern, and the
Waste Load Allocations (WLAs) are calculated by Water Quality specialists. The WLA
procedures are highly regimented and the approaches are established in rule referenced
procedures. The permit writer then develops the permit using the Technology-based Effluent
Limits (TBEL) and Water Quality-based Effluent Limits (WQBEL) calculations. Fact sheets
detail the limited parameters with a pollutant by pollutant discussion of the rationale for the limit
(or monitoring requirement). Fact sheets contain a description of any changes in limits as permits
are renewed with a reason for the new limit.

Permit limits for POTWs and industrial facilities are calculated in units consistent with the
applicable effluent guidelines. Permit limits are stated in term of mass and concentration for all
parameters (except pH and temperature).

During the PQR the following was found with regard to permit documentation. Listed below are
some of the individual permit that were reviewed and that have been selected as examples:

State Review Framework Report | Missouri | Page 32


-------
Trov. MO - MQ-0054623

The "old" Troy WWTP is a pair of package plants operated in parallel. A new plant is being
constructed to accommodate the growth of the city. The facility has had a history of non-
compliance and has problems with Inflow and Infiltration (I&I), overflows, violations of metal
and ammonia limits, and washout of sludge into the receiving stream. The facility was in
compliance with WET limits set in the permit.

MDNR sent out three letters asking for a complete application (3/26/10, 4/4/10, and 7/2/10). The
letters indicated that the application was missing maps, a process flow diagram, legal
certifications, and Expanded Effluent Testing Data (monitoring of the EPA Priority Pollutants).
MDNR did get a complete application albeit with only one Priority Pollutant scan. A part of the
problem was the move of operation of the facility from a contract operator back to the City of
Troy.

The permit removed a Zn limit without a discussion of allowable backsliding. There was a
rationale for the removal, but it was not documented in the fact sheet. Limits for Cu and Pb were
kept in the permit. The record was clear that a sole industrial user, Bodine Aluminum, had
switched discharge to the new Troy WWTP, and that the DMRs showed no reasonable potential.
It is notable that Troy's consultant commented that all the metals limits should be removed, or if
retained, they should be allowed a compliance schedule. MDNR denied both requests.

The Troy permit contains WQBEL for BOD, TSS, TRC, E. coli, and several metals. Calculations
for each are described in the fact sheet. Acute WET limits are included in the permit. The "002"
outfall has been eliminated from the permit. General criteria and narrative "free from" criteria
are listed in the special conditions of the permit. Sludge requirements are cited in the permit as a
standard condition (Part III). As an update, the City of Troy has decided to build the new plant
with a larger capacity, and the existing older facility will be abandoned.

Secondary treatment limits were correct and expressed in proper units. Calculations of WQBELs
were done correctly and documented in the fact sheet. Descriptions of location, the receiving
stream, beneficial uses, and facility discharge were all complete. Standard conditions were the
"Part I" conditions cited on the MDNR website.

Yeolia Energy. Kansas City - MQ-0004847

The Veolia facility is a "steam loop" serving downtown Kansas City. A steam loop is a form of
power delivery in which the power plant, in this case coal fired, provides steam for heating the
buildings of a city rather than having boilers in each building. The Veolia plant is much like a
standard steam-electric power plant in terms of discharges. Wastewater from the facility is
discharged to the city sewers. Only non-contact cooling water is removed and then discharged
back to the Missouri River.

The fact sheet indicated that 316(b) needed to be considered and that BPJ limits were applicable,
but did not make a distinct finding.-The permit writer used the MDNR standardized methods for
calculating heat limits. The limits were calculated properly. The permit used real time stream
flows as a parameter, but did not specify the stream gage to be used for the flow measurement.

State Review Framework Report | Missouri | Page 33


-------
BASF Hannibal Plant - MQ-0001716

BASF manufactures various agricultural chemicals and intermediates to pesticide active
ingredients. Most waste is incinerated onsite.

The permit was issued without changes because the production levels had not changed. BASF
has asked for permit limits of one half of that allowed by the effluent guidelines as a driver for
maximum treatment. The prior permit was developed by the EPA to assist MDNR.

A major concern with the permit was the lack of limits for chromium VI. In 2010, BASF
discovered high amounts of chromium VI in the effluent discharge from Outfall 001. Discharge
levels for chromium VI were as high as 5100 |i/L, when the acute Water Quality Standard is 15
|i/L. The source of the chromium was breakdown of a chromium-based refractory in the
incinerators, with the heat of incineration driving the oxidation to the chromium VI state. The
refractory was replaced, and the problem was resolved, but the permit did not contain limits for
Chromium. Since the chromium issue was handled by enforcement, it was not clear that the
permit writer had knowledge of the incident.

Missouri-American Water Company. Jefferson City - MQ-0004600

The Jefferson City WTP is one of several facilities on the Missouri and Mississippi Rivers that
discharge lime sludge to the river without treatment. The permit was issued with a companion
order with a schedule for studies to consider the factors included in setting site specific BPJ
technology-based permit limits. Solids discharges are authorized by the permit, but the permit
can be reopened when a final decision is made on the appropriate technology limits.

A concern with the permit was with the quality of the permit application accepted by the state.
The flow diagram submitted by the permittee showed the process for water treatment, but did not
even indicate where waste streams (river solids, lime sludge, and backwash water were leaving
the process. There was no description in the application of discharge patterns (sludge discharge
cycles, etc.) The application had monitoring for only one sample. The single sample had only 23
mg/L TSS, so discharge of lime sludge discharge was not even monitored.

A complete application for an industrial discharger requires a "line drawing of water flow
through the facility with a water balance" for those flows, a description of "frequency, duration,
and flow rate" for intermittent flows, and must document effluent characteristics through
representative monitoring. See 40 CFR 122.21(g)(2,3,4,7).

While the application was incomplete, the companion order will fill in the missing information.
MDNR should require complete applications with representative monitoring, and reissued
permits should contain representative monitoring.

Estates of D'Monaco - MQ-0135259

This permit is for a new, small development (population 150) near Table Rock Lake. Even
though the permit is for a very small facility, it was written with very good detail including water
quality-based limits for BOD, TSS, E. coli, TRC, phosphorus, and ammonia (aluminum and iron
are also limited if they are used as treatment chemicals).

The quality of this permit and fact sheet is an example of good documentation by MDNR. Even
though this is a small facility, the fact sheet template used by MDNR was filled out completely
and documented the rationale for all the permit limits.

State Review Framework Report | Missouri | Page 34


-------
City of Drexel WWTF-South - MQ-0023663

This permit is for renewal of a POTW, with a design flow of 50,000 gallons per day. The permit
was issued February 2013 and given an expiration date of December 2017. The less than five
year expiration date was given in order for the facility to meet permit synchronization. During
the review it was discovered that not all of the sludge information was provided and that pH
changed from 6.0 SU to 6.54 SU; however, on the factsheet the antibacksliding provision was
not marked correctly. The permit did include appropriate monitoring requirements, and standard
and special conditions.

JCPSD. Mirasol WWTF - MQ-0134147

Jefferson County Public Sewer District is a minor POTW that has a design flow of 150,000
gallons per day. During the review, the ammonia parameter was changed to monitoring only.
The permit writer conducted a reasonable potential analysis and showed the results in the
factsheet; which resulted in a no reasonable potential. However, on the factsheet the
antibacksliding provision was not marked correctly. The permit did include appropriate
monitoring requirements, and standard and special conditions.

Brandco Investments. LLC - MQ-0088072

This permit is for renewal of a minor non-POTW domestic facility. The facility has a design
flow of 92,126 gallons per day and was issued July 2013 with an expiration date of September
2017. During the review it was discovered that the pH changed from 6.0 SU to 6.5 SU; however,
on the factsheet the antibacksliding provision was not marked correctly. The permit was given a
schedule of compliance for the facility to meet new ammonia limits and six months to obtain an
operator with the correct wastewater license. The previous copy of the permit was not found in
the facility file during the time of the review. The permit did include appropriate monitoring
requirements, and standard and special conditions.

SRG Global Inc. - MQ-0001180

SRG Global Inc. engages in electroplating, injection molding, and surface coating of plastic
automotive parts. It is an NPDES major discharger, with permitted stormwater discharges. There
were a number of problems noted during the review with the permit documentation. The
treatment train for the facility was not documented which could make bypass determinations
difficult. Cracks in floor through which spills, leaks, etc, had seeped, are called "bypasses"
which is not a conventional understanding of bypass. Limits for Silver had backslid from the
previous permit, but it was not clear if it was allowed backsliding. The factsheet did not explain
the basis for how TBELs were calculated (i.e. actual production, or other parameters).

Platte City - MO- 0026298

This facility is waste water treatment plant for Platte City, MO. The facility is a major with a
design flow of 2 MGD. A number of problems were noted when reviewing the fact sheet. It
appeared that reasonable potential analysis should have been conducted for CN due to data
submitted with the application, but there was no record that RP for CN had been performed.
There were not 3 priority pollutant scans and there were just 2 WET tests. The fact sheet says
that all the limits are at least as stringent as the previous permit, but there were some months
where the ammonia limits were higher.

State Review Framework Report | Missouri | Page 35


-------
Carthage WWTF - MQ-0039136

This facility is waste water treatment plant for the City of Carthage, MO. The facility is a major
with a design flow of 7 MGD. According to the state this permit had been worked on by a
number of permit writers over a period of time, and as a result the factsheet had a number
statements which were in disagreement (including tables of limits which didn't match). For
example, the factsheet indicated that the permit contains a schedule of compliance for certain
metals, but the permit only contains final limits and doesn't have a schedule of compliance. The
factsheet also indicates the permit will contain CMOM requirements, but it doesn't. Backsliding
issue are not addressed properly (e.g. FS says that there is no backsliding, but the daily max limit
for CN is higher than in the previous permit). The factsheet indicates that the receiving stream is
impaired for E. coli, but there is no indication whether there has been a TMDL established. It
appears that RP analysis for ammonia should have been performed but there is no indication that
it was and the permit just requires monitoring for ammonia.

H. National Topic Areas

National topic areas are aspects of the NPDES permit program that warrant review based on the
specific requirements applicable to the selected topic areas. These topic areas have been
determined to be important on a national scale. National topic areas are reviewed for all state
PQRs. The national topics areas are: nutrients, pesticides, pretreatment and stormwater.

1. Nutrients

For more than a decade, both nitrogen and phosphorus pollution has consistently ranked as one
of the top causes of degradation of surface waters in the U.S. Since 1998, The EPA has worked
at reducing the levels and impacts of nutrient pollution. A key part in this effort has been the
support the EPA has provided to States to encourage the development, adoption and
implementation of numeric nutrient criteria as part of their water quality standards (see the
EPA's National Strategy for the Development of Regional Nutrient Criteria). In a 2011 memo to
the EPA regions titled Working in Partnerships with States to Address Nitrogen and Phosphorus
Pollution through use of a Framework for State Nutrient Reductions, the Agency announced a
framework for managing nitrogen and phosphorus pollution that, in part, relies on the use of
NPDES permits to reduce nutrient loading in targeted or priority watersheds. To assess how
nutrients are addressed in the MDNRs NPDES program, the EPA Region 7 reviewed a
representative permit and held discussions with MDNR staff.

MDNR has a technology-based phosphorus limit (1 mg/L Daily Maximum, 0.5 mg/L Monthly
Average) for discharges to Lake Taneycomo and its' tributaries. 10 CSR 20-7.015(3)(E). In
addition, MDNR has recently promulgated numeric criteria for nitrogen (TN), phosphorus (TP),
and chlorophyll A for 25 lakes. Each lake has site specific criteria for each of the three
parameters. MDNR intends to continue work on criteria for lakes, and then work on running
waters. There is a real need to catch up on criteria for toxics, and this is a competing priority. The
new ammonia criteria, based on toxicity, are another consideration.

MDNR is developing a comprehensive process for reducing nutrients in the streams of Missouri.
The plan is being developed with a five year window and an adaptive management approach.
MDNR is using different strategies for different sectors, and is building approaches for each.
Even these larger sectors consist of differing sources. Agriculture includes row crops, pasture,

State Review Framework Report | Missouri | Page 36


-------
and animal husbandry. MDNR is aware that the options for nutrient reductions are much
different for small cities and the major facilities where economy of scale can come into play.
Urban non-point sources can be minimized by a large variety of activities and become very site
specific.

The Nutrient Management Reduction Committee has representatives knowledgeable in
agriculture, point source discharges, and stormwater. Meeting attendees have included large
municipalities (St. Louis, Kansas City, Springfield, and Independence) and the Missouri Public
Utilities Alliance, representing the smaller cities and towns. Agricultural representatives, such as
the Farm Bureau, and several environmental groups have been represented. First round
implementation will be based on the "biggest bang for the buck", focusing on getting the best
controls early on and fostering "buy in".

Agricultural groups have spent funds to support development of early implementation efforts. In
addition, the state has worked through existing programs and funding. Missouri has a 0.0005%
sales tax for Soil and Water Conservation. Most of that funding goes to 75%/25% match projects
for Soil Conservation, which is quite compatible with nutrient reduction goals, but a portion of
this funding will go to more nutrient oriented projects.

MDNR is also using existing program structures such as NRCS programs, the Department of
Conservation, and the University of Missouri Agricultural Extension.

The format being used is a step-wise process: explain the action, assess the current level of
implementation (Ex.-current use of cover crops), and assess a reasonable level of enhanced
implementation over the next 5+ years. For each planned action there is a consideration of the
potential difficulties and hurdles, and a plan to get past them. The nutrient plan is a bottom-up
approach where the MDNR asks: "What can we do now that will drive the most benefit?"

Like other states, MDNR is considering nutrient trading. Trading is new to the state, so there are
many policy decisions involved. MDNR would like to set a baseline of proper practice before
individuals are eligible to trade. MDNR hopes to release the final plan in the summer of 2014.

MDNR is actively working to improve nutrient controls using proven existing programs. A plan
is in the works and implementation will begin soon. MDNR needs to continue development of
numeric criteria for nutrients for more of the state's waters.

The EPA reviewed a number of permits to see how nutrients are controlled through the NPDES
process. While there are nutrient criteria for 25 lakes in the state, only a few of these lakes have
point source discharges. As an example, the permit for the Estates D'Monaco includes the
technology-based phosphorus limits set in MDNR rules for discharges to Table Rock Lake.

There are a few permits in southern Missouri that have phosphorus limits based on TMDLs, the
most notable example is a permit for Springfield, MO. One facility, Tyson Poultry, is close to the
state line, has phosphorus limits based on the downstream Oklahoma WQS.

MDNR does not have nutrient criteria for streams and rivers. The state has not used narrative
criteria to drive nutrient limits in NPDES permits.

State Review Framework Report | Missouri | Page 37


-------
2. Pesticides

On October 31, 2011, the EPA issued a final NPDES Pesticide General Permit (PGP) for
Discharges from the Application of Pesticides. This action was in response to a 2009 decision by
the U.S. Sixth Circuit Court of Appeals (National Cotton Council of America v. EPA. 553 F.3d
927 (6th Circuit 2009)) in which the Court vacated the EPA's 2006 Final Rule on Aquatic
Pesticides (71 Fed. Reg. 68483, November 27, 2006) and found that point source discharges of
biological pesticides and chemical pesticides that leave a residue, into waters of the U.S. were
pollutants under the CWA. The federal PGP applies where the EPA is the permitting authority.
Approximately 40 authorized state NPDES authorities have issued state pesticide general permits
as of November 2011.

On January 7, 2009, the Sixth Circuit Court vacated the EPA's 2006 NPDES Pesticides Rule
under a plain language reading of the CWA. National Cotton Council of America v. EPA. 553
F.3d 927 (6th Circuit 2009). The Court held that the CWA unambiguously includes "biological
pesticides" and "chemical pesticides" with residuals within its definition of "pollutant." In
response to this decision, on April 9, 2009, the EPA requested a two-year stay of the mandate to
provide the Agency time to develop general permits, to assist NPDES-authorized states to
develop their NPDES permits, and to provide outreach and education to the regulated
community. On June 8, 2009, the Sixth Circuit Court granted the EPA the two-year stay of the
mandate. On March 28, 2011, the U.S. Court of Appeals for the Sixth Circuit granted the EPA's
request for an extension to allow more time for pesticide operators to obtain permits for pesticide
discharges into U.S. waters. The court's decision extended the deadline for when permits would
be required from April 9, 2011 to October 31, 2011.

As a result of the Court's decision to vacate the 2006 NPDES Pesticides Rule, NPDES permits
are required for discharges of biological pesticides and of chemical pesticides that leave a
residue, to waters of the United States. The EPA proposed a draft pesticide general permit on
June 4, 2010 to cover certain discharges resulting from pesticide applications. The EPA Regional
offices and state NPDES authorities may issue additional general permits or individual permits if
needed.

The state drafted the PGP and began holding stakeholder meetings throughout the State.

Missouri continues outreach through stakeholder group continuing education, placing meeting
minutes online, technical bulletins and a copy of the PGP is online and can be found at
http://www.dnr.mo.gov/env/wpp/permits/pesticide.htm.

MDNR had no obstacles or barriers in state law restricting the state NPDES permitting authority
from fully implementing the NPDES PGP requirement. The Missouri PGP was signed on
October 31, 2011 and has a $150 fee the first year, and a $95 annual fee.

The final permit aligns closely with the federal PGP and is available to operators for the
application of 1) biological pesticides and 2) chemical pesticides which leave a residue (hereinafter
collectively "pesticides") that result in a discharge to waters of the United States (U.S.). In addition
to a PGP, Missouri has pesticide applicators laws that assist in controlling discharges from
pesticide applications at the Missouri Department of Agriculture. The PGP does not supersede
nor remove liability for compliance with county and local ordinances or other applicable federal
and state laws.

State Review Framework Report | Missouri | Page 38


-------
The Missouri PGP is silent on coverage for discharges from pesticide applications that are to
Outstanding National Resource Waters (ONRW), impaired waters, shallow wells, and
endangered and threatened species and critical habitats. It is also silent on coverage for
discharges from pesticide applications that are covered by another permit and discharges that are
one half mile from drinking water intake structures. Missouri staff will evaluate these discharges
on a case-by-case basis to determine if an individual permit is required for coverage. MDNR has
not issued any individual permits for discharges from pesticide applications at this time.

If a permittee meets the threshold criteria in the PGP, they must submit a Notice of Intent (NOI).
Missouri has received five (5) NOIs to date. These NOIs are paper submittals and Missouri has
plans to develop an electronic system.

The PGP requires annual reporting and a pesticide discharge management plan (PDMP) from
permittees who are required to submit a NOI. The permittee must maintain the annual report at
the address provided in the application. The PDMP must be maintained on site or at the address
provided in the address. Both documents must be made available to state staff upon request. The
PGP does not require ambient water quality monitoring because the MDNRs, WPCB's,
Watershed Protection Section collects monitoring data and is available upon request.

The PGP does include permitting requirements for discharges associated with declared pest
emergencies. A declared pest emergency is an event defined by a federal agency, state, or local
government of a pest problem determined to require control through application of a pesticide
beginning less than ten days after identification of the need for pest control. This public
declaration may be based on: (1) Significant risk to human health; (2) Significant economic loss;
or (3) Significant risk to: (i) Endangered species, (ii) Threatened species, (iii) Beneficial
organisms, or (iv) The environment.

MDNR has one primary staff member committed to administering NPDES permits for
discharges from pesticide applications and six staff members able to answer questions pertaining
to the PGP in the Central Office. In the Regional Offices there are at least 3-4 staff in each office
that are able to respond to questions.

Although the current PGP has a reopener clause to address any situation that may arise such as
new or modified State of Missouri Statues or Regulations, effluent limitations, or etc, it is
suggested that in the reissued permit the state addresses whether pesticide discharges to special
waters (e.g., Outstanding Natural Resource Waters and impaired waters) are addressed
differently than Waters of the State. The reissued permit should also address discharges to
endangered and threatened species and critical habitats and discharges near drinking water intake
structures.

3. Pretreatment

The State of Missouri was authorized to implement the Pretreatment program on June 3, 1981.
Individual POTW program approvals primarily occurred in the 1983 through 1985 time period.
Since then, eight programs have been granted Inactive status because they lost their industrial
base and no longer have SIUs, while ten cities have been required to develop Pretreatment

State Review Framework Report | Missouri | Page 39


-------
programs. Currently, there is one city working on developing a program (Gerald). Below is a
table of statistics based on answers to questions in the PQR checklist for Pretreatment.

State of Missouri Pretreatment Program at a Glance

2013

Number of Approved program cities (does not include inactive
programs)

46

Number of SIUs in Program cities

521

Number of non-Categorical SIUs in Program Cities

198

Percent with unexpired permits, Dec 31, 2012

100%

Number of Categorical SIUs in Program Cities

323

Percent with unexpired permits, Dec 31, 2012

99%

Number of SIUs in non-approved Cities

Unknown

Number of CIUs in non-approved Cities

26

Number of PCIs/PCAs in FY2012

15

Date State Program updated for Streamlining Regulations

10/30/2012

Program Overview

The MDNR implements its authorized Pretreatment program by splitting duties between the
Pretreatment Coordinator in the Jefferson City Central Office and inspectors in the five field
offices. In general, the Pretreatment Coordinator is responsible for Pretreatment implementation
NPDES permit language, assisting on audits or PCIs, and fulfilling reporting requirements to the
EPA Region 7. The Pretreatment Coordinator also receives all annual reports submitted by the
Pretreatment Program Cities. All NPDES permits are issued from the Jefferson City office.

The field offices inspect industries outside Pretreatment cities and conduct Pretreatment audits or
Pretreatment Compliance Inspections. In general, MDNR does not place much distinction
between an audit and a PCI. The goal of the CMS strategy is for each approved Pretreatment city
to receive one audit and two PCIs in a five year span. This equates to 138 total Pretreatment
inspections for the 46 cities in the five year period, or an annual average of 27.6. In FY2013,
MDNR inspected 21 Pretreatment cities while the EPA inspected 3, for a total of 24. However,
there are a number of Pretreatment cities that have had significant losses in SIUs and they do not
need the same level of oversight as they used to. The MDNR does a good job prioritizing those
cities that need a Pretreatment inspection in any given year.

Missouri has recently adopted the Streamlining Pretreatment Regulation Changes of November
14, 2005. The state adopted the EPA regulations by reference on October 30, 2012.
Consequently, they have legal authority for both the mandatory regulation changes as well as the
optional ones.

As part of the PQR analysis for Pretreatment implementation requirements, 15 permits and fact
sheets were selected, eight from Pretreatment program cities, and seven from non-program cities.
The non-program cities were chosen because they had an industry discharging to them that was
evaluated for the SRF analysis, also done as part of this Program Review. All of the seven non-

State Review Framework Report | Missouri | Page 40


-------
program cities reviewed have design flows less than 5 mgd and hence would not be required to
develop a program unless specifically required by MDNR.

Pretreatment implementation requirements, whether for program or non-program cities are
covered in the STANDARD CONDITIONS section of the city's NPDES permit by referring to
the latest version of Part II Standard Conditions, a stand-alone document, and in the Fact Sheet
section that addresses whether implementing a Pretreatment program is required.

The fact sheet used for all permits addresses whether a Pretreatment program is needed in the
section Part IV - Rationale and Derivation of Effluent Limitations & Permit Conditions. There is
a brief paragraph that describes what a Pretreatment program is followed by another paragraph
that is to be inserted into the permit, if the checkbox is checked to indicate the POTW has an
approved Pretreatment program. There is no language that is specified be put in a permit for any
POTW that is identified as not having a Pretreatment program.

Permits for Non-Program Cities

The MDNR enumerates the requirements that apply to a city's industrial users in PART II -
STANDARD CONDITIONS, which, because it is a stand-alone document, is controlled by
creating versions. This ensures that the language will be consistent from one permit to another.
For years the requirements were contained in a version that was from 1980, which is prior to the
effective date of the General Pretreatment Regulations, and prior to MDNR's authorization to
implement the Pretreatment program. Consequently, this version did not adequately capture
Pretreatment requirements when they were issued. On May 1, 2013, MDNR modified these
PART II - SPECIAL CONDITIONS requirements to capture the elements of the PQR checklist.
(Note that they are now called PART II - SPECIAL CONDITIONS although the permit refers to
them as PART II - STANDARD CONDITIONS). While six of the seven permits reviewed for
non-Pretreatment cities were issued prior to the revised PART II standards, this review did not
evaluate the old version but instead focused on the revised May 1, 2013, version since it will be
used upon permit reissuance for each facility.

In general, the language in the revised May 1, 2013 version satisfactorily establishes
requirements for any non-Pretreatment city to notify the MDNR of all SIUs (SIU as defined by
the General Pretreatment Regulations) pursuant to 40 CFR 122.44(j)(l) and 122.21(j)(6). In
addition, requirements are established to notify the Department pursuant to 40 CFR 122.42(b) ,
as soon as practicable, of any new pollutants introduced into the POTW or a substantial change
in volume or character of pollutants.

Of the eight non-program city NPDES permits reviewed, seven were issued prior to May 1,
2013. None of these seven contained a statement that MDNR had the authority to reopen and
modify the permit to require the development of a Pretreatment program. Despite the absence of
such a statement, it has not prohibited MDNR from doing so over eight times in the past ten
years. Nevertheless, the Shelbina permit, issued January 1, 2014 contains a statement on page 7
at D. SPECIAL CONDITIONS item 6 d, a statement that allows MDNR to reopen and modify to
require Pretreatment program development.

State Review Framework Report | Missouri | Page 41


-------
Permits for Pretreatment Program Cities

The eight permits selected for review for the Pretreatment program cities were not chosen at
random but where the same eight evaluated for the SRF portion of the MDNR Program Review.
As stated in the SRF evaluation, these were chosen from the list of 21 Program cities that either
received a PCI or Pretreatment audit in FFY 2013. These POTW permits were reviewed using
appropriate questions in the PQR checklist, the completed forms of which are attached.

However, while discussing Pretreatment implementation requirements that should be in NPDES
permits, MDNR staff requested the EPA review the permits for all approved Program cities and
identify if the appropriate implementation requirements were present. As this would be far more
valuable than just the PQR exercise, the study was made and the following table prepared using
NPDES permits and fact sheets (when available) downloaded from the MDNR website.

The table presents all MDNR approved Pretreatment programs including those that are currently
classified as inactive. The reason the inactive facilities are included is to discuss language
MDNR uses in the NPDES permit to acknowledge that a Pretreatment program exists and that
the permit holder can be required to reactivate it.

The table includes each Program city and the NPDES permit number of its wastewater treatment
plant. For those cities with more than one wastewater treatment plant, the permit number of the
principle plant is shown. This is the permit number that must contain the implementation
language and the permit number tracked in ICIS for implementation purposes. Also shown is the
city's status (e.g., active or is inactive) and the current permit expiration date (at the time of the
PQR Program evaluation). Twenty-two permits out of 54 were found to be expired and they
appear in red.

A review of ICIS indicates that MDNR has a number of facilities identified as PRET=Y that
should not be. For a POTW with multiple wastewater treatment plants, St. Louis MSD for
instance, only the principle plant should be so designated as PRET=Y. All of the other WWTPs
that are part of the MSD POTW should be designated as PRET = C. Without the correct
designation in the PRET field, the proper number of approved Pretreatment Programs cannot be
accurately determined. The MDNR needs to correct these mis-designations.

Typical Pretreatment program implementation language states: "The permittee shall implement
its approved pretreatment program in accordance with the requirements of 40 CFR Part 403. The
approved program is hereby incorporated by reference." Because implementation is by reference
to 40 CFR Part 403, all of the PQR provisions are automatically covered. Once MDNR passed
the Streamlining Regulations by reference, the Pretreatment implementation language began to
refer to 10 CSR 20-6.100 rather than 40 CFRPart403. This is equally valid.

Missouri FFY2013 Program Review - Cities with Pretreatment Programs

#

CITY

NPDES No.

Status

Exp. Date

implementation

reporting

local limits

1

AURORA

M00036757

inactive

4/3/2016

See Note 1

NA

NA

State Review Framework Report | Missouri | Page 42


-------
Missouri FFY2013 Program Review - Cities with Pretreatment Programs

#

CITY

NPDES No.

Status

Exp. Date

implementation

reporting

local limits

2

BOONVILLE

M00040738



2/10/2015

D.ll., page 9

D.ll., page 9

D.ll., page 9

3

CAMDENTON

M00106399

inactive

8/19/2015

See Note 2

NA

NA

4

CAPE GIRARDEAU

M00050580



4/1/2017

D.9., page 7

D.9., page 7

D.10., page 7

5

CARROLL TON

M00096318

inactive

3/22/2012

See Note 3

NA

NA

6

CARTHAGE

M00039136



3/31/2018

D.19., page 6

D.19., page 6

D.19., page 6

7

CASSVILLE

M00042579



3/24/2016

D.9., page 7

D.10., page 7

No

8

CENTRALIA

M00028789

inactive

12/31/2013

See Note 3

No

No

9

CHILLICOTHE

M00108227



9/18/2013

D.9., page 8

D.9., page 8

No

10

COLUMBIA

M00097837



9/23/2015

D.8., page 11

D.8., page 11

No

11

CUBA

M00094919



8/24/2011

D.8., page 4

D.9., page 4-5

No

12

FARMINGTON

M00040312



5/19/2016

No, See Note 4

No

No

13

HANNIBAL

M00093513



12/31/2013

D.9., page 8

D.9., page 8

D.10., page 9

14

INDEPENDENCE

M00089681



3/30/2014

D.7., page 6

D.8., page 6

D.9., page 6

15

JACKSON

M00022853



7/9/2014

D.9., page 7

D.10., page 7

No

16

JEFFERSON CITY

M00094846



12/11/2016

No

No

No

17

JOPLIN

M00103349



1/25/2012

D.ll. page 12

No

No

18

KANSAS CITY

M00024911



11/15/2016

D.10., page 8

D.10., page 8

No

19

KIRKS VILLE

M00049506

inactive

2/9/2011

C.7., page 3,See Note 5

C.9., page 4

C.8., page 3

20

LAMAR

M00044172



10/2/2013

D.9., page 5

D.10., page 5

D.ll., page 5

21

LEBANON

M00089010



1/3/2017

D.15., page 8

D.15., page 8

D.13, page 6

22

LITTLE BLUE VAL

M00101087



7/27/2015

D.8. page 7

D. 9. page 7

No

23

MACON

M00023221



4/3/2016

D.10. page 5

D. 10. page 5

D.10. page 5

24

MALDEN

M00100030

inactive

3/9/2011

See Note 6

NA

NA

25

MARSHALL

M00032883



11/7/2016

D.ll. page 8

D.ll. page 8

No

26

MARSHFIELD

M00040843



12/9/2015

D.10. page 7

D.10. page 7

E.2., page 11

27

MARYVILLE

M00033286



2/12/2014

D.ll,page 8

D.ll., page 8

No

28

MEXICO

M00036242



10/8/2014

D.10, page 5

D.ll. page 5

No

29

MOBERLY

MOO 117960



12/29/2010

No

No

No

30

MONETT

M00021440



8/21/2013

E.10, page 8

E.12., page 8

E.ll. page 8

31

MONROE CITY

M00055379



3/31/2014

D.10., page 6

D.10. page 6

No

32

MOUNT VERNON

M00022381

inactive

1/29/2014

See Note 7

NA

NA

33

N. KANSAS CITY

M00107956



6/30/1993

See Note 8

See Notes

See Notes

34

NEOSHO

M00039926



4/21/2016

D.9. page 21

D.9. page 21

No

35

NEPSD

MOO 12 8490



3/17/2016

D.10., page8

D.10,page 8

No

36

NEVADA

M00089109



5/12/2016

D.10., page 8

D.10., page 8

No

37

OFALLON

M00028720



12/11/2013

C.15., page 10

C.16., page 10

C. 17., page 10

38

PERRYVILLE

M00051144



3/19/2014

D.10., page 7

D.ll. page 7

No

39

POPLAR BLUFF

M00043648



12/10/2014

D.8., page 9

D.9. page 9

No

40

ROLLA

M00050652

inactive

4/30/2018

See Note 9

NA

NA

41

SEDALIA

M00023027



4/2/2014

D.9. page 6

D.9. page 6

No

42

SIKESTON

M00035009



3/31/2017

D.20. page 10

D.20. pagelO

D.20 page 10

43

SPRINGFIELD

M00049522



6/30/2016

D.13, page 9

D.13. page 9

No

44

ST. CHARLES

M00058351



2/12/2014

D. 10. page 8

D.10. page 8

No

45

ST. CLAIR

M00099465



2/9/2016

D.9. page 6

D.9. page 6

No

46

ST. JOSEPH

M00023043



6/18/2014

D.9. page 7

D.10. page 7

No

State Review Framework Report | Missouri | Page 43


-------
Missouri FFY2013 Program Review - Cities with Pretreatment Programs

#

CITY

NPDES No.

Status

Exp. Date

implementation

reporting

local limits

47

ST. LOUIS

M00025178



1/8/2017

D.13, page 10

D.13., page 10

D.18., page 11

48

ST. PETERS

M00030970



5/12/2016

See Note 10

No

No

49

SULLIVAN

MOO 104736



4/10/2013

See Note 11

E.l 1. page 9

E.12, page9

50

TRENTON

M00039748



6/30/2014

D. 22. page 8

D.22. page 8

No

51

UNION

M00025283



6/30/2015

No, See Note 12

No

No

52

WARRENSBURG

M00055905



12/3/2014

D. 11, page 4, lOcsr

D.ll.,page4

D.ll., page 5

53

WASHINGTON

M00025810



1/17/2013

D.9, page4

D.10, page 4

No

54

WENTZVILLE

M00093599



1/31/2019

No, See Note 12

No

No

No. of Active Programs: 46	Permit

Status:

Expired: 22
Active: 32

Notes to the Table

1.	Aurora was placed in inactive status in the late 1980's most likely before the requirement
to modify its approved Pretreatment program to address the PIRT and DSS regulation
changes. Consequently, it would be more practical to require them to develop a new
Pretreatment program rather than reactivate its approved one. The current permit's fact
sheet does not recognize that an approved program exists and states that no Pretreatment
program is needed. There is no reactivation language in the permit.

2.	Camdenton was originally required to implement an approved Pretreatment program
under NPDES permit number M00048577, which no longer exists. The Pretreatment
program is now inactive. There is no reactivation language in the permit.

3.	Carrollton and Centralia were placed in inactive status in the mid 1980's before the
requirement to modify their approved Pretreatment programs to address the PIRT and
DSS regulation changes. Consequently, it would be more practical to require them to
develop a new Pretreatment program rather than reactivate their approved one. There is
no reactivation language in their permit.

4.	Farmington's permit requires them to develop a Pretreatment program under the section
SCHEDULE OF COMPLIANCE on page 11. Section E.l. requires submittal of a
program within one year of permit issuance and that the permit will be reopened to
require implementation of the approved Program once approved. Section E.2. requires
implementation two years (May 19, 2013) after the permit's effective date (May 20,
2011). The city's Pretreatment program was approved on May 15, 2013. The permit has
not yet been reopened to require implementation.

5.	Kirksville was granted inactive status on October 17, 2013. Its NPDES permit is expired
but when reissued will need to have clause that requires reactivation upon notice by
MDNR.

State Review Framework Report | Missouri | Page 44


-------
6.	Maiden's requirement for program implementation was originally established in NPDES
permit M0002288. The city currently discharges under permit number M00100030. This
permit was placed in inactive status within the last 10 years and will need to address the
Streamlining regulations if reactivated. There is no reactivation language in its permit.

7.	Mount Vernon's permit does not have a statement that recognizes this permit as inactive,
nor does its fact sheet. It was placed in inactive status in the late 1980's prior to MDNR's
adoption of the PIRT and DSS regulation changes. It would be more efficient to require a
new program be developed rather than the old program be reactivated if new industry
moved into the city.

8.	North Kansas City obtained its approved Pretreatment program in the 1980's when that
city had its own wastewater treatment plant. Since then, the plant has been
decommissioned and the city now discharges to Kansas City, Missouri. North Kansas
City, however, wanted to retain its Pretreatment program so the program implementation
requirement was written into its water treatment plant's NPDES permit, MOO 107956.
This permit has been expired since June 30, 1993 so it was not available on the MDNR
website for review.

9.	Rolla's permit at SPECIAL CONDITIONS section E. 10. states that the city's
Pretreatment program is inactive and requires Rolla to notify MDNR 60 days prior to any
new industry commencing discharge so that the permit can be reopened and modified.
The fact sheet also states that the program is inactive.

10.	St. Peters' permit contains language at SCHEDULE OF COMPLIANCE (section E.l) to
develop a Pretreatment program within one year (5/12/12) of issuance of the permit
(5/13/11), and that upon approval the permit will be opened and modified to require
implementation. Section E.2. states that implementation shall commence two years
(5/12/13) after permit issuance. The city's program was approved by MDNR on July 1,
2013.

11.	Sullivan's permit contains requirements in D. SCHEDULE OF COMPLIANCE (p.7) to
submit a program for approval by May 1, 2009. The same Section states that by May 1,
2010 the city shall implement "a pretreatment program in accordance with 40 CFR Part
403." Also in the permit under E. SPECIAL CONDITIONS, item 9, page 8 states that
after the program is approved, the permittee shall implement and enforce its program.
The permit is currently expired.

12.	Union's and Wentzville's fact sheets state that a Pretreatment program is required,
however, there are no Pretreatment implementation requirements in the permit.

From the table one can see that most cities with approved Pretreatment programs have
implementation and reporting requirements in their NPDES permits. Four cities currently
implementing Pretreatment programs do not have any implementation language at all in their
NPDES permits: Jefferson City, Moberly, Union, and Wentzville. These cities should have the
NPDES permits modified as soon as practicable to include implementation requirements. In

State Review Framework Report | Missouri | Page 45


-------
addition to these, there are three cities who have had Pretreatment programs approved in their
current permit cycle, but have not yet had their permits reopened to insert implementation
language. These are St. Peters, Farmington, and Sullivan.

Of the 46 active POTW Pretreatment programs, 29 have active NPDES permits, while 17 are
expired. When the NPDES permit requires program implementation, reporting requirements also
are required in the permit. Permit conditions regarding the requirement for reevaluation of local
limits is not consistently included, as required at 40 CFR 122.44(j)(2)(ii) for approved
pretreatment programs. Of the 46 active Pretreatment programs, only 15 have local limits
reevaluation requirements, and 6 of these are in expired permits. Moreover, the citations in the
MDNR permits for local limits reevaluation are to 40 CFR 122.21(j)(4), which does not appear
to require local limits analysis. In addition, 40 CFR 122.44(j)(2)(ii) requires the reevaluation of
local limits following the issuance or reissuance of the NPDES permit, while MDNR's statement
requires the local limits evaluation be part of the permit application.

Industries Outside Program Cities

The PQR checklist contains a section for evaluating control mechanisms issued by the state to
industries outside Pretreatment program cities. The MDNR, however, does not have permitting
authority for indirect dischargers so is blocked from issuing permits to industries for which they
are the Control Authority. They have fairly good success, however, getting their 26 CIUs outside
Pretreatment cities to submit periodic compliance reports under 403.12(e). During the last
Program Review, the EPA found that none of the industries were certifying their reports as
required by at 40 CFR 403.12(1). This year's Program Review found that six of the seven
industries evaluated are now using the certification statement. The only facility that was not was
Bob Monnig Industries, a no-discharge hot dip galvanizing facility in Glasgow.

The MDNR does not track non-Categorical Significant Industrial Users outside Pretreatment
program cities.

4. Stormwater

The NPDES program requires stormwater discharges from certain municipal separate storm
sewer systems (MS4s), industrial activities, and construction sites to be permitted. Any state
which is authorized to implement the NPDES program automatically assumes responsibility for
the stormwater program. Missouri issues individual permits for medium and large MS4s, and a
general permit for small MS4s, general land disturbance permits for stormwater related to
construction activities, and a number of different general permits for stormwater related to
industrial activities. Industrial facilities not covered by one of the general permits gets coverage
under an individual permit. MDNR is fully implementing all aspects of the federally mandated
stormwater program. Stormwater permits are written at the central office in Jefferson City and
the central office has a comprehensive stormwater website set up to assist with the permitting
needs of the regulated community.

State Review Framework Report | Missouri | Page 46


-------
Background:

The Missouri general stormwater permits, and individual MS4 permits at the time of the PQR
were as follows:

•	Individual Phase IMS4 Permits: Kansas City, Independence, Springfield

•	Phase II General Permit

•	St. Louis Area MS4 Co-permit

•	General Permit to cover construction stormwater runoff

•	Fourteen General SW permits that cover various industries

For Missouri, the EPA Region 7 selected four NPDES stormwater permits to review:

•	Construction General Permit (MO-RA#####)

•	Phase II General MS4 Permit (MO-R040000)

•	Industrial General Permit for Clay Pits (MO-G84####)

•	Major Industrial Permit with Stormwater Requirements - SRG Global Inc. (MO-
0001180)

General Permit for Stormwater Discharges from Construction Activity

The general permit which covers stormwater from construction sites over one acre is effective
from February 8, 2012 to February 7, 2017. The permit was issued after the effective date for the
new construction stormwater effluent guidelines and includes all the required elements of 40
CFR 450.21. The requirements tend to mirror the federal regulation language. The permit
establishes a 25-foot natural vegetation buffer requirement around on-site waters. The biggest
recent change to the construction stormwater program is that the state now has a new electronic
NOI submittal system for obtaining coverage under this permit. NOIs are processed
electronically by the central office, and approximately 1 FTE is required for construction
stormwater permitting activities. The permit requires facilities to develop a site-specific
Stormwater Pollution Prevention Plan (SWPPP), but does not require the permittee to submit the
SWPPP unless the department requests it. The construction stormwater permitting program
appears to be running well, and no inconsistencies with federal regulatory requirements were
found during the review.

One recommendation for the next issuance of the Missouri Construction General Permit is to
translate the construction stormwater effluent guidelines in ways that make them clear and
enforceable; currently most have them have been incorporated verbatim from the C&D rule.
Additionally, the EPA found that some effluent limits are contained with the requirements for
development of a Stormwater Pollution Prevention Plan (SWPPP). For example, the 25-foot
buffer requirement, the stabilization requirements, and pollution prevention requirements are also
included within the SWPPP requirements. It is important that the permit have a clear distinction
between the effluent limits in the permit, which the State is responsible for developing, and the
discharger's SWPPP, which is a documentation tool used to demonstrate how the permittee plans
to comply with the permit's effluent limits.

State Review Framework Report | Missouri | Page 47


-------
Stormwater Discharges from Municipal Separate Storm Sewer Systems (MS4s)

Missouri currently has 162 Phase II MS4s including fourteen MS4s newly regulated due to the
2010 census. These newly regulated MS4s have been notified and have submitted applications
for permit coverage, and will be covered once the general permit is reissued. The general permit
for small Missouri MS4s expired 6-12-13. The state had been anticipating a new EPA
stormwater rule affecting the post-closure requirements for MS4s, but after the many delays in
proposing a rule, decided to finally go ahead with reissuance in the absence of such a rule.
Reissuance has been held up by efforts to respond to stakeholder concerns. Overall, at this point,
it appears that the new permit will be similar to the old permit; the permit contains the specific
requirements for the six minimum measures required by 40 CFR 122.34, and will contain the
same post-construction standard as the expired permit of reasonably mimicking the pre-
development conditions at the site.

Missouri plans to use the final general MS4 permit as a template for reissuing the Phase IMS4
permits, which are all expired, in an attempt to bring the Phase I and Phase II requirements to
parity. The state plans to reissue the permits in the following order: state-wide general permit,
Springfield, Kansas City, and Independence. The state reports that 1.5 FTE are used in MS4
permitting efforts. In 2012 the state published the Missouri Guide to Green Infrastructure:
Integrating Water Quality into Municipal Stormwater Management, to promote Green
Infrastructure practices in regulated MS4s. Draft versions of the proposed general permit are
consistent with federal regulatory requirements.

General Industrial Permit for Clay Pit Mining

As mentioned above, Missouri does not have one multi-sector general permit to cover
stormwater from all the various industrial facilities needing coverage. Instead there 14 different
general industrial stormwater permits each covering a different industry. Facilities in industries
not covered by these permits get coverage under individual permits. The state reports that 5 FTE
are involved in industrial stormwater permitting activities. For this PQR the general permit for
clay pits was chosen for review.

The general permit for clay pits is effective from November 13, 2009 to November 12, 2014 and
covers stormwater and process wastewater discharges from clay mining and stockpiles (SIC
codes 1455 and 1459). The following are some of the more significant requirements in the
permit: The permit has numeric limits based for various parameters, some of which are
technology-based, and some which are water quality-based. In addition to certain required Best
Management Practices (BMPs), the permit requires facilities to develop site-specific SWPPPs to
order to minimize the contaminants that might enter the stormwater. Most facilities are not
required to submit their SWPPP to the Department unless notified by the Department that they
must do so. Site inspections must be conducted at least monthly. Discharges are prohibited from
causing violations of narrative water quality standards which are all explicitly included in the
permit.

State Review Framework Report | Missouri | Page 48


-------
Major Industrial Stormwater Permit - SRG Global Inc.

Effective dates of the permit are from August 1, 2013 to December 31, 2015 (as part of its
watershed permitting effort the state is issuing permits with less than a 5-year duration in order to
get permittees in the same watershed on synchronized permitting schedules). The permit is
currently on appeal and the conditions have been stayed pending resolution of the appeal. The
facility engages in injection molding, electroplating, and surface coating of plastic automotive
parts.

The permit lists three stormwater outfalls and contains numeric limits on these outfalls for pH,
Chemical Oxygen Demand, and Total Suspended Solids. In addition to certain specified BMPs
the permit requires the facility to develop a site-specific SWPPP with appropriate BMPs in order
to minimize the contaminants that might enter the stormwater.

IV. REGIONAL TOPIC AREA FINDINGS

A. 316(a) - Thermal Discharge

MDNR has developed an mathematical approach for the complex task of developing permit
limits based on the state's heat criteria. The Determining Thermal/Temperature Limits Guidance
document contains example calculations for both the Missouri and Mississippi Rivers since heat
criteria are different for the two rivers. This document serves as an implementation guide and an
SOP for permit writers.

Many facilities, primarily steam-electric plants, on the two large rivers will have difficulty
meeting the heat criteria during warmer stream conditions. The temperature criteria for the
Missouri River only contain a maximum summer temperature, while the criteria for the
Mississippi River include monthly limits on maximum temperature. In warm years, river
temperatures have approached or even exceeded the caps set in state criteria. As a result, the
discharges of heat by the facilities exceed the temperature criteria. In these cases, facilities may
consider pursuing the studies associated with a 316(a) variance.

The 316(a) variance process requires the facility requesting the variance to collect sufficient
biological data to support a finding by the permitting authority that a "balanced and indigenous
community" is protected in spite of the exceedance of the states' numeric heat criteria. While
316(a) were granted in first round of NPDES permitting in the 1970's, the renewal of those
variances has received little attention. Changes in the facilities and the river over time have made
most of the old studies out of date.

In 2013, the Office of Inspector General (OIG) released a report (Report No. 13-P-0264)
(http://www.the EPA.gov/oig/reports/2013/20130523-13-P-0264.pdf) reviewing permits with
thermal requirements. The OIG could not find any permits that had met the regulatory
requirement for proper public notice when old 316(a) variances were renewed. The EPA urges a
careful review of variance renewals and careful attention to the public notice requirements. See
40 CFR 124.57 for a description of the variance process and the public notice requirement.

State Review Framework Report | Missouri | Page 49


-------
MDNR has shown a firm commitment to proper calculations of permit limits, and this is a great
first step. For some facilities, 316(a) variance studies will be required to justify the request for
thermal variance. MDNR is including permit language that allows for 316(a) studies. The key to
those studies is in setting up data collection methodologies that firmly support variance
decisions. Both permittee and regulator benefit from regulatory certainty in final decisions.

B.	316(b) - Cooling Intake Structures

Like other states, MDNR has been waiting for the 316(b) existing facilities rule promulgation.
Prior to release of the new rule, permit writers are required to use site specific BPJ to select the
protection technologies for intake structures. It has been difficult for permit writers to push
greater levels of protection, when those new controls might be contradicted or made obsolete by
the pending rulemaking.

Difficult issues of 316(a) and 316(b) have created a "wait and see" approach where some permits
for big river facilities are on the backlog. Hopefully the new 316(b) rules, recently released, will
provide some certainly and permits can be reissued.

C.	Whole Effluent Toxicity (WET)

WET testing serves as a means to assess toxicity from chemicals not covered by numeric criteria
and provides a measure of the additive or interactive effects of mixtures of constituents in water.
WET testing is the most important means of assessing compliance of the narrative criteria of "no
toxics in toxic amounts".

MDNR has shown great improvements in the WET program. MDNR is using multiple dilution
tests yielding results in "toxic units" with fathead minnows and Ceriodaphnia. Multiple dilution
tests give more information about the level of detected toxicity and allow statistical assessment
of data sets.

The EPA updated the WET lab methods in 2002 and MDNR has updated permit language to
incorporate the new methods.

Most importantly, MDNR has updated state standards to require testing and limits for chronic
toxicity. The definition of chronic toxicity is based on the sub-lethal endpoint of the IC-25 affect
and is expressed as a criteria of 1.0 TUc. This is an important completion of the WET program
and provides an improved level of protection for the state's streams. The need to include chronic
WET testing and limits in permits had been a priority item listed in several past audits of the
state program and had been an the EPA headquarters "action item" requiring follow-up. MDNR
is working on implementation approaches for requiring testing and limits in permits.
An important change in the new standards is the approach to WET limits in permits. In the past,
MDNR included acute limits in all major permits and in significant minor permits. The new
water quality standard rules require MDNR to make a decision on reasonable potential and
include WET monitoring or limits based on that finding. In facilities where monitored toxicity
(acute or chronic) is below the calculated waste load allocation for Toxic Units, the old limit will
be removed from the permit, but monitoring will still be required. This is a form of backsliding
that should be addressed in the fact sheet.

MDNR's permit language describing WET requirements has been updated and greatly improved.
The EPA encourages continued review and honing of permit language to assure that
requirements, whether monitoring or permit limits, are clear, concise, and enforceable.

State Review Framework Report | Missouri | Page 50


-------
D. Missouri Sludge Program

MDNR has not desired full authorization to run the sludge program, but has still been very
active in maintaining sludge requirements in permits. When the Part 503 regulations were first
promulgated, Missouri was one of the most active states in the nation in outreach and education
of facility operators.

MDNR has provided several services to permittees which help keep up awareness of the Part 503
requirements and guide operators on the points of compliance.

The Missouri Extension Program has a number of links for short papers that explain basic
compliance with the Part 503 rules and the science behind the requirements. These may have
fallen out of use, but they are still helpful. The EPA would suggest links to these papers from the
MDNR website.

Part III of the Standard Conditions in permits for POTWs contains a summary of the Part 503
rules and sets out compliance requirements in an orderly, easily understandable format. The
standard conditions include several of the papers mentioned above (WQ 422-426) as
requirements by citation. While the Part 503 rules are self-implementing, the rules are complex
and MDNRs inclusion of the Part III Standard Conditions has been a great help in assisting
permittees understand the points of compliance.

Part 503 has annual reporting requirements for larger facilities. The EPA did not create uniform
reporting forms for the annual reporting due to the paperwork reduction act and the difficulties of
getting forms through OMB. MDNR's "Form S" reporting forms are straightforward and guide
the permittee in documenting compliance. By going through the forms (which fit well with the
Part III Standard Conditions), the permittee is instructed in the proper testing and documentation
needed for compliance. From the regulator's standpoint, these forms are easy to review.

E. Concentrated Animal Feeding Operations

The Federal Concentrated Animal Feeding Operations (CAFO) Rule revisions became effective
December 20, 2008. Then in July 2012, in response to a court decision vacating portions of the
2008 CAFO rules, the rules were further amended to eliminate the requirement that an owner or
operator of a CAFO that "proposes to discharge" must apply for a NPDES permit. MDNR
revised its CAFO regulations to make them consistent with the 2008 federal rules on February
28, 2009 while the Missouri CAFO Nutrient Management Technical Standard became effective
on March 4, 2009. At present, MDNR is revising it regulations in response to the 2012 revision
to the federal regulations and proposes to remove the language relating to CAFO construction
permitting requirements from its CAFO Design Guide (to 10 CSR 20-8.300) and from its CAFO
operating regulations (10 CSR 20-6.300). The EPA submitted comments to MDNR on the
proposed regulations in February 2014. Plans are for the proposed regulations to go on public
notice in 2014.

The CAFO permit program is administered out of the Central Office in Jefferson City by a staff
of 4 people. MDNR staff issue construction permits (for earthen basins only) and operating

State Review Framework Report | Missouri | Page 51


-------
permits, review nutrient management plans (NMPs) and applications, and are responsible for
changes to regulations. During the last Missouri program review in 2010, the Agricultural
Section had positions for 3 FTE engineers and 2 soil scientists dedicated to the CAFO permitting
program. Since then, the CAFO permitting staff has become part of the Industrial Section and
currently consists of 3 staff, none of whom work on CAFOs full time. MDNR has five field
offices throughout the state. There is 1 inspector, (not 100% FTE) located in each of the 5 field
offices, who is responsible for inspecting NPDES permitted CAFOs at least once per permit
cycle. The inspector also is responsible for responding to complaints associated with livestock
facilities.

In 2010, there were 550 NPDES permits for CAFOs. Of these operations, 525 were covered by
MDNR's general NPDES permit for CAFOs. In response to court decisions holding that CAFOs
that do not discharge are not obligated to have NPDES permits, there has been an exodus from
NPDES permits to state no-discharge permits. Currently, MDNR has 21 operations covered
under an individual NPDES Permit, and 29 operations covered under a NPDES General Permit
(MOG010000) issued February 24, 2013. This is a 95% reduction in NPDES permit coverage.
MDNR established the state no-discharge General Operating Permit (MOGS10000) on January
28, 2013. The state no-discharge general permit is most applicable to operations where
productions areas are under roof and covers 437 operations (mostly swine and poultry CAFOs).
Since most of the state no-discharge permitted operations transfer all of their manure and process
wastewater, MDNR developed a one-page sheet that covers 8 of the 9 minimum NMP
requirements (protocols for land application is omitted). This one page state-NMP is for facilities
that transfer all of their waste and is submitted with their notice of intent (NOI) to be covered
under MOGS 10000. Public notice of changes to the state-NMP are not required under the state
no-discharge general permit because the no-discharge permits are not subject to federal public
notice requirements.

Inspections at CAFOs operating without an NPDES permit need to effectively evaluate and
clearly document whether the facility discharges and is subject to NPDES permitting
requirements. (See SRF CWA Element 2 - Inspections). In order to conduct a parallel review
with the enforcement side, facilities were picked from a 2013 inspection targeting list. However,
since selection for review, three of the five CAFOs applied for and obtained a state no-discharge
operating permit. The remaining 2 facilities reviewed have coverage under an individual NPDES
permit. As a result, the EPA reviewed the permit applicable to each selected CAFO.

Results of file review:

Reviewed 3 Notice of Intent (NOI) for coverage under the State General No-Discharge
permit:

•	MOGS10423 Ponderosa LLC

•	MOGS10174 AR Curtis Inc.

•	MOGS10428 Danny Bevill

The State No-Discharge permit requires CAFOs to develop and implement a state-NMP that
meets the requirements of 10 CSR 20-6.300(5) and the state Technical Standard upon the
effective date of coverage of this permit. Both Ponderosa and AR Curtis failed to complete the

State Review Framework Report | Missouri | Page 52


-------
NMP section of the NOI, and MDNR's no-discharge assessment is based on the information in
the NOI. This begs the question: is MDNR conducting sufficient assessments of whether these
facilities are not discharging? Pursuant to the EPA's Compliance Monitoring Strategy, facilities
claiming that they do not discharge should be inspected once to determine if they are designed,
constructed, operated and maintained so that the facility does not discharge to a water of the US
and re-inspected if new information becomes available that they do discharge. However, based
on the NOI application procedure, the MDNR's limited resources, the file review and recent
EPA enforcement actions in Missouri documentation was unavailable to demonstrate that
MDNR is adequately ensuring that CAFOs applying for the no-discharge permit are truly no-
discharge operations.

In response to an NMP question contained in the NOI, "do animals have access to waters of the
state within the production area", both AR Curtis and Danny Bevill indicated yes. In both
instances this would be a facility characteristic that would likely disqualify the CAFOs from
coverage under the no-discharge permit. However, it was not documented that MDNR followed
up with the operations to substantiate the no-discharge claim.

Reviewed 2 CAFO NPDES permits:

•	MO-0131032 DM Farms (Murphy Family Ventures, Ozark-Osage Pyramid)

•	MO-Ol 19962 Sharpe Land and Cattle Company

DM Farms is a Class IV CAFO that was individually permitted in August 2011 for 50,912 swine
> 55 lbs and 15,952 swine < 55 lbs. The production area includes 10 anaerobic lagoons each with
a secondary containment structure to contain any spills. As required in 10 CSR 20-
6.300(3)(H)(4), operations with a wet handling system that also use a flush system shall have a
secondary containment structure(s) or earthen dam. The NMP addressed all of the 9 minimum
requirements in a concise and complete manner.

Sharpe Land and Cattle Company is a Class IV CAFO that was individually permitted December
10, 2010 for a maximum of 1200 goats and 8,514 dairy cows. The current NMP was submitted
on July 11, 2011, seven months after the permit was issued. The CAFO operation contains both
domestic and livestock wastewater systems. The livestock production areas consist of multiple
earthen basins, a solids composter, a feed storage area, and a composting area for solids and dead
animals. Waste from the dairy milking parlor is removed using a freshwater flushing system and
a mechanical solids separator. The solids separator has a secondary containment structure as
required by 10 CSR 20-6.300(3)(H)(4). While the permit states that there shall be no release of
process wastewater from secondary containment structures, the permit does allow stormwater to
be released when in-field testing of ammonia-N is less than 2.5 mg/L. Stormwater that exceeds
the 2.5 mg/L ammonia-N limit must be pumped back into the lagoon or properly land applied.
The origin of testing "stormwater" for ammonia-N at 2.5 mg/L at CAFOs is not known. The
permit states that any discharges to waters of the state, including those discharges allowed by this
permit, shall not cause a violation of the state water quality standards. The chronic criteria for
ammonia-N is 2.5 mg/L at certain pH's and temperatures, but not all.

The NMP consisted of 2 volumes; the contents of which were not all required by regulation. The
permit requires a P-Index to be conducted on all application fields, but only indexes for fields

State Review Framework Report | Missouri | Page 53


-------
that were rated high or very high were included. Past monthly manure analyses and required soil
tests were included in the NMP, although the lab method used to analyze the available soil test P
could not be readily found.

Discussion of Issues of Concern

The EPA supports the requirement that calls for operations with a wet handling system that also
use a flush system to have secondary containment structure(s). This requirement provides an
additional safeguard, especially at operations that have moved from an NPDES to state no-
discharge permit, against pollutant discharges that are violations of state and federal discharge
prohibitions. However, it appears that MDNR allows the release of collected precipitation runoff
when ammonia field tests indicate the collected runoff is process wastewater because of the
presence of pollutants. The effluent limitations for NPDES permitted CAFOs, codified in 40
CFR Part 412, prohibit the discharge of manure, litter, and other process wastewaters, except for
allowing discharges when rainfall causes an overflow from a facility designed, maintained, and
operated to contain all manure, litter, and process wastewater (including stormwater) plus runoff
from the 25-year, 24-hour rainfall event. Any stormwater that contains pollutants because it has
come in contact with feed, manure, litter, etc. is process wastewater and subject to the Effluent
Limitation Guidelines and cannot discharge except as authorized by an NPDES permit.
Unpermitted CAFOs (including CAFOs with State No-Discharge permits) cannot discharge
pollutants under any conditions. All uncontaminated stormwater originating outside of the
production area footprint should be diverted to prevent contact with manure, litter, or process
wastewater as specified in CFR 40 §122.42 (e)(iii). Any stormwater that comes in contact with
these materials must be collected and disposed of in a manner that is consistent with the CWA.

Missouri's definition of process wastewater does not appear to be as broadly defined as the
definition in the federal regulations. The federal definition includes water directly or indirectly
used in the operation of the AFO. The EPA indicated this difference in the definitions in
comments recently submitted in February 2014 to MDNR in response to MDNR's proposed
regulation changes. It is the EPA's expectation that this issue, and other issues identified in the
EPA's comments on the proposed regulations, will be addressed as part of MDNR's revisions of
the CAFO regulations.

In 2011, MDNR compiled a wet weather management guide (PUB2422) to aid in a producer's
decision making and planning so as to minimize/eliminate impacts to water quality. Currently,
the guide is referenced in both the NPDES and state no-discharge permits (the individual permits
were issued prior to the guide's formation). The EPA agrees that chronic precipitation events
may cause retention structures to exceed capacity, and if the operation is properly designed,
constructed, operated and maintained, an NPDES permit authorizes a discharge under certain
circumstances, including chronic rain periods that exceed designed storage capacity. In
describing precautions that can be taken during a chronic wet weather event, the guide references
language from the 2011 NPDES CAFO General Permit. Suggested practices include applying
effluent to frozen or saturated soils and land application to prevent collapse of a lagoon's berm.
However, such authorizations are not applicable to CAFOs without NPDES permits; meaning
these authorizations are not available to CAFOs with State No Discharge permits.

State Review Framework Report | Missouri | Page 54


-------
All pollutant discharges from a CAFO to waters of the US are prohibited unless pursuant to a
NPDES permit. Facilities covered under the State No-Discharge permit are not allowed to
discharge under any circumstances because they do not have an NPDES permit. The State No-
Discharge permit states that if storage structures are in danger of discharging due to a chronic
wet weather event, CAFO owners shall take reasonable steps to lower the liquid level in the
structure through land application, or other suitable means (as outlined in the wet weather
guidance), to minimize or eliminate water quality impacts. For land application areas, the permit
specifies that there shall be no discharge of manure, litter, process wastewater, or mortality by-
products to surface waters of the state except where the discharge consists entirely of agricultural
stormwater. Federal regulations require implementation of nutrient management practices by
CAFOs seeking the agricultural stormwater exemption for land application area discharges.
Discharges of manure or process wastewater not applied at appropriate agronomic rates, are not
agricultural stormwater and are thus violations of the CWA and subject to NPDES permitting.
Moreover, a discharge from an unpermitted CAFO caused by application of effluent to frozen or
saturated fields would not be considered consistent with nutrient management practices and
would not be exempt under the agricultural stormwater exemption.

As recently as 2008-2011, hundreds of NPDES-permitted CAFOs in Missouri were authorized
discharge because of chronic rain events. Many of these CAFOs are now operating under the
state no-discharge permit and will risk discharges that violate the CWA if they operate as
outlined in the wet weather guidance when chronic rains occur again.

Level 1

The MDNR definition of process wastewater must be as stringent as the federal regulation at 40
CFR 122.23(b)(7). The definition must include water directly and indirectly used in the operation
of a CAFO.

All uncontaminated stormwater originating outside of the production area footprint should be
diverted to prevent contact with manure, litter, or process wastewater as specified in CFR 40
§122.42 (e)(iii). Any process wastewater/stormwater that comes in contact with these materials
as specified in 40 CFR 122.23(b)(7) must be collected and disposed of in a manner that is
consistent with the CWA. Authorization of discharges of process wastewater must be pursuant to
a NPDES permit and consistent with the Effluent Limitation Guidelines.

MDNR is not sufficiently reviewing NOIs to ensure CAFOs applying for the state no-discharge
permit do not discharge to waters of the United States.

The Wet Weather Management guide (PUB2422) contains practices that minimize discharges
from land application areas during wet weather events. This guide was created to assist NPDES-
permitted CAFOs to protect their runoff control structures from failures resulting from chronic
and/or catastrophic precipitation events by authorizing limited discharges. However, the state no-
discharge general permit cites the guide and also states that there shall be no discharge of
manure, litter, process wastewater, or mortality by-products to surface waters of the state... except
where it is an agricultural stormwater discharge. Land application timing and rates are critical to
ensuring application at agronomic rates. Application of pollutants to precipitation-saturated

State Review Framework Report | Missouri | Page 55


-------
fields cannot be considered appropriately timed for agronomic uptake. Discharges of manure or
process wastewater not applied at appropriate agronomic rates, are not agricultural stormwater
and are thus violations of the CWA and subject to NPDES permitting. Implementation of the
Wet Weather Management guide at CAFOs without an NPDES will not negate CWA liability.

V. ACTION ITEMS

This section provides a summary of the main findings of the review and provides proposed
action items to improve Missouri's NPDES permit programs. This list of proposed action items
will serve as the basis for ongoing discussions between EPA Region 7 and Missouri as well as
between EPA Region 7 and EPA HQ. These discussions should focus on eliminating program
deficiencies to improve performance by enabling good quality, defensible permits issued in a
timely fashion.

The proposed action items are divided into three categories to identify the priority that should be
placed on each Item and facilitate discussions between Regions and states.

•	Critical Findings (Category One) - Most Significant: Proposed action items will address
a current deficiency or noncompliance with respect to a federal regulation.

•	Recommended Actions (Category Two) - Recommended: Proposed action items will
address a current deficiency with respect to EPA guidance or policy.

•	Suggested Practices (Category Three) - Suggested: Proposed action items are listed as
recommendations to increase the effectiveness of the state's or Region's NPDES permit
program.

The critical findings and recommended actions proposed should be used to augment the existing
list of "follow up actions" currently established as an indicator performance measure and tracked
under EPA's Strategic Plan Water Quality Goals or may serve as a roadmap for modifications to
the Region's program management.

A.	Basic Facility Information and Permit Application

Category 1- Federal Rules require that permit applications for major POTWs include three
priority pollutant scans (40 CFR 122.21(j)(4) and 40 CFR 122.21 appendix J), but MDNR is only
requiring one scan from major POTWs.

B.	Technology-based Effluent Limitations

No deficiencies were noted during the program review.

C.	Water Quality-Based Effluent Limitations

Category 1 - When calculating Reasonable Potential, it appeared that the application data
indicated that it was not being used in the analysis.

Category 1 - The factsheet states that limitations within the permit for the reissuance of this
permit conform to the anti-backsliding provisions of Section 402(o) of the Clean Water Law and

State Review Framework Report | Missouri | Page 56


-------
40 C.F.R. Part 122.44; however, several effluent parameter limitations have changed or been
eliminated without an explanation as to how they conform to the backsliding provision.

D.	Monitoring and Reporting

Category 2 - MDNR is making progress in permitting for Water Treatment Plants (WTP). The
EPA urges a robust approach to setting BPJ-based technology limits, and in consideration of
water quality-based limits. MDNR should assure that WTP are submitting complete applications
with representative monitoring. Reissued permits, even those accompanied by orders, should
have representative monitoring.

E.	Standard and Special Conditions

No deficiencies were noted during the program review.

F.	Administrative Process

No deficiencies were noted during the program review.

G.	Documentation

No deficiencies were noted during the program review.

H.	National Topic Areas

Proposed actions items for core topic areas are provided below.

1.	Nutrients

Category 2 - The EPA views the adoption of numeric nutrient criteria as an important tool for
effective water quality management of nutrient pollution. MDNR needs to continue development
of numeric criteria for nutrients for the state's waters.

2.	Pesticides

Category 3 - It is suggested that in the reissued permit the state addresses whether pesticide
discharges to special waters (e.g., Outstanding Natural Resource Waters and impaired waters)
are addressed differently than Waters of the State. The reissued permit should also address
discharges to endangered and threatened species and critical habitats and discharges near
drinking water intake structures.

3.	Pretreatment

Category 1 - MDNR must ensure that permits for all cities currently implementing Pretreatment
programs contain language that requires implementation in accordance with the requirements of
40 CFRPart 403. Jefferson City, Moberly, Union, Wentzville, St. Peters, Farmington, and
Sullivan are missing implementation requirements.

State Review Framework Report | Missouri | Page 57


-------
Category 1 -MDNR must ensure that permits for POTWs with pretreatment programs include
the requirement to reevaluate local limits in timely manner per 40 CFR 122.44(j)(2)(ii).

Category 2 - MDNR must review and improve the quality of data in ICIS.

Category 3 - MDNR should ensure that fact sheets for POTWs without pretreatment programs
state that a pretreatment program is not required and describe any discharging industries.

Category 3 - MDNR should follow-up with CIUs outside of Pretreatment program to ensure they
are complying with reporting requirements.

4. Stormwater

No deficiencies were noted during the program review

I. Regional Topic Area

Proposed action items for special focus areas are provided below.

1. & 2. 316 (a) Thermal Discharge and 316 (b) Cooling Intake Structure

MDNR has developed a strong approach for calculating heat limits, but will need to build
capability for assessing 316(a) variances where those are requested. There are several facilities
where variances will be needed, and as highlighted by the OIG report, this needs to be done
correctly. Renewal of 316(a) variances must be justified by data as required by 125.70-73.

3.	Whole Effluent Toxicity

The MDNR WET program has been significantly updated and improved by the addition of
chronic wet testing and limits.

4.	Sludge

MDNR has included useful explanation of Part 503 requirements in permits and in reporting
forms: this has been a great help to the EPA and to permittees.

5.	Concentrated Animal Feeding Operations

Category 1 - The MDNR definition of process wastewater must be as stringent as the federal
regulation at 40 CFR 122.23(b)(7). The definition must include water directly and indirectly used
in the operation of a CAFO.

Category 1 - All uncontaminated stormwater originating outside of the production area footprint
should be diverted to prevent contact with manure, litter, or process wastewater as specified in
CFR 40 §122.42 (e)(iii). Any process wastewater/stormwater that comes in contact with these
materials as specified in 40 CFR 122.23(b)(7) must be collected and disposed of in a manner that
is consistent with the CWA. Authorization of discharges of process wastewater must be pursuant
to a NPDES permit and consistent with the Effluent Limitation Guidelines.

Category 1 - MDNR is not sufficiently reviewing NOIs to ensure CAFOs applying for the state
no-discharge permit do not discharge to waters of the United States.

State Review Framework Report | Missouri | Page 58


-------
Category 1 - The Wet Weather Management guide (PUB2422) contains practices that minimize
discharges from land application areas during wet weather events. Implementation of the Wet
Weather Management guide at CAFOs without an NPDES will not negate CWA liability. It
should either be removed from the state permit or revised based on the no-discharge requirement.

Category 3 - Notice of Intent (NOI) application forms appear to contain language or terms that
create confusion or misunderstanding regarding conditions that require CAFO owners or
operators to apply for NPDES permits.

State Review Framework Report | Missouri | Page 59


-------
State Review Framework

I. Background on the Clean Water Act State Review Framework

The State Review Framework (SRF) is designed to ensure that the EPA conducts nationally
consistent oversight. It reviews the following local, state, and the EPA compliance and
enforcement programs for the Clean Water Act National Pollutant Discharge Elimination System

Reviews cover:

•	Data — completeness, accuracy, and timeliness of data entry into national data systems

•	Inspections — meeting inspection and coverage commitments, inspection report quality,
and report timeliness

•	Violations — identification of violations, determination of significant noncompliance
(SNC) for the CWA

•	Enforcement — timeliness and appropriateness, returning facilities to compliance

•	Penalties — calculation including gravity and economic benefit components, assessment,
and collection

The EPA conducts SRF reviews in three phases:

•	Analyzing information from the national data systems in the form of data metrics

•	Reviewing facility files and compiling file metrics

•	Development of findings and recommendations

The EPA builds consultation into the SRF to ensure that the EPA and the state understand the
causes of issues and agree, to the degree possible, on actions needed to address them. SRF
reports capture the agreements developed during the review process in order to facilitate program
improvements. The EPA also uses the information in the reports to develop a better
understanding of enforcement and compliance nationwide, and to identify issues that require a
national response.

Reports provide factual information. They do not include determinations of overall program
adequacy, nor are they used to compare or rank state programs.

Each state's programs are reviewed once every five years. The first round of SRF reviews began
in FFY 2004. The third round of reviews began in FFY 2013 and will continue through FFY
2017.

State Review Framework Report | Missouri | Page 60


-------
II. SRF Review Process

Review period: FFY2013
Key dates:

•	Kickoff letter sent to MDNR: December 19, 2013

•	Kickoff meeting conducted: December 13, 2013 via conference calls

•	On-site file review conducted: March 11-13, 2014

•	Draft report sent to state: July 29, 2014

•	Draft report response sent from MDNR to the EPA: September 19, 2014

•	Report finalized: January 15, 2015

State and the EPA key contacts for review:

•	The EPA Region 7 PQR Lead Reviewer: Sunny Wellesley

•	The EPA Region 7 SRF Clean Water Act Lead Reviewer: Seth Draper

•	The EPA Region 7 SRF Coordinator: Kevin Barthol

•	MDNR Water Pollution Control Branch Lead Contact for the review: Paul Dickerson

State Review Framework Report | Missouri | Page 61


-------
III. SRF Findings

Findings represent the EPA's conclusions regarding state performance and are based on findings
made during the data and/or file reviews and may also be informed by:

•	Annual data metric reviews conducted since the state's last SRF review

•	Follow-up conversations with state agency personnel

•	Review of previous SRF reports, Memoranda of Agreement, or other data sources

•	Additional information collected to determine an issue's severity and root causes

There are three categories of findings:

Meets or Exceeds Expectations: The SRF was established to define a base level or floor for
enforcement program performance. This rating describes a situation where the base level is met
and no performance deficiency is identified, or a state performs above national program
expectations.

Area for State Attention: An activity, process, or policy that one or more SRF metrics show as
a minor problem. Where appropriate, the state should correct the issue without additional the
EPA oversight. The EPA may make recommendations to improve performance, but it will not
monitor these recommendations for completion between SRF reviews. These areas are not
highlighted as significant in an executive summary.

Area for State Improvement: An activity, process, or policy that one or more SRF metrics
show as a significant problem that the agency is required to address. Recommendations should
address root causes. These recommendations must have well-defined timelines and milestones
for completion, and the EPA will monitor them for completion between SRF reviews in the SRF
Tracker.

Whenever a metric indicates a major performance issue, the EPA will write up a finding of Area
for State Improvement, regardless of other metric values pertaining to a particular element.

The relevant SRF metrics are listed within each finding. The following information is provided
for each metric:

•	Metric ID Number and Description: The metric's SRF identification number and a
description of what the metric measures.

•	Natl Goal: The national goal, if applicable, of the metric, or the CMS commitment that
the state has made.

•	Natl Avg: The national average across all states, territories, and the District of Columbia.

•	State N: For metrics expressed as percentages, the numerator.

•	State D: The denominator.

•	State % or #: The percentage, or if the metric is expressed as a whole number, the count.

State Review Framework Report | Missouri | Page 62


-------
CWA Element 1

— Data

Finding 1-1

Area for State Improvement

Summary

Missouri did not batch any inspection or enforcement data to ICIS-NPDES
for FFY 2013 and does not consistently batch accurate DMR data.

Explanation

FFY 2013 is the third consecutive year that MDNR did not batch any
compliance monitoring, enforcement, or single event violation data from
Missouri Clean Water Information System (MoCWIS), its state database,
to ICIS-NPDES. MDNR consistently enters this data into MoCWIS,
which was modeled after ICIS-NPDES to ensure that the state can
accommodate all data elements required by the national program.
MoCWIS has been unable to communicate properly with the EPA's
exchange network in order to process data in the compliance monitoring
and enforcement universes prior to storage in ICIS-NPDES. For similar
reasons, the batch routines that MoCWIS uses for DMR data do not result
in all DMR data being consistently and accurately captured in ICIS-
NPDES. MDNR and the EPA agreed to language in the FFY 2013-14
Performance Partnership Grant (PPG) workplan for taking steps to
resolving these challenges. Accordingly, MDNR began to commit
resources in FFY 2013, and the EPA has provided technical assistance to
MDNR.





Relevant metrics

. Irv.. . _ . . Natl Natl State State State
Metric ID Number and Description _ , . „ __ .

Goal Avg N D % or #



lbl Permit limit rate for major facilities >95% 179 179 100%



lb2 DMR entry rate for major facilities >95% 96.10% 5785 6652 87%



2b Files reviewed where data are accurately

reflected in the national data system 0 ' 0

State response	The Department's Water Protection Program is currently working on two

major enhancements, which are Batch 1 and Batch 2 & 3. The Department has
determined that many of the permit data rejections from the EPA's ICIS-
NPDES database are associated with DMRs from permits that have been
modified in the Department's MoCWIS database. The Batch 1 enhancement
will change how Missouri submits permit modifications to ICIS, and resolve
many of the data rejections. Discovering the root cause of these rejections, and
a solution, took a considerable amount of time. Completion of this
enhancement is currently under discussion with OECA. The Batch 2 & 3
project will address submitting compliance monitoring and enforcement data
to ICIS. The Department has an active contract with a third-party software
provider to accomplish this task. The Department had anticipated completion
of this task in FFY 2014, but delays with the third-party provider and

State Review Framework Report | Missouri | Page 63


-------
Department resource constraints has delayed completion of the project. It is
anticipated that this project will be completed during FFY 2015.

Recommendation In accordance with Missouri's PPG workplan for FFY 2013-14, MDNR

should continue to identify necessary data flows from MoCWIS to ICIS-
NPDES to enable complete and accurate batching of DMR, compliance
monitoring, and enforcement data. The EPA will continue to provide
MDNR technical assistance from Headquarters and Region 7 staff.

1.	MDNR should submit to the EPA a timeline of actions that will occur
to correct the batch upload issues. Submit the timeline to the EPA with
the first quarterly update (January 15, April 15, July 15, and October
15).

2.	Report to the EPA at each quarter (January 15, April 15, July 15,
October 15) the progress made to correct the MoCWIS issues.

3.	MDNR should begin to batch all of these elements to ICIS-NPDES by
September 30, 2015 to ensure that data will be complete and accurate,
pursuant to the 1985 PCS Policy Statement and its appendices for
ICIS-NPDES.

When the data is complete, accurate, and being consistently uploaded to
ICIS-NPDES, the EPA will close this recommendation.

State Review Framework Report | Missouri | Page 64


-------
CWA Element 2 — Inspections

Finding 2-1	Meets or Exceeds Expectations

Summary	MDNR completed its inspection targets for NPDES program areas in FFY

2013, with one exception, Major CSO inspections.

Explanation	As summarized in the metrics table below, the number of inspections and

audits that MDNR conducted in FFY 2013 meets or exceeds the number
negotiated in the Compliance Monitoring Strategy (CMS) for all NPDES
program areas except Major CSO inspections.

MDNR has five major CSO facilities. The state typically inspects two
Major CSOs in an inspection season. The state typically inspects all five
Major CSOs every three years.

It appears that MDNR does not have any issue meeting their inspection
commitments. The EPA recommends that the state review its
commitments, completed inspections, and problem areas to determine if
there are sectors where the state resources could be focused.

Relevant metrics . Natl	Natl State State State

Metric ID Number and Description _ ,	. „ __ .

Goal	Avg N D % or #

4al Pretreatment compliance inspections and 0/	<-><-> . ... I0/

lUU/o	12 21 1U4/0

audits

4a2 Significant Industrial User inspections for
SIUs discharging to non-authorized POTWs

100%

11

5

220%

4a4 Major CSO inspections

100%

2

0

0

4a5 SSO inspections

100%

29

25

116%

4a7 Phase I & IIMS4 audits or inspections

100%

10

5

200%

4a8 Industrial stormwater inspections

100%

462

189

244%

4a9 Phase I and II stormwater construction (Land
Disturbance Permitted Sites) inspections

100%

443

394

112%

4a 10 Medium and large NPDES CAFO
inspections

100%

155

133

116%

5al Inspection coverage of NPDES majors



54

178

30%

5b 1 Inspection coverage of NPDES non-majors
with individual permits

100% 24.1%

0

3111

0%

5b2 Inspection coverage of NPDES non-majors
with general permits

100% 6.5%

0

14963

0%

State response The Department completed inspection targets for NPDES program areas in
FFY2013, with one exception, Major Combined Sewer Overflow
inspections. But the Department is still on target to complete these
inspection commitments in the long-term because we only have 5 to
inspect, and schedule to inspect them on a five-year basis. MDNR is

State Review Framework Report | Missouri | Page 65


-------
continually looking at opportunities to focus limited resources and still
meet inspection targets.

Recommendation

State Review Framework Report | Missouri | Page 66


-------
CWA Element 2

Inspections

Mild ill" 2-2

Area for State Improvement

Summary

MDNR inspection reports did not consistently identify pertinent facility



information, compliance issues, and compliance determinations.

Explanation	Compliance determination could be found and followed in 63 of the 69

inspection reports. Overall, the MDNR inspection reports had sufficient
information to determine the facility's compliance.

Although minor in nature, the inspection reports had errors such as
incorrect permit number, facility address missing, facility not fully
described such as number of outfalls present, and missing inspection date.

While inspection reports consistently allowed the EPA reviewers to
determine compliance issues found by MDNR inspectors; the EPA found
that the inspection reports could benefit from increased information. For
example, the Core NPDES inspection reports did not define the facility
layout, process train, and/or number of outfalls present at the facility. The
Land Disturbance Permitted Sites reports did not consistently define which
stormwater BMPs were present.

As CAFOs in Missouri move from NPDES permits to state no discharge
permits, CAFO inspection become the primary mechanism for assuring
these operations comply with the CWA. To insure MDNR maintains the
minimum requirements for an NPDES program, inspection at unpermitted
CAFOs must clearly document whether the facility is discharging manure,
litter or process wastewater

The EPA reviewers also suggest that the addition of aerial facility layouts
with descriptions of notable features would be beneficial for those
reviewing the inspection reports. This seems to be a regression of
practices that at one time were part of MDNR's processes. In March
2012, MDNR reported to the EPA the following information: "On
3/23/2012, MDNR verified that all regional office are on board with the
expectation to complete a CAFO inspection checklist for each CAFO
inspection and also to include an aerial photograph for both CAFO and
WWTP inspections. Satisfaction of these CAFO inspection items
completes the actions still needing to be addressed under this
recommendation. All other items were verified by the EPA to be
incorporated consistently, as revealed by a review of several WWTP and
CAFO inspection reports from late 2011."

State Review Framework Report | Missouri | Page 67


-------
Relevant metrics

Metric ID Number and Description

Natl
Goal

Natl

Avg

State
N

State
D

State
% or #

6a Inspection reports complete and sufficient to
determine compliance at the facility

100%



63

69

91%

State response During review of the EPA's comments, the Department noticed that
inspection staff occasionally coded compliance monitoring activities
incorrectly in MoCWIS; this affected the sample that the EPA reviewed.
For instance, several of the CAFO reports were documenting spill
investigations rather than scheduled compliance inspections. This could
explain some of the "missing" elements documented during the review.
Department staff use a CAFO inspection checklist when conducting
compliance inspections, and includes the checklist with the inspection
report. When conducting response to water pollution emergencies (e.g., a
spill), staff do not use or attach a CAFO inspection checklist. Some of the
inspection reports reviewed by the EPA were associated with spills;
therefore, the report did not include a checklist. Department staff use an
automated reporting system to generate reports. The Department currently
has an internal workgroup updating and standardizing the templates used
by this system for all media (i.e., Water Pollution, Drinking Water, Air,
Hazardous Waste, Solid Waste, etc.) Staff will ensure that the templates
include these required items. The Department will provide staff with a
memorandum reminding staff to include all required information in each
inspection report and enter inspection data into MoCWIS properly. These
items are expected to be completed by March 2015. In addition, the
Department will provide the EPA with a copy of the inspection
memorandum noted above following its completion in March 2015.

Recommendation The EPA recommends MDNR revise their inspection report drafting
process so that basic information regarding the facility is captured. For
inspections at CAFOs operating without an NPDES permit, the EPA
recommends that inspections effectively evaluate and clearly document
whether the facility discharges and is subject to NPDES permitting
regulations.

1.	Submit to the EPA the memorandum to staff identified in the state
response above by April 15, 2015.

2.	Submit to the EPA the revised inspection report templates
(identified in the State Response above) which will be used by the
Water Pollution branch.

When the EPA is satisfied that the inspection report completeness issues
are resolved, the EPA will close this recommendation.

State Review Framework Report | Missouri | Page 68


-------
CWA Element 2

Inspections

Mild ill" 2-3

Area for State Improvement

Summary

MDNR files did not contain any information on how inspection checklist



or field notes were retained.

Explanation	The EPA found that the majority of the inspection reports were narrative in

nature. The checklists used to create the narrative reports were not in the
official file. The inspection checklist and field notes are an essential part of
the evaluation of the facility. It is unclear to the EPA whether the field
inspection checklist and/or field notes were retained by the inspector. The
EPA's Compliance Manual notes: "The field notebook should never leave
the inspector's possession during the inspection. Do not allow a facility to
copy the field notebook. Notebooks become an important part of the
evidence package and are admissible in court. The field notebook is a part
of government records and is not to be considered the inspector's personal
record. Hold notebooks indefinitely pending disposition instructions. There
have been instances, although not frequent, where an inspector needed to
look back at their field notes some 10 to 20 years later for related
enforcement work." The Manual continues: "An inspector may need to
testify in an enforcement proceeding. Therefore, it is imperative that each
inspector keep detailed records of inspections, investigations, samples
collected, and related inspection functions. Types of information that
should be entered into the field notebook include the following"

The EPA reviewed the MDNR Operations Manual to determine whether
the agency has a specified record retention procedure. The manual includes
information on what files to request from the facility but does not state how
the material will be maintained once it is gathered.

Relevant metrics This generally falls under metric 6a

State response The Department responds that field notes and checklists are generated during
inspections and used to prepare the final inspection report. Once the inspection
report is finalized, the field notes and checklists are destroyed. The checklists
mimic the electronic database checklist, which is used to generate automated
reports; therefore, once the data has been transferred from the checklist to the
electronic database, there is no need to retain a paper copy of the checklist.
Likewise, pertinent information contained in the inspection field notes is
wholly incorporated in the final inspection report, which is retained in the
Department's file for the facility; therefore, there is no need to retain paper
copies of field notes. The Department will update the Operations Manual, by
March 2015, to describe how field notes and checklists shall be managed. The

State Review Framework Report | Missouri | Page 69


-------
Department will notify the EPA following completion of revisions to the
Operations Manual, which is expected to occur by March 2015.

Recommendation MDNR should revise their operations manual to include details which
clearly define how field notes are managed.

1. MDNR should submit the revised Operations Manual to the EPA
on April 15, 2015.

Once the field note guidance has been addressed by MDNR and reviewed
by the EPA, the item can be closed.

State Review Framework Report | Missouri | Page 70


-------
CWA Element 2

Inspections

Mild ill" 2-4

Area for State Improvement

Summary	Inspection reports reviewed were not issued within 30 days.

Explanation	The EPA reviewed a total of 69 inspection reports. For FFY13 52% of the

MDNR reports were completed within 30 days. The EPA reviewed 53
inspection reports conducted in FFY13, 10 conducted in FFY12, five in
FFY11, and one in FFY09. The 53 FFY13 inspection reports were
completed on average in 44 days.

The MDNR Operations Manual states:

"The report must be written and transmitted to the facility within 30 days —
the sooner the better since information is easier to recall and organize soon
after the inspection. The primary objective of the inspection report is to
organize all of the information obtained during the inspection process into
a clear and comprehensive report package. General information on
inspection report writing is contained in Appendix A. Consult program-
specific guidance, where available, for automated inspection report forms
that can greatly reduce the time needed to complete the report."

However, the MDNR Operations Manual states regarding Land

Disturbance Sites:

"Completing the Written Report

Due to the nature of construction, the conditions at a land disturbance sites
change rapidly. Equally as important is to realize that the lack of proper
best management practices can cause damage to the environment at the
next rain event. This requires that our inspection activities progress at a
more rapid pace. Written reports for land disturbance sites must be
completed and transmitted to the permittee within 10 business days of the
date of the investigation or inspection. Any enforcement response should
follow the guidance of the Inspection and Enforcement Manual."

MDNR completed four out of ten land disturbance inspections within ten
days. This was noted to be an issue in the FFY09 MDNR SRF.

Relevant metrics

Metric ID Number and Description

Natl
Goal

Natl

Avg

State
N

State
D

State
% or #

6b Inspection reports completed within prescribed
timeframe

100%



32

69

46.4%

State response The Department will update the Operations Manual to provide an SOP for

timelines for issuing inspection reports based on: 1) the type of inspection, 2)
the severity of violations documented during the inspection and 3) the
availability of sample results. The Department will strive to issue all

State Review Framework Report | Missouri | Page 71


-------
inspection reports within thirty days from the date of inspection. If sample
results are not received within this timeframe, the results can be sent under a
separate cover letter upon availability. The Department will develop a report
generated from MoCWIS, by March 2015, to ensure inspection reports are
issued in a timely manner. This report can be used to provide the EPA with
quarterly updates until such time that the ICIS Batch 2 & 3 projects are
complete.

Recommendation 1. MDNR should develop a Standard Operating Procedure which will

implement the timeline goals specified in the Operations Manual by
April 15, 2015.

2. MDNR should report to the EPA on a quarterly basis (January 15,
April 15, July 15, and October 15) the percentage of inspection
reports that have been issued within 30 days.

Once the timeliness issue has been addressed by MDNR and approved by
the EPA, the item can be closed.

State Review Framework Report | Missouri | Page 72


-------
CWA Element 3

Violations

Mild ill" 3-1

Area for State Improvement

Summary

Files reviewed showed MDNR does not consistently or accurately identify



single-event violation(s) as SNC or non-SNC.

Explanation	The review of the violations found in the MDNR inspection reports

identified that MDNR had an issue identifying SNC. The facilities where
inconsistent SNC determinations were found: Sedalia North WWTF
discharge which lead to a fish kill, Little City MHP had no evaluation of
SNC, Kari's Cupboard and Camp had no evaluation of SNC, Columbia
Pretreatment Audit did not specifically identify if issues were SNC, Poplar
Bluff did not receive an SNC evaluation for enforcing unapproved local
limits.

Also, as explained in Element 1-1, MoCWIS is currently being upgraded.
This upgrade will allow MDNR to use SEV codes when compliance issues
are identified.

Relevant metrics

Metric ID Number and Description

Natl
Goal

Natl

Avg

State
N

State
D

State
% or #

7al Number of major facilities with single event
violations





0

178

0%

7dl Major facilities in noncompliance

N/A

64.1%

171

179

95.5%

7fl Non-major facilities in Category 1
noncompliance





78

179

44%

7gl Non-major facilities in Category 2
noncompliance





1473

2840

51%

8a2 Percentage of major facilities in SNC

N/A

26.2%

166

179

92%

8b 1 Single-event violations accurately identified
as SNC or non-SNC

100%



3

8

38%

8c Percentage of SEVs identified as SNC
reported timely at major facilities

100%



1

8

13%

State Review Framework Report | Missouri | Page 73


-------
State response Department inspectors are instructed to evaluate violations using guidance
provided in the Compliance Manual to determine whether or not to issue a
Letter or Warning (LOW) or Notice of Violation (NOV) to a facility. The
follow-up response, or compliance monitoring action (i.e., issuing an LOW
or NOV), is largely dependent upon the severity of the violation and/or the
acute or chronic nature of the violation. Violations determined to be SNC
are issued an NOV unless the permittee has previously been informed of
the violation and is taking reasonable action to resolve the violation. The
Department will update the Compliance Manual and Operations Manual to
require inspectors to specifically label SNC violations as SNC in
inspection reports. These manual updates are expected to be completed by
March 2015. The Department has a current data enhancement project to
add a flag in the MoCWIS database to identify single event violations. This
flag will be transmitted as a single event violation code to ICIS as part of
the data batch projects discussed in the state's response to Finding 1-1. This
enhancement is expected to be completed during FFY 2015. Additionally,
Department staff can currently generate a report from MoCWIS to identify
facilities that have been issued LOWs and NOVs; therefore, staff can
identify facilities that are out of compliance using data already managed by
MoCWIS. Once the MoCWIS enhancement discussed immediately above
is complete, staff will have the capability to generate a report from
MoCWIS that identifies all facilities having violations with single event
violation flags. The Department will notify the EPA following completion
of the manual updates discussed above and single event violation
enhancement in MoCWIS is complete.

Recommendation MDNR staff should include a statement in the inspection reports, data

system, and official file identifying that the violations being assessed are
significant noncompliance of the state's regulations. These SNC
determinations should be entered into MoCWIS so that MDNR personnel
can identify facilities which are out of compliance with environmental
regulations. The SNC determinations should include SEV codes being
entered into MoCWIS/ICIS.

1.	Submit to the EPA by April 15, 2015, the updated operations and
compliance manuals which will result in SNC determinations being
made by inspectors.

2.	MDNR should report to the EPA on a quarterly basis (January 15,
April 15, July 15, and October 15) the steps taken to complete SNC
determinations.

The EPA will consider this item closed once the plan of action is
implemented.

State Review Framework Report | Missouri | Page 74


-------
CWA Element 3

Violations

Mild ill" 3-2

Area for State Improvement

Summary

MDNR pretreatment compliance inspection reports did not consistently



identify and determine the compliance of the inspected facility.

The compliance determinations often identified specific permit issues.
Seven inspection reports did not make an official MDNR determination
about the facility's compliance with their permit or regulations. These
inspection reports most often were Pretreatment inspections.

Explanation

The SRF reviewed eight pretreatment compliance inspections and eight
CIU inspections performed by MDNR. Six of the eight MDNR
pretreatment inspection reports contained information that was
contradictory in nature and/or found compliance issues yet did not
completely evaluate for compliance with the issued permit.

Contradictory information in the inspection report: Poplar Bluff (IU SNC
identification confusion), Joplin (IU not identified as SNC), St. Joseph
(BOD/TSS limit confusion, IUs in SNC yet not reported).

Compliance information not fully evaluated: Columbia (potentially
utilizing unapproved Local Limits, problems with SNC identification),
Poplar Bluff (potentially utilizing unapproved Local Limits), Cape
Girardeau (potentially operating under an unapproved Sewer Use
Ordinance), Lebanon (potentially utilizing unapproved Local Limits,
Copper NPDES permit violations), and Joplin (potentially operating under
an unapproved SUO) Maryville (IUs in SNC yet no record of response).

Relevant metrics

Metric ID Number and Description

Natl
Goal

Natl

Avg

State
N

State
D

State
% or #

7e Inspection reports reviewed that led to an
accurate compliance determination

100%



62

69

90%

State response The Department held a training session on pretreatment regulations and
inspections, including a discussion on determining SNC, during the 2014
Clean Water Regional Office/Central Office Coordination meeting on August
19-21, 2014. Department staff are currently drafting language for the
Operations Manual that will provide guidance to inspectors on conducting and
writing inspection reports for pretreatment inspections. This guidance is
expected to be completed by March 2015. Department staff would be
interested in participating in joint inspections with the EPA. The Department
will notify the EPA following finalization of this guidance document.

State Review Framework Report | Missouri | Page 75


-------
Additionally, the Department would be interested in hosting a training event if
the EPA would be interested in providing pretreatment training. The
Department is agreeable to discussing a capacity building schedule with the
EPA, and this could be developed for FY 2016 since the FY 2015 inspections
have already been scheduled.

Recommendation MDNR staff appear to need additional experience and/or training in

Pretreatment Regulations as applied by Approved Pretreatment Programs.
MDNR inspector's knowledge of pretreatment regulations such as
trainings, presentations, participating in Joint inspections with the EPA, or
any other methods to assist inspectors completing these types of
inspections. The MDNR and the EPA will work to create a capacity
building schedule to create achievement milestones, such as, training
accomplished in 3 months, 10 joint inspections in FFY16, etc., for the
removal of this item.

1.	Submit to the EPA by April 15, 2015, the updated operations and
compliance manuals which will include guidance to inspectors
performing pretreatment compliance inspections.

2.	MDNR should report to the EPA on a quarterly basis (January 15,
April 15, July 15, and October 15) the steps taken to increase
Pretreatment expertise, knowledge, or otherwise build capacity
within MDNR.

Once the EPA is satisfied that state actions have addressed this deficiency,
the EPA will mark this recommendation complete.

State Review Framework Report | Missouri | Page 76


-------
CWA Element 4 —

Enforcement

Finding 4-1

Area for State Improvement

Summary

MDNR's informal and formal enforcement actions do not always bring a
facility back into compliance.

Explanation

The EPA reviewed 63 enforcement actions issued by MDNR in the FFY13
SRF. The majority of these actions resulted in the facility coming back into
compliance. 17 of the 63 actions did not result in the facility coming back
into compliance. Five of the 17 were followed with an additional, often
escalated enforcement action, which resulted in the facility coming into
compliance, such as Emery Creek, Drexel South, Paris Ready Mix, Larry
Long, and Twin Hills Farms. The remaining 12 actions which did not
result in a return to compliance or an escalated enforcement response were
primarily sent to one facility, Great Western Hotel. This facility received at
least ten actions during FFY13. These actions resulted in no change to the
facility's compliance with its issued wastewater permit. Additionally,
MDNR did not respond to Majors in noncompliance in a timely manner.





Relevant metrics

. Irv.. . _ . . Natl Natl State State State
Metric ID Number and Description _ , . „ __ .

Goal Avg N D % or #



9a Percentage of enforcement responses that

return or will return source in violation to 100% 46 63 73%
compliance



10b Enforcement responses reviewed that ,,,
jj . , lUu/o 60 63 yj/o
address violations in an appropriate manner



lOal Major facilities with timely action as

9o/o 1 171 1.2/0

appropriate

State response The Department's escalation policy is provided in the Compliance Manual,
and staff are familiar with this guidance. On Great Western Hotel, the
enforcement actions taken were LOWs for failure to submit complete,
accurate or timely DMRs. Following several unsuccessful attempts through
conference, conciliation and persuasion (i.e., CC&P, which is required by state
statute), the matter was referred to the Water Protection Program's Compliance
and Enforcement Section in March 2013. Following unsuccessful attempts to
resolve violations at the enforcement level, the matter was referred to the
Attorney General's Office in June 2014.) The Department feels that the
escalation policy outlined in the Compliance Manual is appropriate. The
Compliance Manual provides guidance on when to issue LOWs and NOVs,
and when to refer the matter to the Compliance and Enforcement Section or
the Attorney General's Office. The Compliance Manual also allows for some
discretion regarding escalating enforcement due to case-specific.

State Review Framework Report | Missouri | Page 77


-------
circumstances, e.g., if the facility has already initiated corrective actions that
will resolve violations in a reasonable timeframe.

In general, though, the escalation policy is as follows:

1.	First violation -LOW.

2.	Second occurrence of violation -NOV.

3.	Third occurrence of violation, or unsuccessful attempts to resolve the
violations through CC&P within 90-180 days -Enforcement Action
Request.

4.	Unsuccessful attempts to resolve the violations through an out-of court
agreement -Referral to the Attorney General's Office.

The Department will draft a memorandum to regional office staff to remind
them of the escalation policy outlined in the Compliance Manual.

Recommendation MDNR should escalate its enforcement response if a facility is not coming
into compliance.

1. The MDNR should submit memorandum to the regional office staff
(identified in the above State Response) to the EPA by April 15,
2015.

Once the escalation memorandum has been submitted to the EPA and
reviewed, this can consider the item closed.

State Review Framework Report | Missouri | Page 78


-------
CWA Element 4 —

Enforcement

Finding 4-2

Area for State Improvement

Summary

The Missouri Attorney General's Office (AGO) appears to slow the



process of concluding environmental cases.

Explanation	The EPA reviewed four formal enforcement files which were referred to

the AGO; Emery Creek Ranch, Little City MHP, Gravois Bluffs Estates,
and Kari's Cupboard. Two of the facilities, Little City MHP and Gravois
Bluffs Estates, had information in the facility file which indicated the
enforcement action was complete. The remaining files do not contain any
information that indicate that the enforcement action is progressing,
stalled, or settled.

The enforcement case information and timeline:

Emery Creek - MDNR referred case to the AGO in September 2012.

September 2013 AG files for Injunctive Relief and Civil Penalties. No

further information noted after the September 2013 AGO filing.

Little City MHP - MDNR referred to AGO on 11/08/2010. AGO settled

case on September 9, 2013. The case was concluded 1,036 days after the

MDNR referral to the AGO.

Kari's Cupboard - AGO referral in February 2013. No further
information in file as of July 2013.

Gravois Bluffs - MDNR referred the case to the AGO on February 23,
2011. AGO settled the case on November 30, 2012. The case was
concluded 646 days after the MDNR referral to the AGO.

These enforcement actions appear to be significantly delayed in
conclusion of the cases.

Relevant metrics This metric generally fits into 10a

State response Cases in litigation do not lend themselves to quick resolution (i.e., less than
a year or two from referral to execution of a legal resolution). AGO has
experienced an increase in case load as well as a reduction in staff over
recent years, which has affected resolution timeframes, but the AGO feels
that the amount of time spent negotiating settlement and litigating matters
has been appropriate. The Department will request that the AGO develop a
work plan that outlines timeframes for milestones and resolution goals for
referred cases.

State Review Framework Report | Missouri | Page 79


-------
Recommendation 1. The MDNR and AGO should submit a work plan that includes

information on the enforcement timeline and steps taken to
address delays by April 15, 2015.

2. MDNR should submit a quarterly report (January 15, April 15,
July 15, and October 15) to the EPA discussing the actions it is
taking to address the timeliness issues at the AGO.

Once the EPA is satisfied that state actions have addressed this
deficiency, the EPA will mark this recommendation complete.

State Review Framework Report | Missouri | Page 80


-------
CWA Element 5 — Penalties

Finding 5-1	Area for State Improvement

Summary	MDNR initial penalty calculations include gravity, however, economic

benefit is not considered by the state. This is a repeat finding from the
EPA SRF review from FFY09.

Explanation	Three (Brandco Investments, LLC, Little City MHP, and Kari's

Cupboard) of the 13 penalties reviewed considered economic benefit
within the penalty calculation. The MDNR Civil Penalties manual states:
"Civil penalties are an indispensable part of enforcement. Penalties serve
several purposes, including minimizing the effect of violations on human
health and the environment, achieving a swift return to compliance,
removing any economic advantage that might have come about through
violations, and deterring others from similar acts." Additionally, the
MDNR Civil Penalties manual further states: "Each of the environmental
protection statutes contain provisions related to penalties, generally
indicating the violations subject to penalties and the range of penalties
that may be assessed. Some statutes identify factors to be considered in
developing a proposed penalty. These typically include the seriousness
and duration of the violation, the degree of responsibility of the violator,
actions taken by the violator to mitigate the effects of the violation, any
past history of violations, any economic benefit obtained through the
violation, and the ability to pay." If the recommended penalty excludes
an economic benefit component, MDNR's penalty worksheet must
provide a rationale for its exclusion.

Relevant metrics

Metric ID Number and Description

Natl
Goal

Natl

Avg

State
N

State
D

State
% or #

1 la Penalty calculations reviewed that consider
and include gravity and economic benefit

100%



3

13

23%

State response The Department has amended and implemented the penalty matrix

worksheet to expand the discussion on and consideration of economic
benefit. The revisions are based upon 10 CSR 20 3.010(3)(D). Economic
benefit including delayed and avoided costs added to the penalty.
Determination made by the Department using an economic benefit formula
that provides reasonable estimate of the economic benefit. Economic
benefit may be excluded if one of the following occurs:

1.	Economic benefit is insignificant;

2.	Compelling public concerns that would not be served by taking the case
through administrative appeal or circuit court litigation; or

State Review Framework Report | Missouri | Page 81


-------
3. Unlikely Department would be able to recover economic benefit based
in litigation based on the particular case.

Note: The Department completed this task prior to finalization of the SRF
response.

Recommendation In FFY15, the EPA will review the amended penalty matrix worksheets
to determine the economic benefit is being considered by MDNR.

1.	MDNR should submit their completed amended penalty matrix
sheets to the EPA by April 15, 2015.

2.	The MDNR should submit a penalty which includes an economic
benefit evaluation and a penalty where economic benefit has been
excluded to the EPA by April 15, 2015.

Once the EPA is satisfied that state actions have addressed this
deficiency, the EPA will mark this recommendation complete.

State Review Framework Report | Missouri | Page 82


-------
CWA Element 5

Penalties

Mild ill" 5-2

Area for State Improvement

Summary

MDNR's documentation for penalty actions do not document the
difference between proposed and final assessed penalties.

Explanation

The EPA reviewed a total of 13 penalty actions. Two of the 13 penalty
actions were issued without changes to the penalty and thus were not
considered in this metric. Four of the 11 penalty actions were issued by
MDNR with a different penalty amount than the calculated amount in the
file. These were Aurora Grand Meat Co., Sedalia North WWTF, Drexel
South WWTF, and M-D Building Products. MDNR should ensure that
the official file contains a justification for the difference between the
calculated penalty amount and the issued penalty.





Relevant metrics

. Irv.. . _ . . Natl Natl State State State
Metric ID Number and Description _ , _T n.

Goal Avg N D % or #



12a Documentation of the difference between

* *+*i jr i j +• i 100% 7 11 63%
initial and final penalty and rationale





State response

The Department does not routinely issue penalties through unilateral orders;
rather, the Department calculates a civil penalty based on the violations
documented and negotiates the penalty amount paid. The negotiated penalty
amount is included in a negotiated agreement. Department enforcement files
contain correspondence between the Department and the responsible party
documenting any reduction in the penalty calculated. The Department
developed and implemented a new process for enforcement staff to
document reductions in penalty amounts through negotiations. Negotiation
discussions between the case manager, unit chief and section chief are
documented in a memorandum-to-file each time a penalty offer deviates
from the originally calculated and approved penalty. The Department
initiated the reporting protocol prior to finalization of the SRF response.

Recommendation

MDNR should submit an example penalty memorandum-to-file that
documents the penalty deviation as identified in the State Response to
the EPA by April 15, 2015.

Once the files are consistently being amended, the item can be closed.

State Review Framework Report | Missouri | Page 83


-------
CWA Element 5 — Penalties

Finding 5-3

Meets or Exceeds Expectations

Summary

The MDNR documentation consistently documented the penalty
payment information.

Explanation	The EPA reviewed a total of 13 penalty actions. Nine of the 13 penalty

actions required that penalty payments be submitted in FFY13. The only
file reviewed that did not contain penalty payment information was
Brandco Investments, LLC.

Relevant metrics

Metric ID Number and Description

Natl
Goal

Natl

Avg

State
N

State
D

State
% or #

12b Penalties collected

100%



8

9

88%

State response

Recommendation

State Review Framework Report | Missouri | Page 84


-------
Appendix A: SRF File Selection

Files are selected according to a standard protocol using a web-based file selection tool
combined with other protocols when state data is not available in the EPA's national database.
These protocols are designed to provide consistency and transparency to the process.

File Selection Process

The EPA Region 7 followed the File Selection Protocol to select 68 files for the on-site State
Review Framework (SRF) enforcement review. This list includes 66 facility files that were
chosen to be representative of Missouri's NPDES compliance monitoring and enforcement
activity in federal fiscal year 2013 and/or to overlap with the permitting program's selections for
the Permit Quality Review. The remaining 2 of 68 files were chosen as supplemental files to help
the EPA Region 7 better understand whether any potential areas of concern identified via the
Data Metrics Analysis are substantiated. All 68 files and their rationale for selection are listed
below.

The 66 representative files were chosen to provide a cross-section of permit types and, within
each permit type, to represent facilities that were subject to an inspection or an enforcement
action. Altogether, 40 files were selected as representative inspections or audits and 26 as
representative formal or informal enforcement. Facilities were also chosen to represent the
variety of compliance history information in the national program database and to ensure roughly
even representation of MDNR's five regional offices.

The choice of particular facilities within each representative category was made as random as
possible using the activity lists provided by MDNR. Because Missouri's inspection and
enforcement activities in FFY 2013 are not present in the national program database, the EPA
was unable to use the Enforcement and Compliance History Online (ECHO) SRF File Selection
Tool but instead used random number generators and sorting of facilities on spreadsheets to
minimize bias in the selection of facilities from each category. The 2 supplemental files were
selected to enable the EPA Region 7 to better understand the nature of 2 potential concerns
identified in the Data Metric Analysis. The 2 potential concerns are metric 7fl - Non-major
facilities in category 1 noncompliance; and metric 8al - Major facilities in SNC.

For all representative file selections, the EPA Region 7 plans to review all compliance
monitoring and enforcement information that is present in MDNR's records. For example, if an
inspection file has an enforcement action associated with it, both activities will be reviewed (and
vice-versa when a selected enforcement action has an associated inspection record). The time
period of interest is FFY 2013, but if the activity for which a facility was selected has an
associated activity dated prior to or subsequent to this period of interest, the EPA Region 7 will
review the associated activity as well.

State Review Framework Report | Missouri | Page 85


-------
File Review List for Missouri SRF Enforcement Review, CWA FY2013

Permit #

Facility Name

Reeional
Office

Selection Rationale



Core Program - Majors





M00023213

Dexter East Lagoon

SER

Representative Enforcement
(abatement order on consent)

M00023027

Sedalia North WWTF

KCR

Representative Enforcement
(abatement order on consent)

M00039659

Eureka WWTF

SLR

Representative Inspection

M00040843

Marslifield WWTF

SWR

Representative Inspection

M00105732

Noranda Aluminum, Inc.

NER

Representative Inspection

M00036773

Simmons Foods, Inc.

SWR

Supplemental - majors in
significant noncompliance



Core Program - Minors







Aurora Grand Meat Co.

SWR

Representative Enforcement
(consent judgment)

M00088072

Brandco Investments, LLC

SER

Representative Enforcement
(abatement order on consent)

M00023663

Drexel South WWTF

KCR

Representative Enforcement
(abatement order on consent)

M00044881

Peaceful Acres

SLR

Representative Enforcement
(administrative order)

M00057363

Little City MHP

NER

Representative Enforcement
(consent judgment)

MO0133833

Kari's Cupboard and Camp

SWR

Representative Enforcement (AGO
referral)

M00053708

Lake Adelle Sewer District

SLR

Representative Enforcement
(NOV)

MOO 114049

Mike's Total

NER

Representative Enforcement
(NOV)

M00101788

Nestle Purina Petcare Co.

SER

Representative Enforcement
(NOV)

MOO 106020

Snow Creek Ski Resort

KCR

Representative Enforcement
(NOV)

M00085952

BCSD, Sheridan Hill Subdivision

NER

Representative Inspection

MO0134112

The Boulders

SWR

Representative Inspection

M00021423

Gideon WWTF

SER

Representative Inspection

MOO 108758

Great Western Motel WWTF

KCR

Representative Inspection

MO0134147

JCSD, Mirasol WWTF

SLR

Representative Inspection

M00099431

Potosi WWTF #1

SER

Representative SSO Inspection

MO0134791

Emory Creek Ranch Phases 3-4-5 WWTF

SWR

Supplemental - non-majors in
Category 1 noncompliance



Pretreatment





CIU000011

Bob Monnig Industries

NER

Inspection of Pretreatment Industry
CIU

CIU000023

Cerro Flow Products, Inc.

NER

Inspection of Pretreatment Industry
CIU

CIU000032

Advanced Industries, Inc. - Kelly St.

KCR

Inspection of Pretreatment Industry
CIU

State Review Framework Report | Missouri | Page 86


-------
CIU000033

Thorco Industries, Inc. at Butler

KCR

Inspection of Pretreatment Industry
CIU

CIU000025

Gates Corporation

SWR

Pretreatment Municipal Inspection

CIU000002

Scroll Compressors, LLC

SWR

Pretreatment Municipal Inspection

CIU000021

Tracker Marine - Ozark

SWR

Pretreatment Municipal Inspection

M00094846

Jefferson City Water Reclamation

NER

Pretreatment Municipal Inspection

M00097837

Columbia Regional WWTP

NER

Pretreatment Municipal Audit

M00043648

Poplar Bluff Municipal WWTP

SER

Pretreatment Audit

M00050580

Cape Girardeau Municipal WWTF

SER

Pretreatment Municipal Inspection

M00089010

Lebanon WWTF

SWR

Pretreatment Audit

M00103349

Joplin Turkey Creek WWTF

SWR

Pretreatment Municipal Inspection

M00023043

St. Joseph Water Protection Facility

KCR

Pretreatment Municipal Inspection

M00033286

Maryville WWTF

KCR

Pretreatment Municipal Audit

M00101702

Exide Tech - Canon Hollow

KCR

Inspection of Pretreatment Industry
CIU



CAFOs





MOO 119962

Sharpe Holdings

NER

Representative Enforcement
(penalty order)



Twin Hills Farms

SWR

Representative Enforcement
(administrative order)

MOGS10175

Jeffrey Miller Broilers

KCR

Representative Enforcement
(LOW)

MOGO10504

Larry Long

SWR

Representative Enforcement
(LOW)

MOGO10451

Danny Bevill

NER

Representative Inspection

MOGS10063

Deppe Farms, Inc.

SLR

Representative Inspection

MOGO 10227

Ponderosa, LLC

KCR

Representative Inspection

MOG010339

Roger Schnake

SWR

Representative Inspection

MOGS 10407

Turkey Hill

NER

Representative Inspection



MS4





MOR040070

Calloway County MS4

NER

Representative Inspection

MOR040027

Poplar Bluff MS4

SER

Representative Inspection



Stormwater- Land Disturbance
Permitted Sites





MOR10A196

Gravois Bluffs Estates

SLR

Representative Enforcement
(penalty order)

MORA01168

Lake Van Loo Estates

NER

Representative Enforcement
(LOW)

MORA00503

West Elementary School

KCR

Representative Enforcement
(NOV)

MORA00283

Chesterfield Blue Valley

SLR

Representative Inspection

MORA00190

Emerald Lake

NER

Representative Inspection

MORA00353

Project Fres

KCR

Representative Inspection

MORA02213

Southern Hills Shopping Center

SER

Representative Inspection



Stormwater - Industrial





MOR240266

Lincoln County Fanners Coop

SLR

Representative Enforcement
(abatement order on consent)

MOR203205

M-D Bldg Products

SER

Representative Enforcement (AOC
and penalty)

MOR60A146

Shapiro Brothers, Inc.

SLR

Representative Enforcement
(tolling agreement)

State Review Framework Report | Missouri | Page 87


-------
MOO 129224

AFB International

SWR

Representative Enforcement (LOW
& NOV)

MOR22C023

F&S Pallet, Inc.

KCR

Representative Enforcement (LOW
& NOV)

MOG490926

Sedalia North WWTF

KCR

Representative Enforcement
(LOW)



MoDOT Lamar Maintenance Facility

SWR

Representative Enforcement
(NOV)

MOR130033

International Paper

KCR

Representative Inspection

MOG491065

Paris Ready Mix

NER

Representative Inspection

MOR22A020

Stanton Manufacturing

SWR

Representative Inspection

MOR80C214

UPS Sikeston

SER

Representative Inspection

State Review Framework Report | Missouri | Page 88


-------
Appendix B: MDNR Compliance and Enforcement Program Overview

[Note: The information below is extracted from MDNR's external website at
http://www.dnr.mo.gOv/env/wpp/enf/index.html.1

Missouri's natural resources provide for our health, well being and enjoyment. Making sure Missouri's citizens,
communities and enterprises comply with the legally required enviromnental protection measures is the least each of
us can do to help sustain ourselves and our neighbors. The enviromnent we live in today and leave to our children
should be the best we can make it.

Department staff are expected to work cooperatively with anyone who lias an enviromnental problem or concern
throughout the process of solving it. The department is always available to offer services up front to prevent
problems. Where problems occur, the department will work with the parties involved to resolve the problems as
quickly and productively as possible.

There are several purposes served by the department's compliance and enforcement role. The primary role is to
achieve regulatory compliance with enviromnental laws. At a minimum, this protects human health and the
environment. It also supports economic development opportunities and the quality of life in Missouri.

If a problem persists, the department must resort to stronger means to address it. Any problem that is not solved
must be quickly elevated to the next stage so that threats to citizens' health and Missouri resources are addressed
promptly. Staff are directed to use the full range of compliance tools to solve enviromnental problems and address as
many aspects of the problem as possible. Since the department has limited resources, compliance and enforcement
work also performs the important function of deterring noncompliance. Compliance and enforcement actions ensure
a level playing field for those dealing with pollutants and contaminants - no one should make a profit at the expense
of the health and resources of Missouri citizens.

Department staff follow a compliance manual for all enforcement actions. The department's regional office staff
follow an operation manual to conduct inspections and begin investigations.

Missouri State Operating Permit, or National Pollutant Discharge Elimination System

The Missouri Department of Natural Resources requires a permit for all facilities that discharge or have the potential
to discharge to waters of the state. If the department finds a facility operating without a permit, the department will
take necessary action against the facility to obtain the necessary permit and bring the facility back into compliance.

Enforcing the Missouri Clean Water Law


-------
The department's primary compliance and enforcement responsibility and statutory obligation is to work with a
facility to achieve compliance. The facility must ensure a sustainable solution is in place so the facility will reach
and remain in compliance and thereby ensure protection of the environment. Approximately 90 percent of the
department's enforcement actions are resolved informally through conference, conciliation and persuasion, which is
a statutory process for handling noncompliance.

Conference, conciliation and persuasion consist of verbal or written communications between authorized
representatives of the department and a party in violation. Conference, conciliation and persuasion is a central
concept in achieving compliance and is required by several state environmental laws. Department staff can use this
concept any time non-acute violations are detected. The purpose is to encourage prompt correction of violations in a
productive way. A formal enforcement action must be taken if the violations are not promptly corrected.

Conference, conciliation and persuasion also provides opportunities to handle enforcement cases through informal
methods and strives to resolve any finding of noncompliance with statutes, rules, permits or other enforceable
provisions.

Conference, conciliation and persuasion is a focused and time limited process that will not exceed 90 days to correct
the violation and is neither required nor appropriate if the violations:

•	Represent an imminent and serious threat to human health, public welfare or the environment;

•	Appear to be intentional or result from negligence or are otherwise criminal; or

•	Have a required response specified in rule or guidance.

Enforcement Actions

In cases where the violations are not resolved through conference, conciliation, and persuasion, the department may
use formal enforcement actions to obtain compliance, including but not limited to Settlement Agreements,
Abatement Orders, Abatement Orders on Consent, Consent Judgments and Court Orders. These agreements include
the negotiated actions and a schedule for the responsible party to achieve compliance at the facility or site and pay
any civil penalty or damage amounts assessed for the violations. The department also has the option to refer a case
the Attorney General's Office to represent the department in legal action against a responsible party to obtain a court
order requiring compliance. Referral to the Attorney General's Office can occur when:

•	The responsible party and the department are unable to reach an agreement to correct the violations.

•	The responsible party fails to comply with a formal enforcement action initiated by the department.

•	The violations are an imminent and serious threat to human health, public welfare or the environment.

Formal Enforcement Actions

Page 90 of 134


-------
Descriptions of Formal Enforcement Actions

Abatement Order on Consent - is a negotiated administrative or abatement order between a responsible party and
the department that resolves past violations and establishes a schedule to correct violations. The effective date of an
abatement order on consent is the date the department signs the document. They are not appealable. Failure to
comply with the requirements of an consent can result in the payment of stipulated penalties and referral to the
Missouri Attorney General' Office to pursue legal action against the responsible party in circuit court.

Abatement Order- is a unilateral order issued by the department requiring a responsible party to take action to
correct violations. A responsible party may appeal an abatement order to the Administrative Hearing Commission
within 30 days. If an appeal is not filed, the abatement order becomes final and fully enforceable. Failure to comply
with the requirements of an abatement order can result in the payment of stipulated penalties and referral to the
Missouri Attorney General' Office to pursue legal action against the responsible party in circuit court.

Settlement Agreement - is a negotiated agreement between a responsible party and the department and the Attorney
General's Office that resolves past violations and establishes schedule to correct the violations. Failure to comply
with the requirements of a settlement agreement can result in the payment of stipulated penalties and referral to the
Missouri Attorney General' Office to pursue legal action against the responsible party in circuit court.

Consent Judgment - is a negotiated court order between a responsible party, the Attorney General's Office and the
department resolving past violations alleged in a petition and establishes a court enforceable schedule to correct the
violations.

Judgment or Order - After a case has been filed and litigated through a final hearing, a judge may issue a judgment
or order in the case. The judgment or order may contain injunctive relief and civil penalties. Because the violator did
not agree to the judgment or order, the violator can appeal it to a court of appeals. A federal consent decree is form
of a final order.

Links to lists of the Water Protection Program's active enforcement cases can be found on MDNR's internet site.
The list includes the operating permit number, the facility name, the owner and indicates if the case has been
referred to the Attorney General's Office. These lists are updated monthly and are organized by facility name and by
county for a more accessible search.

Links to the Water Protection Program's recent enforcement actions can also be found on MDNR's internet site.
These reports provide an overall view of the department's enforcement actions achieved during a month timeframe.
Such actions include the number of enforcement cases received from the regional offices, number of cases resolved,

Page 91 of 134


-------
number and description of agreements reached, and number of cases referred to the Attorney General's Office with
corresponding litigation actions.

Page 92 of 134


-------
Appendix C: File Review Summaries for the SRF Review

Core Program

Emery Creek Ranch (MO0134791)

Inspection date(s) and # days to report: 4/17/13 (44)

Inspection notes: The inspector wrote in bold type in the inspection report that "Every DMR
submitted to this office from 9/11 through 3/13 reflects noncompliance for the exceedance of
ammonia as N " The inspection report also states the January and February 2013 DMRs were
unsigned.

Enforcement action date(s): The inspection report was transmitted on 5/31/13 with a LOW. The
LOW, in addition to the violations cited in the previous paragraph notes that trees and woody
vegetation were present at the facility and the absence of a sign notifying the public that the
facility is a WWTF.

Enforcement action notes: The AG filed a Motion for Injunctive Relief and Civil Penalties. The
Defendant did not file an answer. The AG filed for a default judgment against the Defendant.
The file also contains an affidavit from the inspector.

Other notes: The most recent document in the file is dated in September 2013. It is not possible
to know the current status of the actions and/or the compliance status of the facility.

Dexter East Lagoon (M00023213)

Inspection date(s) and # of days to report:

January 21, 2010 (28)

July 14, 2011 (50)

November 13, 2013 (56)

Inspection notes:

January 21, 2010

The facility address is missing from the inspection report. The permit status is not listed in the
inspection report. The inspector did not include a narrative description of their field activities.
The inspection checklist was not found in the electronic files. The data checklist does not
indicate that the facility received a NOV from the EPA on 07/24/2009. Bradley K. Ledbetter did
not sign and approve the inspection report. The inspection report does not ask for items to be
corrected. The MDNR stated: "It is recommended that the City continue its efforts in fine tuning
the new system to bring the facility into compliance. Despite the compliance issues associated
with the East Lagoon, both of the City's wastewater treatment lagoons appear to be well
maintained."

July 14,2011

Inspection report was issued 50 days after the inspection, missing the 30 day deadline. The 2010
inspection report identified that SSOs were an issue for the City. The inspection report did not
report the facility's SSO information to determine if they were still an issue. Ammonia limit
permit requirements still an issue for the facility.

November 13, 2013

Inspection report was issued 56 days after the inspection, missing the 30 day deadline. The 2013
inspection report identifies that the facility has installed upgrades to the facility and is receiving
an activated sludge from a similar facility. However, the facility continues to exceed its permit
limits for ammonia.

Page 93 of 134


-------
Enforcement action date(s):

NOV- July 16, 2010; December 21, 2010; September 2, 2011
ACO-March 25,2013
Enforcement action notes:

An NOV followed the January 21, 2010 inspection report on July 16, 2010. The NOV was issued
147 days after the inspection report was sent to the facility on February 19, 2010. The facility has
not met ammonia limits in the years it has discharged. MDNR mentions that the facility is in
significant noncompliance in one NOV dated July 16, 2010. The facility has needed extensions
to meet the ACO. The facility is now on its fourth extension. The ACO does not define economic
benefit. The file does not contain any information to identifying that the penalty was suspended
two years.

Other Notes:

Noranda Aluminum, Inc. (M00105732)

Inspection date(s) and # days to report: May 1, 2013 (8)

Inspection notes: The facility address is not defined in the inspection report. The inspector does
not provide a general description of the facility. The inspector does not define which pertinent
regulations will be evaluated for compliance with the facility's permit. The inspector does not
define the number of outfalls present for the facility; however, inspector visits Outfalls 001-006.
The facility's stormwater drains to Outfall 004. The inspector was not able to reach Outfall 004
to what appears to be a flood event. The pond berms appear to be very near the river and the
outfall is under water. The inspection report identifies that samples were taken, yet not available
at the time of submission to the facility. Unknown if a checklist is used in an inspection.
Enforcement action date(s):

Enforcement action notes:

Other notes:

BCSD Sharidan Hills Subdivision (M00085952)

Inspection date(s) and # days to report:

September 26, 2012 (54)

March 22, 2013 (67)

Inspection notes:

The FFY13 inspection found nearly identical compliance issues to the inspection that was
performed in FFY12. The facility discharged in violation of their permit and caused impairment
to a state waterbody. The state required the facility to respond by July 28, 2013. MDNR lab
chain of custody did not define the date and time the sample was analyzed to determine if
holding times were met. Presence of blood worms within the discharge pathway indicates
chronic sludge issues with the discharge. No escalation of the violations could be found in the
electronic record.

Enforcement action date(s):

Enforcement action notes:

Other notes:

Peaceful Acres Investments, LLC (M00044881)

Inspection date(s) and # days to report: December 5, 2012 (56)

Page 94 of 134


-------
Inspection notes: Inspector does not define how many outfalls are utilized by the facility. This
does not allow the auditor to determine if all of the outfalls have been inspected. An overview
description of the facility would be useful to show the entire facility, allowing a reviewer the
opportunity to determine if the entire facility was inspected. The inspection report was not issued
in 30 days.

Enforcement action date(s):

LOW- January 30, 2013
ACO-August 19, 2013
Enforcement action notes:

The LOW was issued with the inspection report 56 days after identifying the issues in the
inspection. The AO was issued 201 days after the facility had not come into compliance with the
LOW/Inspection Report. The ACO states that the facility installed a chlorination system onto the
facility. The inspection report does not mention this addition. The LOW does not mention this
addition. The electronic file does not identify this discovery.

Other notes:

Lake Adele Sewer District (M00053708)

Inspection date(s) and # days to report: January 7, 2013 (28)

Inspection notes: Inspector notes that the facility had not submitted its Sludge Report per the
permit by April 22, 2011.

Enforcement action date(s): LOW - February 5, 2013

The LOW states that the facility did not submit the Sludge Report due by April 22, 2011. The
facility replied on March 8, 2013 that the report was submitted to the SLRO on December 6,
2012. The SLRO responded on March 28, 2013 stating that the LOW is considered resolved and
the facility is in compliance. The SLRO office does not mention that the facility's Sludge Report
is 594 days late. There is no information in the file to determine if SLRO granted a time
extension for the sludge report.

Enforcement action notes:

Other notes:

Nestle Purina Petcare Co (M00101788)

Inspection date(s) and # days to report:

Inspection notes:

Enforcement action date(s):

LOW- November 19, 2012
NOV- January 21, 2013
Enforcement action notes:

The facility was issued an LOW (11/19/12) and an NOV (11/21/13) for two consecutive TSS
violations that occurred on 9/30/12 and 10/30/12. The 2013 NOV also identified that the facility
did not submit their DMR for the 4th Quarter sampling for Outfall #002. Many warning letters
were found within the official file.

Other notes:

MoCWIS is currently being developed so that the system can batch upload to ICIS. At the time
of the SRF, the batch uploading process was not complete. As a result, the ECHO reports are not
accurate to the state database.

Page 95 of 134


-------
Snow Creek Ski Resort (M00106020)

Inspection date(s) and # days to report:

Inspection notes:

Enforcement action date(s):

LOW- December 12,2012
Enforcement action notes:

The LOW required the facility to submit the missing DMRs from August and September 2012.
The facility was issued a reminder letter on December 11, 2012 to submit the missing August
2012 DMR. MDNR issued a LOW on December 12, 2012 informing the facility that the August
2012 and September 2012 DMRs were missing; 72 days after the violation. The facility
submitted their missing DMRs on December 17, 2012. MDNR issued the facility a reminder
notice on April 25, 2013 to inform the facility that their Status/Progress Report had not been
submitted. The facility report at the time of the reminder letter the report is 90 days late. This
letter granted the facility an extension for submission of the report until May 22, 2013. This
extension allows the facility to submit the report 117 days past their permit milestone of January
25, 2013.

Other notes:

Gideon WWTF (M00021423)

Inspection date(s) and # days to report: January 9, 2013 (8)

Inspection notes:

The facility is a non-discharging lagoon. The lagoon uses a center pivot to land apply to 76 acres.
The inspection does not indicate if records were reviewed during the inspection.

Enforcement action date(s):

Enforcement action notes:

Other notes:

Great Western Hotel WWTF (M00108758)

Inspection date(s) and # days to report:

November 19, 2012 (99)

April 11, 2013 (44)

Inspection notes:

Inspection reports were very detailed. Inspectors evaluated all areas of the facility including
identifying the areas that were beyond the lagoon cells.

Enforcement action date(s):

February - December 2012 ".. .at least fifty (50) Letters of Warning have been issued to Great

Western Hotel for failure to submit timely and complete DMRs."

NOV-May 25, 2012

CC&P-July5, 2012

LOW-July 12,2012

NOV - February 28, 2013

NOV-April 4, 2013

NOV-April 4, 2013

NOV-April 4, 2013

NOV-April 4, 2013

NOV-April 4, 2013

Page 96 of 134


-------
NOV-April 4, 2013
NOV-April 4, 2013
NOV-May 16, 2013
LOW-April 11, 2013
Enforcement action notes:

The facility entered into settlement agreement with MDNR on April 21, 1999. The facility was
required to correct its deficiencies. The correction of the deficiencies would result in a $1,000
penalty and $12,000 suspension of the penalty. The facility appeared to be in compliance until
June 13, 2007. At the time of the FFY13 SRF, the facility has now received greater than 50
LOWs. The LOWs and NOVs the facility has received identify identical compliance issues. The
facility has made little to no attempt to correct the compliance issues identified in two
inspections which resulted in two NOVs. The facility also received an additional nine
enforcement actions due to non-submittals of DMRs and DMR exceedances. The facility is
consistently in noncompliance. The MDNR issued the initial NOV 44 days after the November
19, 2012 inspection. The July 12, 2012 LOW was issued to the facility 174 days February 2012-
May 2012 DMRs were not submitted. MDNR issued the February 28, 2012 NOV 101 days after
the inspection. MDNR issued the nine April 4, 2013 NOVs to the facility for non-submittals of
DMRs and DMR deficiencies. These submittals to the facility are for the following violations
and response times by MDNR.	

DMR Deficiency

DMR Month

NOV Issuance

MDNR Response
Time

Non-submittal

March 2012

April 4, 2013

368 days

Non-submittal

October 2012

April 4, 2013

154 days

Non-submittal

December 2012

April 4, 2013

93 days

DMR Parameters not
Reported
- Flow

February 2012

April 4, 2013

372 days

-	Temperature

-	Ammonia as N







DMR Parameters not

April 2012

April 4, 2013

311 days

Reported
- Flow







-	Temperature

-	Ammonia as N







DMR Parameters not

May 2012

April 4, 2013

280 days

Reported
- Flow







-	Temperature

-	Ammonia as N







DMR Parameters not

June 2012

April 4, 2013

250 days

Reported
- Flow







-	Temperature

-	Ammonia as N







DMR Parameters not
Reported

September 2012

April 4, 2013

158 days

Page 97 of 134


-------
-	Flow

-	Temperature

-	Ammonia as N







DMR Parameters not
Reported

-	Flow

-	Temperature

-	Ammonia as N

January 2013

April 4, 2013

35 days

An LOW was submitted to the facility on April 11, 2013 for not submitting their annual payment
of the permit fee. This was issued to the facility 59 days after the permit fee was not submitted.
MDNR issued an NOV to the facility on May 16, 2013 as a response to the facility not

submitting their annual permit payment. This payment was due on February 17, 2013. The NOV
was issued 89 days after the permit fee was not submitted. MDNR has begun penalty
calculations and economic benefit is considered. These penalty calculations are being completed
in FFY14.

Other notes:

The Boulders (MO0134112)

Inspection date(s) and # days to report: November 21. 2012 (8)

Inspection notes:

Inspection was thoroughly explained so that a reviewer could easily piece together the process

and scope of the inspection. No compliance issues were found.

Enforcement action date(s):

Enforcement action notes:

Other notes:

Aurora Grand Meat Co. (unpermitted)

Inspection date(s) and # days to report: 8/22/2012 (29 days); 6/11/2013 (62 days)

Inspection notes: MDNR first inspected Aurora Grand Meat Co. (AGMC) and detected
noncompliance in April 2010 and conducted a follow-up inspection with issuance of an NOV in
June 2010. This sequence of inspections, which the EPA did not review against the Inspection
File checklist, culminated with the settlement agreement described below. The 8/22/2012
inspection confirmed that AGMC had not completed the requirements of the Schedule of
Compliance in the settlement agreement and also failed to remit payment of suspended penalties
under the terms of the agreement. Finally, MDNR conducted an investigation of an
environmental concern on 6/11/2013 based on allegations of a septic, failing lagoon. The
inspection report stated that the facility has been in noncompliance since 2010 despite that a new
consent judgment was signed in 2012. Both inspection reports were conveyed with NOVs, but
the latter NOV did not articulate what MDNR expected the facility to correct.

Enforcement action datefs): 10/23/2012 (LOW), 7/10/2013 (LOW); 11/8/2012 (Consent
Judgment)

Enforcement action notes: Both LOWs required a response from the facility within 10 days, but
no response was obtained. MDNR originally signed a settlement agreement with AGMC in
February 2011 for failure to properly operate a lagoon system. Because no recourse was
achieved through this action, MDNR proceeded to refer the matter to the state Attorney General
approximately August 2012, the time of the former post-settlement agreement inspection. This

Page 98 of 134


-------
constitutes a prompt referral of the matter. A consent judgment was issued promptly on
11/8/2012, ordering the facility to design, get permitting for, and complete construction of a
process wastewater holding system and land application structure; and to close the original
lagoons. It also ordered payment of a $3,000 penalty by 12/8/2012, with an additional $2,000
held in suspension for 2 years. As of the date of this program review, AGMC was in contempt of
court for having failed to complete any of the items in the consent judgment.

Other notes: Because the state AG issued the consent judgment, MDNR did not get any records
on determination of the penalty.

Brandco Investments, LLC (M00088072)

Inspection date(s) and # days to report: 5/9/2012 (34 days)

Inspection notes: MDNR sent an inspection report with NOV to the facility on 6/12/2012
following the 5/9/2012 inspection. It was a well-documented inspection report, with the
exception that it excluded previous instances of noncompliance that were outstanding at the time
of inspection.

Enforcement action datefs): 6/12/2012 (NOV); 10/2/2012 (referral toMDNR-WPP); 12/26/2012
(litigation request)

Enforcement action notes: The NOV following the May inspection identified two violations in
the NOV: The facility had not completed its permit compliance schedule for installing
disinfection and failed to submit a permit renewal application by the due date almost one year
earlier. The NOV appropriately identified these deficiencies as "serious violations" according to
state Compliance Manual guidance. The WPP litigation request cited four categories of
violations: 1) an SSO three months earlier; 2) failure to abide by the disinfection schedule of
compliance in the permit, which called for a final compliance date of December 2011; 3) absence
of a certified operator; and 4) failure to submit a permit renewal application almost one year
earlier. It was a timely enforcement response for the first of these violations but lagged the state's
date of becoming aware of the latter three violations by margins of 180 days, two years, and
nearly one year, respectively. The penalty calculation accounted for both gravity and economic
benefit, including a robust consideration of avoided cost categories. As a litigation request, this
action did not lead to any documentation in the state's files regarding negotiation and collection
of penalties.

Other notes: None

Sedalia North WWTF (M00023027)

Inspection datefs) and # days to report: 12/30/2011 (54 days)

Inspection notes: MDNR conducted a fish kill investigation, determining that the cause of the
kill on 12/28 was an SSO or sewage discharged from a wastewater outfall. The inspection report
included all the items on the EPA inspection file checklist except information on the permit
status of the facility.

Enforcement action datefs): 2/22/2012 (NOV); 6/13/2013 (Abatement Order on Consent)
Enforcement action notes: The NOV was transmitted to the City with the investigation report. It
cited the unauthorized discharge and required a response from the City. On 7/12/2012, MDNR
initiated negotiations with the City on an appropriate penalty and sent a draft AOC on 3/20/2013,
with a request for a response by 4/20/2013. The AOC requires the City to pay a penalty of
$1,000 plus state investigative costs and to report on its progress or completion of a SEP by

Page 99 of 134


-------
6/13/2014. The City is required to spend at least $31,183 on the stream cleanup and restoration
SEP.

Other notes: Fish kill was SNC but MDNR did not call it out as such.

Drexel South WWTF (M00023663)0

Inspection date(s) and # days to report: 3/23/2012 (96 days)

Inspection notes: MDNR conducted a complaint investigation. The investigation report did not
have a date and lacked information on the permit status of the facility, but it included the other
items on the EPA inspection file checklist.

Enforcement action date(s): 6/27/2012 (NOV); 6/13/2013 (Abatement Order on Consent)
Enforcement action notes: MDNR began using CC&P and informal enforcement tools to address
effluent limit exceedances in June 2011. Two NOVs in March 2012 addressed discharges from
an unpermitted outfall, operation and maintenance failures, pollution to waters of the state, and
sampling deficiencies. The 6/27/2012 NOV accompanied the report for the 3/23/2012 complaint
investigation, citing discharges from a constructed bypass, overtopping of a berm at the WWTF,
and non-operational aerators. That NOV also cited BOD and TSS violations from November
2010 through July 2012. It did not ask for any corrective actions by the facility, although the
investigation report body did so. A referral for enforcement from the Kansas City Regional
Office to MDNR-WPP immediately preceded this NOV on 5/11/2012 and was succeeded by an
internal enforcement recommendation on 10/23/2012. While some of the violations were
addressed in a timely manner according to MDNR's Compliance Manual, others were not. The
escalation sequence was appropriate, if not timely. The AOC required several categories of
injunctive relief and payment of a $2,500 civil penalty with suspension of an additional $7,500
for two years contingent on compliance with the AOC.

Other notes: About one year from becoming aware of ongoing effluent hits to enforcement
referral; another lyr + lmo from referral to order.

Eureka WWTF (M00039659)

Inspection date(s) and # days to report: 12/19/2012 (20 days)

Inspection notes: The report for this inspection accounted for all the items on the EPA's
Inspection File Checklist and was transmitted to the facility 20 days following the inspection.
Eureka is a major facility, but the violations identified in the report do not rise to the level of
SNC according to state or federal definitions.

Enforcement action date(s): 1/8/2013 (LOW)

Enforcement action notes: MDNR sent an LOW to the facility with the inspection report.
Violations identified by the LOW include failure to mark an outfall and to provide potable water
to facility staff. The LOW required a response from the facility within 30 days, and the state's
file for the facility included a letter responsive to the LOW.

Other notes: None

Simmons Foods (M00036773)

Inspection date(s) and # days to report: 5/14/2013 (63 days)

Inspection notes: MDNR conducted a wastewater inspection at Simmons Foods. The body of the
inspection report identified the following violations: a bypass that did not cause water quality
problems, deficient laboratory procedures, and chain of custody shortcomings. The cover letter
for the report requested a written response from the facility by 7/31/2013, but the letter did not

Page 100 of 134


-------
articulate whether violations had been found during the inspection. Items on the EPA's
Inspection File Checklist that were missing from this inspection report include the facility
address, permit status, a description of permit requirements evaluated against, and a clear
compliance determination.

Enforcement action date(s): None
Enforcement action notes: None

Other notes: MDNR used CC&P to obtain resolution to these violations. According to the state's
Compliance Manual, no type of formal or informal enforcement was warranted for these
violation types. Although the cover letter to the inspection report was not labeled as an LOW or
NOV and did not clearly identify any violations, it did refer the facility to the inspection report
and requested a response within two and one-half months.

Accurate SNC determination

Marshfield WWTF (M00040843)

Inspection date(s) and # days to report: 11/1/2012 (104 days)

Inspection notes: The state's inspection of Marshfield led to a report that included most of the
items on the EPA's Inspection File Checklist, with the exclusion of permit status information,
results from sample analyses, and the report writer's signature. The inspection report generated a
clear determination that the facility was out of compliance.

Enforcement action date(s): 1/11/2013 and 2/13/2013 (LOWs)

Enforcement action notes: MDNR sent the first of these LOWs to address a pH exceedance in
October 2012, requiring a written response from the facility within 15 days of receipt. The City
responded accordingly. The second LOW served as an inspection report transmittal for the
November inspection and identified the City's failure to re-evaluate local limits according to the
permit Schedule of Compliance. The LOW required the City to contact the state pretreatment
coordinator by April 2013 for discussion of the matter and to complete the local limits re-
evaluation by 8/1/2013. The City sent a responsive document on 5/13/2013.

Other notes: The City's failure to complete a local limits re-evaluation constitutes SNC under the
federal definition and should have been identified as such to the facility but was not. This
violation constitutes SNC because it concerns a permit required pretreatment report that was
overdue more than 90 days (approximately 14 months) at the time the LOW was issued.

Mike's Total (M00114049)

Inspection date(s): 8/27/2013 (16 days)

Inspection notes: The state conducted a compliance inspection at this facility and discovered
several violations that were well documented in the report. The report contained nearly all of the
items from the EPA's Inspection File Checklist. Although the inspection report was complete,
MDNR should have discovered and identified one of the violations one year earlier. In particular,
a permit renewal application was due to MDNR 180 days prior to the permit expiration, which
predated the inspection by six months.

Enforcement action date(s): 9/12/2013 (NOV)

Enforcement action notes: MDNR issued the NOV in conjunction with the inspection report and
requested a response from the facility within three weeks. The file included the facility's
response, consisting in part of a facility closure plan that would negate the need to renew the
permit.

Other notes: None

Page 101 of 134


-------
JCSD Mirasol WWTF (MO0134147)

Inspection date(s): 4/11/2013 (11 days)

Inspection notes: The MDNR inspection report contained sufficient information to inform a
compliance determination and found the facility to be in compliance. However, the EPA
identified three concerns with the completeness and accuracy of information in the report. The
report contained an inaccurate permit number for the facility. The facility address was missing
from the report, and the results from sample analysis had not yet been received from the
laboratory when the report was finalized. MDNR should either hold the report until analytical
results can be reviewed and incorporated into the report or send to the facility and the file a
report addendum.

Enforcement action date(s): None
Enforcement action notes: None
Other notes: None

Potosi WWTF (M00099431)

Inspection date(s): None during FFY 2013

Inspection notes: The EPA selected this facility on the premise that MDNR conducted an SSO
inspection during FFY 2013. Upon review of the facility file, however, the EPA discovered that
the FFY 2013 inspection was a routine compliance inspection, whereas the SSO inspection took
place during FFY 2012. For this reason, the EPA did not review this facility file any further and
excluded it from file metrics data.

Enforcement action date(s): None
Enforcement action notes: None
Other notes: None

Little City MHP (M00057363)

Inspection date(s) and # days to report: 9/12/12 (36 days)

Inspection notes: The state's inspection of Little City led to a report that included most of the
items on the EPA's Inspection File Checklist, with the exclusion of SIC code identification and
the report was slightly late. Of note, while the facility was notified of the inspection and the state
obtained permission to enter the property, no representative of the facility was present during the
inspection. The inspection report generated a clear determination that the facility was out of
compliance.

Enforcement action date(s): Multiple NOVs beginning in November 2001, May 2004, May
2009, November 2009, October 2010, October 2012, and AGO referral on 11/8/10
Enforcement action notes: MDNR sent the November 2009 NOV to address failure to renew its
NPDES permit and failure to submit DMRs. No record of an attempt at CC&P exists, however
EAR was sent 12/03/09. The violations were then referred to the AGO on 11/8/10 and final
resolution in the form of a Consent Judgment was obtained 9/9/13. The settlement penalty
collected is $5,000.

Other notes:

Kari's Cupboard and Camp (MO0133833)

Inspection date(s) and # days to report: 10/25/11 (10/26/11 date of report)

Inspection notes: The state's inspection of Kari's Cupboard and Camp led to a report that

included most of the items on the EPA's Inspection File Checklist, with the exclusion of SIC

Page 102 of 134


-------
code identification and failure to identify participant from the facility. The inspection report

generated a clear determination that the facility was out of compliance.

Enforcement action date(s): Multiple (5) NOVs beginning in November 2011, EAR October

2011, and AGO referral February 2013 (previous NOVs were sent and attempt at CC&P in 2009,

however they were rescinded when the facility informed MDNR that they were no longer in

operation).

Enforcement action notes: MDNR inspected the facility in October 2011 and the inspection
revealed numerous failures to submit DMRs, unmarked and improper outfall, significant O&M
violations (does not have 2 pumps operating), no disinfection, no flow equipment and no alarm.
The facility was generally non-responsive until AGO involvement and responded to an AGO
letter June 2013 and on July 2013. There was no further communication from AGO until July
2014, when an email notes other priorities. The matter is not yet resolved.

Other notes:

Land Disturbance Permitted Sites

Southern Hills Shopping Center (MO-RA02213)

Inspection date(s) and # days to report: 2/14/13 (15) & 3/15/13 (10)

Inspection notes: During the 2/14/13 inspection the site was found to have several (none very
serious) failure to install and failure to maintain BMP violations. The body of the inspection
report states that the items need to be fixed in seven days and that DNR would conduct a follow-
up inspection "in the near future."

A follow-up inspection was conducted on 3/15/13. During the inspection the inspector
documented that all BMPs had been installed and/or maintained and that the site was in
compliance.

Enforcement action date(s): none
Enforcement action notes: none
Other notes:

Project Fred (MO-RA00353)

Inspection date(s) and # days to report: 7/26/13 (39)

Inspection notes: The inspector found the facility to be 100% completely built and stabilized.
The report body states that the site is finished and recommends the facility submit Form H and
request termination of the permit since the permit does not automatically expire.

Enforcement action date(s): none
Enforcement action notes: none

Other notes: The inspection report was unsigned by the inspector but the cover letter was signed
by a KCRO environmental manager.

Emerald Lake (MO-RA00190)

Inspection date(s) and # days to report: 4/4/13 (8)

Inspection notes: This inspection was conducted in response to receipt of Form H- Request to
Terminate Permit Coverage for this site. The site was found to be fully stabilized.

Enforcement action date(s): none
Enforcement action notes: none
Other notes:

Page 103 of 134


-------
Chesterfield Blue Valley (MO-RA00283)

Inspection date(s) and # days to report: 1/9/13 (13)

Inspection notes: The cover letter refers the facility to the inspection report in which the
inspector finds the site to be in compliance.

Enforcement action date(s):

Enforcement action notes:

Other notes:

West Elementary School (MO-RA00503)

Inspection date(s) and # days to report: 2/7/13(61) & 6/4/13 (23)

Inspection notes: The inspection revealed several violations: no complete copy of permit or
SWPPP onsite, public notification sign was inside the construction trailer, failure to install
BMPs, sediment deposition in street and inlet, runoff overtopping silt fence surrounding storm
sewer inlet box, turbid water in excess of permitted SS limit entering storm inlet, and silt fence in
need of repair.

Enforcement action date(s): NOV issued 4/9/13 and was transmitted with the narrative inspection
report.

Enforcement action notes: The facility sent a response dated 5/23/13 as required by the NOV.
The response described corrective actions taken to address the violations.

Other notes: MDNR conducted a follow-up inspection on 6/4/13 and determined the facility had
returned to compliance with the exception that the public notification sign was not displayed as
required by the permit.

Lake Van Loo Estates (MO-RA01168)

Inspection date(s) and # days to report: 7/2/13 (8)

Inspection notes: The inspection was conducted in response to a complaint received from a
concerned citizen. The inspector found the site had allowed pollutants to enter waters of the
state, failure to install BMPs, failure to provide a copy of the SWPPP during the inspection, and
failure to conduct and document site inspections.

Enforcement action date(s): LOW issued 7/10/13 and was transmitted along with a copy of the
narrative report.

Enforcement action notes: The LOW required a response by 7/31/13. The facility sent a timely
response documenting corrections made (including photos), a copy of the SWPPP and copies of
inspection reports.

Other notes: Upon receipt of the letter, photos, SWPPP, and copies of site inspection records,
MDNR sent a letter to the facility stating they had returned to compliance. In addition, MDNR
sent a letter to the complainant stating that an inspection had been conducted, violations were
discovered and being followed-up on.

Gravois Bluffs Estates (MO-R10A196)

Inspection date(s) and # days to report: 2/27/09 (14) The first of many inspections/site visits and
was done in response to a complaint. None of the inspections documented for the site were
conducted in FF Y13.

Inspection notes: Many violations were documented during the 2/27/09 inspection including:
inadequate BMPs allowed sediment to migrate offsite; sediment in excess of the SS limit was

Page 104 of 134


-------
observed in the stream; discharge caused violation of the WQS; failed to implement and maintain
BMPs; no SWPPP (?).

Enforcement action date(s): A NOV was issued in response to the 2/27/09 inspection. 4
additional inspections were conducted and at least two additional NOVs were issued. In the
meantime, the facility submitted a Form H to request termination of the permit which was denied
because although construction had ceased the site was not fully stabilized. The site was referred
to the central office for enforcement on 2/8/10. The central office in turn referred the site to the
AGO for enforcement on 2/23/11 because the site owner had not responded to MDNR's prefiling
letter. The central office requested the AG to seek penalties and injunctive relief for compliance.
Enforcement action notes: The file contains a fully executed consent agreement dated 11/30/12.
The consent agreement requires the facility to fully stabilize the site and submit Form H
requesting termination of the permit within 180 days of the execution date of the agreement.
Furthermore, the facility must pay a penalty of $50,000. $20,000 of the total penalty amount will
be suspended if the facility complies for 2 years. The penalty calculation did not account for
economic benefit. The file contained a copy of the check in the amount of $30,000. It does not
appear the site achieved final stabilization. A June 2013 email states it was too early to pursue
contempt of court for the failure to achieve final stabilization. The most recent email in the file
states the facility was maintaining interim BMPs while the effort to stabilize was ongoing and
that it was close to "wrapping up."

Industrial Stormwater

UPS Sikeston (MO-R80C214)

Inspection date(s) and # days to report: 2/20/13 (51)

Inspection notes: The facility submitted a no exposure certification form and requested that
permit coverage be terminated based on no exposure. The file contains a letter dated 11/21/12
from MDNR to the facility stating that the facility was granted a no exposure certification
(certification # MO-NX00247) based on an investigation of the facility on 11/16/12. The file did
not contain documentation from the 11/16/12 investigation.

Enforcement action date(s): none
Enforcement action notes: none
Other notes:

International Paper (MO-R130033)

Inspection date(s) and # days to report: 7/18/13 (35)

Inspection notes: The inspector found the facility to be in compliance with the permit conditions.
The inspector did, however, recommend that the SWPPP be updated and that empty drums
should be stored upright and sealed.

Enforcement action date(s): none
Enforcement action notes: none

Other notes: The inspection states that the facility is on the St. Joseph CSO and discharges to the
CSO. I wondered if stormwater permit coverage was necessary. However, the NOI did identify
Candy Creek as the receiving stream.

Stanton Manufacturing (MO-R22A020)

Inspection date(s) and # days to report: 2/8/12 (16)

Page 105 of 134


-------
Inspection notes: The inspector found the facility had no SWPPP as required by the permit, no
self-site inspections had been conducted and documented, wood chips were blown onto the
ground near a storm drain, and a large amount of sawdust and wood chips were in the tributary at
the discharge location.

Enforcement action date(s): NOV 14680 SW was issued on 4/12/13.

Enforcement action notes: The NOV and report narrative that accompanied the NOV alerted the
facility that noncompliance was found during the inspection. The cover letter states that the
facility must reply to MDNR within seven days and describe actions taken to correct
noncompliance discovered during the inspection. The engineer hired by the facility responded on
4/19/13 and stated that a SWPPP would be developed within thirty days, a copy of which would
be sent to MDNR.

Other notes: There is nothing in the file dated after 4/19/13. It is therefore not possible to know if
the facility submitted a complete SWPPP, implemented its provisions and returned to
compliance.

MoDOT Lamar Maintenance Facility (N/A)

Inspection date(s) and # days to report: 5/7/13 (36)

Inspection notes: MDNR conducted an investigation of this facility on 5/7/13 in response to a
spill that occurred on 4/29/13. MDNR characterized the violation as a spill/release to the
environment of a water/oil emulsion from an asphalt pile which discharged to an unnamed
tributary of the North Fork of Spring River.

Enforcement action date(s): NOV issued 6/12/13

Enforcement action notes: The cover letter/NOV stated: " You are requested to submit a written
response within 30 calendar days of the date of this letter that includes an Operations &
Maintenance Plan that explains the process taken to clean up the illicit release, and actions
taken to prevent a future recurrence." MoDOT's response states that a berm had been
constructed around the pile and that the asphalt was oilier than usual. MoDOT said it was trying
to use the pile as quickly as possible. Furthermore, MoDOT stated that the supplier of the asphalt
was going to remove and appropriately dispose of the underlying stained soil as soon as the pile
was completely used.

Other notes: It does not appear MDNR conducted a follow-up inspection to ensure MoDOT's
intended plan was carried out. The file was closed based on MoDOT's response.

Missouri Red Quarries (MO-G490926)

Inspection date(s) and # days to report: 1/10/13 (28)

Inspection notes: MDNR conducted an inspection on 1/10/13 and documented the facility had no
SWPPP as required by the permit.

Enforcement action date(s): LOW issued 2/7/13.

Enforcement action notes: The LOW states the facility must take action to correct the violation
but does not require a response and/or submittal of a site SWPPP to MDNR. However, the
facility did submit a copy of a SWPPP dated March 2013 to MDNR.

Other notes: The inspector either did not record all of the findings or once realizing the facility
had no SWPPP did not conduct a complete inspection. The file does contain pictures of the
outfalls. However, there is no discussion in the inspection report of the facility's processes,

BMPs in place or needed, site inspection reports, good housekeeping, employee training and
other permit requirements.

Page 106 of 134


-------
F & S Pallet (MO-R22C023)

Inspection date(s) and # days to report: N/A (n/a)

Inspection notes: The file contains a few LOWs and NOVs for failure to pay renewal fees
associated with the permit. All file activity pertains to the outstanding permit fees. The file does
not contain an inspection of the site.

Enforcement action date(s): There are several. In FFY13, a LOW was issued on 11/8/12 and a
NOV was issued on 7/19/13.

Enforcement action notes: Based on the documentation in the file it does not appear the fees
were paid in full.

Other notes:

AFB International (aka Bioproducts, Inc.) (MO-0129224)

Inspection date(s) and # days to report: 3/26/13 (17)

Inspection notes: MDNR conducted an inspection on 3/26/13. The inspector observed two
outfalls that discharge stormwater that were not identified in the permit. There were additional
deficiencies identified during the inspection but they related exclusively to the land application
requirements in the permit.

Enforcement action date(s): LOW issued 4/12/13.

Enforcement action notes: The LOW states the facility must provide a written response to
MDNR within 15 days describing actions taken to correct the noncompliance observed during
the inspection. The facility responded with a letter dated 4/25/13 which stated the facility
conducted its own investigation and actually found 3 additional stormwater outfalls and would
make sure the outfalls were identified in the upcoming application to renew the facility's permit.
The permit expired 11/23/13. Both OTIS and the MDNR website indicate the permit remained
expired on 3/12/14.

Other notes:

Paris Ready Mix (MO-G491065)

Inspection date(s) and # days to report: 10/25/12 (40) and 5/15/13 (7)

Inspection notes: MDNR conducted an inspection on 10/25/12. The inspector contacted the
owner/operator on the way to the inspection and was informed the facility was no longer in
operation. The inspector performed the inspection, observed no spills or discharges and states in
the report that all materials stored outside should be removed. The inspector further documented
that while in operation the facility had failed to submit DMRs and annual operations reports.
LOWs and NOVs were issued to this facility on a parallel track for failure to renew the permit
and submit permit fees to MDNR. The site was again inspected on 12/4/12. The same
observations were made. The site was inspected on 5/15/13. The inspector states the previous
violations are ongoing and the site is being referred to the central office for enforcement. The
body of the inspection report further states that corrective action in response to the outstanding
LOWs and NOVs (submittal of DMRs, Annual reports) must now be coordinated with the
central office.

Enforcement action date(s): Several LOWs and NOVs were issued to this facility over the period
of a few years both for the programmatic violations described above and for the failure to renew
the permit and pay permit fees. NERO drafted a referral to the central office requesting formal

Page 107 of 134


-------
enforcement on 5/21/13. However, it appears the request was not sent at that time. The file
contains a 1/31/14 memo from NERO to the central office in which a formal request for
enforcement was made.

Enforcement action notes: The central office sent a letter to the facility owner on 2/7/14 inviting
settlement of the outstanding violations. In the letter MDNR states it will forego formal
enforcement if the facility removes all materials stored outside and submits all DMRs and annual
reports for the time period they are missing (sometime in 2009 to the present). MDNR further
states it will accept a statement explaining why the documents are missing in lieu of their
submittal along with a payment of the outstanding permit fees ($633) and a Form H to terminate
the permit to settle the matter. The 2/7/14 letter allowed the facility until 3/31/14 to complete all
required actions and respond to MDNR. This was the most recent item in the file on the 3/11/14
date of the EPA review.

Other notes:

Shapiro Brothers (MO-R60A146)

Inspection date(s) and # days to report: 9/14/11 (60)

Inspection notes: MDNR conducted an inspection on 9/14/11. The inspection revealed several
violations, including the failure to prevent a discharge at a location other than a permitted
(designated) outfall, allowing pollutants to enter the tributary to Plattin Creek, allowing water
quality standards (for lead and cadmium) to be violated, not submitting reports, and failure to
transfer the permit (new owner). The facility had been inspected earlier in 2011 and several of
the same violations were observed during that inspection.

Enforcement action date(s): MDNR issued a NOV on 11/23/11 when transferring the inspection
report for the 9/14/11 inspection. The NOV informed the facility that the facility was being
referred to the central office for formal enforcement. In addition, the NOV required a response
from the facility in 15 days. The facility sent a response to the NOV on 12/13/11. MDNR sent a
second NOV on 12/6/11 based on results received from samples taken during the 9/14/11
inspection.

Enforcement action notes: SLRO sent a request for enforcement to the central office on 12/6/11.
On 3/28/12 MDNR sent a letter to the facility outlining the violations, stating the need for an
individual permit and development of a SWPPP (the general permit did not require a SWPPP),
and the opportunity to negotiate a settlement including penalty. The file contains a tolling
agreement signed 7/2/13. The tolling agreement is the formal enforcement credited in FFY13.
The file also contains documents reflecting the more current status of the case. A fully executed
order on consent dated 12/5/13 was in the file. The enforcement staff calculated a penalty of
$16,000. Kevin Mohammadi crossed out the $16,000 calculated on the penalty worksheet and
penciled in $40,000. MDNR settled on a penalty of $30,000 of which $10,000 was suspended
and $20,000 paid. The file contains a copy of a check for $20,000. The file also contains a copy
of a check to MDNR for costs incurred in the investigation. The penalty calculation worksheet
accounts for gravity but not economic benefit.

Other notes: MDNR received an application for a site specific permit on 3/4/13. The site specific
permit will require a SWPPP. The facility hired a consultant to draft a SWPPP. MDNR
commented on the SWPPP and a revised SWPPP was submitted to MDNR on 1/9/14 that
incorporated the comments that had been received. It was not possible to determine if the facility
had a current, effective permit at the time of the file review. MDNR had returned to the facility a
NOI for the general permit and the facility was still developing the SWPPP in January 2014.

Page 108 of 134


-------
M-D Building Products (Loxscreen) (MO-R203205)

Inspection date(s) and # days to report: 3/8/11 (29)

Inspection notes: MDNR conducted an inspection on 3/8/11 at the request of the City of Hayti in
which this facility is located. The city said the facility was causing a SSO. The facility sent
treated process water to the facility on this date even though the city said they could not accept
the water. The city had provided notice to the facility on 3/3/11 that it could not accept
wastewater from the facility until further notice. The facility sent the treated process water
anyway which resulted in an overflow from a manhole. The discharge (SSO) had odor, pH of
10.7, contained solids, and aluminum at 353,000 micrograms. The limit for aluminum was 750
microgram.

Enforcement action date(s): MDNR issued a NOV on 4/6/11 when transferring the inspection
report for the 3/8/11 inspection. The NOV informed the facility that the facility was being
referred to the central office for formal enforcement and required a response detailing actions
taken to correct the SSO. Loxscreen sent a letter to MDNR dated 4/25/11 in which it states it
makes observations of the manhole on an hourly basis and also blames the city for the events
leading to the SSO on 3/8/11.

Enforcement action notes: SERO sent a request for enforcement to the central office on 4/6/11.
MDNR sent a letter to Loxscreen on 7/13/12 inviting Loxscreen to negotiate a settlement for the
SSO on 3/8/11. The parties reached settlement as memorialized in a fully executed AOC dated
12/6/12. Loxscreen paid a penalty of $5,000 and paid MDNR's costs totaling $2,676.60. The
penalty worksheet denotes a penalty of $10,000 was calculated for the case. Loxscreen offered
$2,500 and the parties agreed on $5,000. There was no calculation of economic benefit in the
original calculation. A 9/6/13 memo from Joan Doerhoff to Paul Dickerson states the facility
paid the penalty and costs and demonstrated a return to compliance. The memo recommends the
case be closed.

Lincoln County Farmers Coop (MO-R240266)

Inspection date(s) and # days to report: 4/25/12 (14)

Inspection notes: MDNR conducted an inspection on 4/25/12. The inspection was conducted in
response to a fish kill. MDNR was notified of the fish kill by a MDC agent who observed it and
informed MDNR on 4/25 of the need to investigate. The inspection report states the facility
discovered that a valve had been opened (facility blamed vandals) and a tank emptied of
agricultural chemicals. The inspection report reveals that the spill was not reported and no effort
had been made by the facility to clean up the spill or prevent additional flows to the creek. The
facility had even pumped out the secondary containment allowing more spilled chemical to reach
the stream. The spill was cleaned up after the MDNR inspection.

Enforcement action date(s): MDNR issued a NOV on 5/9/12. The NOV required a response
within 15 days detailing actions taken to correct the violation.

Enforcement action notes: SLRO sent a request for enforcement to the central office on 5/24/12
asking the Central Office to collect penalty for the chemical release and fish kill. MDNR sent a
prefiling letter to the facility on 7/5/12 offering a negotiated settlement that would include
collection of a penalty, recovery of MDNR costs, agreement by the facility to add/increase
secondary containment and agreement that spills must be reported. The file contains a fully
executed settlement agreement dated 10/15/12. The facility agreed to pay a penalty of $4,000,

Page 109 of 134


-------
reimburse MDNR for costs totaling $3948.43, notify MDNR within 24 hours of a spill in
compliance with the terms of the permit, and provide secondary containment. The agreement
also contains a provision for stipulated penalties. The penalty calculation worksheet completed
by MDNR originally had a penalty of $12,000. Paul Dickerson crossed out the $12,000 and
decreased the penalty to $4,000. It appears this change was made to assert the spill was a one
day, not a three day event. The penalty calculation did not assess economic benefit.

Other notes: The file contains a 3/4/13 memo to file from Corinne through Joan Doerhoff to Paul
Dickerson requesting the case be closed because the terms of the agreement had been fully met.
The facility paid the penalty and costs, and all chemicals were moved indoors for storage in a
designated chemical storage building. Furthermore, a berm and basin were constructed at the
facility to collect all stormwater.

MS4

City of Poplar Bluff (MO-R040027)

Inspection date(s) and # days to report: 12/18/12(30)

Inspection notes: MDNR conducted an inspection on 12/18/12. The inspection was a full
inspection of the city's activities related to all six minimum control measures, records review,
review of checklists, the SWMP, and the inspectors also visited city facilities, a storage yard and
observed a private construction site inspection performed by city staff. The narrative report states
the inspectors had a list of questions to help them conduct the inspection but the list was not
included in the files reviewed by the EPA.

The inspector determined the city was in noncompliance, specifically that the SWMP did not
comply with the requirements of the permit and the city had failed to develop and implement a
few to several requirements associated with each minimum control measure. The narrative report
that accompanied the cover letter informed the city that it must correct all deficiencies within
180 days and that MDNR may conduct a follow-up inspection.

Enforcement action date(s): none
Enforcement action notes: none

Other notes: MDNR also conducted an inspection of the Poplar Bluffs MS4 in November 2011.
The program deficiencies documented during that inspection were almost identical to the
findings from the 2012 inspection. The conclusion in the report from the 2011 inspection was
that the city was in noncompliance, had 180 days to take corrective action and come into
compliance, and that MDNR may conduct a follow-up inspection. MDNR may consider
escalating its response since the level of noncompliance observed during two inspections of the
Poplar Bluff program document failures in every program area.

Calloway County MS4 (MO-R040070)

Inspection date(s) and # days to report: 6/11/13 (34)

Inspection notes: MDNR conducted a targeted inspection of the Calloway County Illicit
Discharge Detection and Elimination component of the MS4 program. The county was found to
be in noncompliance with nearly every aspect of the IDDE requirements as outlined in the
permit, including failure to develop a system map, failure to inspect outfalls and conduct dry
weather screening, failure to develop and implement an ID detection plan, etc.

Enforcement action date(s): LOW issued 7/15/13.

Page 110 of 134


-------
Enforcement action notes: The cover letter (LOW) to the report required that Calloway county
provide a written response to MDNR by 8/5/13 describing the corrective actions they would take
to address the noncompliance observed during the inspection and a timeframe for completing the
corrections. Calloway County sent MDNR a letter dated 7/31/13 in which they outlined a plan to
address each violation documented during the inspection and committed to completing the
corrections within 180 days. MDNR sent a letter to Calloway County dated 12/16/13 in which
they reminded Calloway County that according to the commitment they made in the 7/31/13
response to the LOW they must be in compliance with the IDDE requirements in their permit by
7/31/14.

Other notes: It was clearly stated in the inspection report that the inspection was targeted and
looked only at activities and compliance related to the IDDE program. The report stated
MDNR's sole focus on IDDE during the inspection should not be construed to mean that the
county was in compliance with the other MCMs in the permit.

Page 111 of 134


-------
Concentrated Animal Feeding Operations

Danny Bevill (MOG010451)

Inspection date(s) and # days to report (or send IT letter): 6/5/2013 (23 days)

Inspection notes: Discharge investigation report. The report did not contain the CAFO inspection
checklist. Photos and samples were taken. Main determination from inspection is that facility had
discharged into waters of the state. The report had 8 sections. These are: Introduction,

Operational Description/History, Discussion of Investigation and Observations, Water Quality
Monitoring, Compliance Determination, Notice of Violation, Unsatisfactory Features,
Recommendations. Not all aspects of the CWA File Review checklist were completed. The
facility was found to be non-compliant as reflected in the inspection write-up.

Enforcement action date(s): NOV issued to facility on 6/28/2013.

Enforcement action notes: Case also referred to Central Office (WPP) in Jefferson City for
enforcement.

Other notes: Inspection included an extensive narrative write-up. Compliance determination was
made (non-compliant) and promptly referred to WPP.

Deppe Farms Inc. (MOGS10063)

Inspection date(s) and # days to report or send IT letter: 3/14/2013 (14)

Inspection notes: This inspection was a non-sampling CAFO inspection that included the CAFO
checklist. Photos were included in this inspection. No violations were noted in the inspection
report. The report provided a good narrative write-up that included the following sections:
Introduction, Facility Description/History, Discussion of Inspection and Observations,
Observations and Findings, Compliance determination, Recommendations. The facility was
found to be in compliance as reflected in the inspector's observations documented on the
inspection checklist and narrative write-up. The report did make recommendations (add wall
around composting pile, research cost to purchase and install calibration equipment). Reviewer
did notice that neither box was checked for "stream observed" on the checklist, however in the
remarks section there was a comment that "no impact to stream observed".

Enforcement action date(s): none
Enforcement action notes: none
Other notes: None

Ponderosa LLC (MOG010227)

Inspection date(s) and # days to report or send IT letter: 6/12/2013 (76)

Inspection notes: This inspection was a non-sampling CAFO inspection that included the CAFO
inspection checklist. Three photos were included in the report. The facility was found to be in
compliance as reflected in the inspector's observations documented on the CAFO checklist. No
narrative was completed for this inspection. Not all aspects of the CWA NPDES File review
checklist were completed.

Enforcement action date(s): none
Enforcement action notes: none

Other notes: No narrative write-up for this inspection report. Not all items in the Inspection file
checklist were answered.

Roger Schnake (MOG010339)

Page 112 of 134


-------
Inspection date(s) and # days to reporter send IT letter: 6/11/2013 (17)

Inspection notes: This inspection was a non-sampling CAFO inspection that included narrative,
the CAFO inspection checklist, and photos. The facility was found to be in non-compliance as
reflected in the inspector's observations documented in the inspection checklist and narrative
write-up. The inspection found 2 unsatisfactory features. First the owner had failed to apply for a
permit, and second, the owner failed to submit the 2012 annual report. The report provided a
narrative write-up that included the following sections: Introduction, Operational
Description/History, Discussion of Inspection, and Unsatisfactory Features.

Enforcement action date(s): Letter of Warning was issued on 6/28/2013 (17 days after
inspection).

Enforcement action notes: None
Other notes:

Turkey Hill LLC (MOGS10407)

Inspection date(s) and # days to report: 8/1/2013 (28)

Inspection notes: Discharge investigation report. The report did not contain the CAFO inspection
checklist. Photos and samples were taken. Not all aspects of the CWANPDES file review
checklist were completed. Main determination found during the inspection was that the facility
had discharged. The facility was found to be non-compliant as reflected in the narrative write-up.
The report contained 7 sections: Introduction, Operational Description/History, Discussion of
Investigation, Water Quality Monitoring, Compliance Determination, Notice of Violation,
Recomm endati ons.

Enforcement action date(s): NOV issued 8/29/2013. (sent out 28 days after investigation).
Enforcement action notes: Case referred to Central Office (WPP) on 8/29/2013.

Other notes: Excellent narrative, promptly referred to WPP.

Sharpe Land and Cattle

Inspection date(s) and # days to report: 9/15/2011 (Report completed and sent to facility on
11/1/2011 (46 days).

Inspection notes: Discharge investigation report. The report did not contain the CAFO inspection
checklist. Photos and samples were taken. Extensive narrative write-up was completed. Not all
aspects of the CWA NPDES File Review Checklist were completed. The facility was determined
to be non-compliant as reflected in the narrative write-up. The facility discharged.

Enforcement action date(s): NOV issued 11/1/2011. Administrative Order for Compliance
signed on 1/28/2013 (1 year, 3 months after referral).

Enforcement action notes: Case referred to the Central Office (WPP) on 11/1/2011. Penalty
Matrix Worksheet was completed.

Other notes: Documentation in the file showing Terms of the AOC were fulfilled and case has
been closed. MDNR negotiated a settlement for $20,000. Penalty started at $40,000. MDNR also
received administrative costs for $1925.80. Letter in file to MDNR which states 2 checks are
enclosed. No economic benefit calculated.

Twin Hills Farms (Unpermitted)

Inspection date(s) and # days to report: Inspection not reviewed for this case. First complaint was
September 2010 (improperly disposing dead animals). On 4/8/2011 MDNR staff observed runoff

Page 113 of 134


-------
discharging from facility (over 1,000 head of cattle at facility). MDNR completed approximately
5 on site investigations from 2010-2012.

Inspection notes: This facility was operating above 1,000 open cattle feedlot without a permit.
FO completed multiple visits to this site.

Enforcement action date(s): NOV issued 10/13/2011

Enforcement action notes: Field office issued NOV on 10/13/2011. About 6 months after
4/8/2011 inspection where discharge was documented. Field office referred case to Central
Office on 2/22/2012. On 7/24/2013 MDNR reached a Settlement Agreement with Respondent to
pay $1,500 of a $6,000 penalty and to pay $1,602.98 in MDNR costs. No economic benefit was
calculated.

Other notes: Difficult drawn-out case (recalcitrant respondent). Respondent indicated inability to
pay. MDNR does not have a process in place to check this (ability to pay). (AG does have some
ability to do this). Did not see any rational for not figuring economic benefits, this would have
been an appropriate case for calculating. Documentation in the file showing 2 checks mailed to
MDNR for penalties discussed above. Also evidence in file that issues at the facility have been
corrected. NRCS was involved.

Jeffrey Miller Broilers (MOGS10175)

Inspection date(s) and # days to report (or send IT letter): 3/27/2013 (65 days)

Inspection notes: This was a non-sampling CAFO inspection that included the inspection
checklist. Photos were included in this inspection. The facility was found to be in non-
compliance as reflected in the inspector's observations documented in the CAFO checklist and
narrative write-up. The report included a narrative write-up which included the following
sections: Introduction, Participants, Facility Description/History, Inspection
Description/Observations, Compliance Determination, and Unsatisfactory Features.

Enforcement action date(s): LOW/IT letter issued 5/31/2013.

Enforcement action notes: Documentation in file indicates that issues were corrected 6/10/2013.
This was 75 days from the inspection.

Larry Long (MOG010504)

Inspection date(s) and # days to report (or send IT letter): 10/3/2012 (33 days)

Inspection notes: This was a non-sampling CAFO inspection that included the inspection
checklist. Photos were included in this inspection. The facility was found to be in non-
compliance as reflected in the inspector's observations documented in the CAFO checklist and
narrative write-up (owner failed to apply for renewal of permit). The report included a narrative
write-up which included the following sections: Introduction, Operational Description/History,
Discussion of Inspection and Observations, Unsatisfactory Features, Recommendations.
Enforcement action date(s): An LOW/IT letter was issued 33 days after the inspection. On
11/30/2014 case was referred to the Central Office. On 9/10/2013 MDNR received an
application for a permit. An Administrative Order on Consent was signed on 1/10/2014.
Enforcement action notes: Penalty started out at $4,000. MDNR decided to forgo penalty. TCRs
in the file indicating he couldn't pay the permit fee. Did not locate any documentation in the file
that penalty included economic benefit.

Other notes: Respondent eventually applied for an NPDES permit.

Concentrated Animal Feedlot Overall Summary:

Page 114 of 134


-------
In most cases inspections were sent out to the facilities in a timely manner. Also cases were
referred to the central office in a timely manner. There was one review where the inspection
report only had the completed CAFO checklist and no narrative write-up. One of the
enforcement case reviews noted that it took several visits and about 6 months to issue an NOV
for significant non-compliance. The EPA suggests including an aerial photograph with each
inspection and label buildings, pens etc. Suggest also showing where photographs were taken on
aerial photograph as well.

Page 115 of 134


-------
Pretreatment File Reviews:

The facilities chosen for Pretreatment SRF review were taken from a list of Pretreatment
inspections for FFY 2013 provided by MDNR. From the list, eight Significant Industrial Users
located in non-Pretreatment program cities were chosen along with eight POTWs that received
either a Pretreatment audit or Pretreatment Compliance Inspection. Of the eight industries, one
was coded incorrectly, Exide Tech - Canon Hollow, and actually a direct discharger holding an
NPDES permit. Consequently, this facility was not reviewed and is not discussed in the findings
below.

From the list of inspections in FFY 2013, a conscious effort was made to select evenly from
across each field office. This was done because at the last program review, MDNR was
beginning to initiate greater participation by the field offices in the Pretreatment program. For
over 20 years, all Pretreatment program audits or PCIs were conducted by the Pretreatment
Coordinator from the Jefferson City central office. So this year's program review is an
evaluation of MDNR's move from a centrally implemented Pretreatment program to a regional
office based implementation. Two industries and two approve Pretreatment program inspections
were selected from the NERO, SERO, SWRO, and Kansas City office. There were no
inspections reported to have been performed in the Saint Louis Regional Office for FFY 2013.

Inspections of Categorical Industrial Users Outside Pretreatment Program Cities

Bob Monning Industries, Glasgow (CIU000011)

Inspection date(s) and # days to report: 11/01/2012(91)

Inspection notes: The inspection was well done and comprehensive. Particularly detailed was the
description of the production process. In addition, because the facility certifies that it has no
discharge of process water, a detailed description was given of the wastewater treatment
(precipitation) and recycle system. The violations for failing to submit no-discharge statements
were discussed in the inspection report and clearly identified as the reason for the NOV.
Enforcement action date(s): NOV, at time of inspection report transmittal on January 31, 2013
Enforcement action notes: The NOV was for the failure of the industry to submit semiannual
reports on continued compliance. Specifically, the facility failed to submit certified statements
that they had had not discharges during the respective reporting period.

Other notes: The inspection report notes that a checklist was used to direct the inspection.
However, a copy of the checklist was not included as an attachment to the inspection report.
Moreover, it was not supplied to the EPA as part of the file for this industry as part of this
program review. Consequently, it is not known if the checklist is part of the permanent record
kept on this industry. It should be. Even though the narrative report was informative, there will
be additional information in the checklist that needs to be preserved.

Cerro Flow Products, Shelbina (CI0000023)

Inspection date(s) and # days to report: 02/14/2013 (74)

Inspection notes: The inspection provided a thorough description of the manufacturing process
and the products produced. The report acknowledged that the facility is subject to a production
based standard, i.e., the discharge allowance is based on the amount of product produced.
Information was provided on solvent recovery, which is informative as this facility has a TTO

Page 116 of 134


-------
limit. The facility tests for TTO semiannually rather than oil and grease as a surrogate pollutant.
There was no mention in the inspection report that the production levels reported by the facility
were verified. It was also not mentioned on whether the facility operates a pretreatment system.
Enforcement action date(s): No enforcement action resulted from this inspection.

Enforcement action notes: NA

Other notes: While there was no discussion in the inspection report on production levels,
periodic compliance reports that were part of the industry file submitted to the EPA contain
production information. While the inspection report states that a field checklist was used, it was
not attached to the inspection report nor part of the overall file supplied to the EPA. Checklists
are very informative and should be part of the permanent record of the inspection even if they are
not sent with the facility inspection report.

Advanced Industries, Odessa (CIU000032)

Inspection date(s) and # days to report: 09/26/2013 (102)

Inspection notes: The inspection report was sufficiently descriptive to understand the facility's
operations and regulated process. The report identifies four Unsatisfactory Features and clearly
states the Required Actions needed for each. Response to these Actions were required, per the
report, to be to the Department no later than January 20, 2014.

Enforcement action date(s): January 6, 2014.

Enforcement action notes: The transmittal letter identified itself as a Letter or Warning. The
inspection documented late reports and periodic chromium violations. The facility replied to the
LOW 11 days later on January 17, 2014 and reported that they are purchasing a chrome removal
system.

Other notes: The inspection report contained a copy of the inspection checklist used during the
inspection. This provided additional important information showing activities at the facility. The
checklist stated that Advanced is subject to the Metal Finishing regulations at 40 CFR 433.15.
These are Pretreatment standards for Existing Sources. If Advanced installed its regulated
process line after August, 1981 it would be subject to 433.17, the Pretreatment Standards for
New Sources.

Thorco Industries, Butler (CIU000033)

Inspection date(s) and # days to report: 09/12/2013 (no report)

Inspection notes: No inspection report for FFY13 was provided to the EPA. An inspection was
conducted on September 10, 2012 (FFY 2012) which was reviewed, but not evaluated as it is
outside the FFY 2013 time period. Also in the file was a January 18, 2013 letter stating that
Thorco had closed. However, it was not clear that this in fact occurred as there were semiannual
reports also in the file for June 2013 and December 2013.

Enforcement action date(s): NA
Enforcement action notes: NA
Other notes:

Gates Corporation, Versailles (CIU000025)

Inspection date(s) and # days to report: 04/24/2013 (23)

Inspection notes: The inspection report consisted of a one page narrative of findings and
recommendations with the checklist used to conduct the inspection attached. While no violations
were identified of the Gates facility, the inspection narrative noted that the city had violated its

Page 117 of 134


-------
NPDES permit monthly average effluent limits for zinc for five months in 2012. A
recommendation was made that Gates voluntarily reduce its zinc discharge and that Gates and
the city need to "explore options" for resolving the city's zinc violations, including the
possibility of developing a local limit. A copy of the report was also sent to the city.
Enforcement action date(s): NA
Enforcement action notes: NA

Other notes: The attached inspection checklist was complete and informative. From the
information provided, one could tell flow rates, pollutant types, treatment system capacities, and
sludge generation. The rinse rate was reported at 3 gpm which is a level that ensures the facility
is not diluting its way into compliance with a concentration based limit.

The EPA inspected Gates and the city in January, 2011 because of observed elevated zinc levels
in the city's sludge. It was found that Gates had experienced a pH probe malfunction only a few
days before the city's annual sludge sample. In closing out the inspection, the EPA noted its
analysis indicated that under certain conditions, the city could be in violation of its NPDES
permit even while Gates was compliant with its Categorical standard. From MDNR's inspection
report of April 2013, this is occurring. The General Pretreatment Regulations at 40 CFR
403.5(c)(2) require that any non-Pretreatment program city that has experienced pass through
that is expected to recur to develop a local limit to prevent this. Therefore, the city needs to be
required to develop a local limit for zinc as soon as practicable.

Scroll Compressors, Ava (CIU000002)

Inspection date(s) and # days to report: 04/11/13 (26)

Inspection notes: Observed during this inspection, and other inspections from this Regional
Office, is checking on the availability of the approved Solvent Management Plan. The inspector
notes that the facility certifies that they are adhering to the requirements of the Plan in order to
not need to sample to demonstrate compliance with the Total Toxic Organic limit. When it is
discovered that the Plan can't be found, the inspector requires it be located or a new one be
drafted. This is an excellent practice as one can't certify to be implementing something they
cannot locate. If the certification is to mean anything, the Solvent Management Plan has to be
followed.

Enforcement action date(s): NA

Enforcement action notes: No enforcement action taken.

Other notes: The inspection report notes that the facility has violated the city's sewer use
ordinance oil and grease limit of 100 mg/1. Since the city, Ava, does not have an approved
Pretreatment program, this is not a limit the State has the authority to enforce under the
Pretreatment program. The attached checklist notes that the facility generates two tons of sludge
per month, however, the checklist also indicates the facility does not have any wastewater
treatment. How is this possible? In addition, the checklist indicates that the facility rinses its
processed parts at a rate of 15 gpm. This is excessive as 5 gpm is recognized as an aggressive
rinse rate. Also, past nickel levels in the city's sludge have indicated that Scroll may have been
discharging nickel above its Categorical standard limits. When brought to the industry's
attention, they indicated that they were intending to eliminate nickel plating. While this process
is not listed in the inspection checklist as being performed, the chemicals identified on site
include nickel nitrate. What is this used for?

Page 118 of 134


-------
On the inspection checklist, for pollutants of concern metals and cyanide are listed, presumably
because these are regulated by the applicable Metal Finishing regulations. However, only the
pollutants found on site for this facility should be listed, e.g. nickel, manganese.

Tracker Marine, Ozark (CIU000021)

Inspection date(s) and # days to report: 04/04/13 (21)

Inspection notes: The inspection report consists of a two page narrative, a copy of the checklist
used in the field, and the test results from an early MDNR sampling inspection the previous
September. The report identified three areas of minor noncompliance and required their
correction. These were: the inability to locate the Solvent Management Plan for TTO control, not
analyzing pH within 15 minutes of taking the sample, and not properly certifying their periodic
compliance reports. In addition, the facility was asked to provide a water balance as it was not
readily available while on site as they had recently replaced a three stage phosphating system
with a five stage one.

Enforcement action date(s): NA
Enforcement action notes: No enforcement taken

Other notes: The attached inspection checklist raised a few concerns. Listed as raw material for
the manufacture of boat trailers was galvanized steel. Also listed was iron phosphating as the
regulated Metal Finishing process. It is the EPA's experience that galvanized material cannot be
subject to phosphate conversion coating and the facility routinely remain compliant with zinc
limitations without a wastewater treatment system. Because the water balance was not available
to the inspector it can't be determined if the rinse rates are excessive. The inspection report
shows no wastewater treatment but indicates that one 55 gallon barrel of sludge is generated per
month. (It also states that less than 2 such barrels are generated per year, so it's not clear what's
going on). Also, later in the checklist it is stated phosphorous soap wash is the process regulated
by the Metal Finishing standards. It is not clear if this is in addition to the already identified iron
phosphating or if this is considered the regulated process. If it is the regulated process, it is not
clear if there is an acid present to actually phosphatize the metal, although phosphate acid is
listed as part of the industry's chemical inventory.

Audits and Pretreatment Compliance Inspections of Approved Pretreatment Programs

Jefferson City, Pretreatment Compliance Inspection (M00094846)

Inspection date(s) and # days to report: 04/24/2013 (37 days)

Inspection notes: The inspection report consisted of a five page narrative. Although it stated that
a checklist was used during the PCI, one was not attached to the report. The files submitted to the
EPA for review did not contain a copy of the checklist. From the observations made in the
narrative it could be determined that the PCI had been sufficiently detailed. The report was
comprehensive and well written and included a description of an oversight inspection conducted
with the city of Modine Manufacturing, a Categorical industry regulated by the city.

Enforcement action date(s): NA

Enforcement action notes: No enforcement action was taken, however, the transmittal letter of
May 31, 2013 required the city to respond to the Recommendations section of the report by June
21, 2013. The file shows the city responded by June 11, 2013 and reported how the two items of
concern had been corrected.

Page 119 of 134


-------
Other notes: Inspection strengths: the narrative format provides a forum for describing in detail
the condition of the city's implementation activity. The PCI included an oversight inspection
which was also documented in details that allowed for the assessment of the city's understanding
of the industrial facility.

Inspection weakness: The checklist that was used for the PCI was not attached or provided to the
EPA for review. It is not clear if it is considered part of the permanent record for this facility,
although it should be. The narrative report, while well written, concentrates on, and only
documents, a few aspects of what was observed during the PCI. Including the completed
checklist would provide information on all other implementation responsibilities, policies, and
activities evaluated during the PCI.

Columbia, Pretreatment Audit (M00097837)

Inspection date(s) and # days to report: 10/10/2012(316)

Inspection notes: The inspection report consisted of a four page narrative write up. The report
stated that a checklist was used to direct the inspection, however, it was not attached to the
narrative. A copy of the checklist was not included in the documents provided to the EPA for
review so it is not known if it is considered part of the permanent record for this facility, as it
should be. Without the completed checklist to review it cannot be determined if the audit
evaluated all requirement elements of Pretreatment program implementation.

Enforcement action date(s): NA

Enforcement action notes: The audit found no violations and no unsatisfactory features.

Other notes: Inspection strengths: The audit report was well written and gave good details for
those aspects of the implemented program it discussed. The inspection consisted of two oversight
inspections of SIUs regulated by the city. The inspections covered both the regulated processes
where wastewater is generated and the wastewater treatment systems. From the descriptions of
both, one can tell the inspector knows a lot about wastewater treatment. The city was properly
advised on how to remove a facility from its Pretreatment program that is no longer an SIU
Inspection weaknesses: No inspection checklist was included with the narrative report so it could
not be determined if all implementation responsibilities had been evaluated. The report lists two
recent improvements the city has made to its program (local limits revised in 2011, Enforcement
Response Plan changes in 2012) but did not state if they had been submitted and approved by
MDNR. There was some confusion concerning Significant Noncompliance. Specifically, the
term technical noncompliance was used when what was meant was employing the use of the
technical review criteria (TRC) for calculating Significant Noncompliance. Applying the TRC
factor is one of the two ways data sets are evaluated to determine if a facility is in SNC. Lastly,
the city stated that at the time of the Pretreatment audit they did not have any industries in
noncompliance. Since they had issued Kraft foods a number of NOVs for minor pH violations,
by definition Kraft had to be in Infrequent Noncompliance at the very least. (A follow-up check
of the city's annual report for the time frame indicated they classified Kraft appropriately).

Poplar Bluff, Pretreatment Compliance Inspection (M00043648)

Inspection date(s) and # days to report: 04/04/2013 and 06/04/2013 (15)

Inspection notes: The inspection was conducted in two visits two months apart. Once completed,
the findings were conveyed to the facility within 15 days. The narrative portion of the report was
contained in a short letter to the facility. The inspection checklist was an attachment to the letter.
Enforcement action date(s): NA

Page 120 of 134


-------
Enforcement action notes: The inspection found the facility to be in compliance.

Other notes: Inspection strengths: A completed checklist was included. Two oversight
inspections were conducted of SIUs as part of the PCI.

Inspection weaknesses: There were a couple of confusing or contradicting statements made
between the letter narrative and the checklist. The letter stated that the two Gates facilities were
considered in SNC for metals limits in 2012. A statement was then made that appeared to state
that the permit limits were based on Categorical standards that did not apply. The attached
checklist listing the compliance status for the two Gates plants did not show them in SNC for
that time period. Did the inspector make the corrections? If so this should have been stated. Also,
Question 30 indicates that the city did not need to adopt local limits. However, it appears they
are including non-adopted limits in permits they are issuing. If they were not adopted, they
cannot be enforced. Furthermore, Question 37 indicates they compare local limits to Categorical
limits before issuing a permit. If the local limits were not adopted, then the city has no local
limits to compare to Categorical standards. These discrepancies need to be rectified.

Cape Girardeau, Pretreatment Compliance Inspection (M00050580)

Inspection date(s) and # days to report: 06/18/2013 (7)

Inspection notes: The inspection consisted of a cover letter, a brief summary of what was
reviewed, and the finding that the city was successfully implementing it approved Pretreatment
program. A copy of the checklist used during the PCI was attached to the transmittal letter.
Enforcement action date(s): NA

Enforcement action notes: No deficiencies or violations were found as a result of the PCI
Other notes: Inspection strengths: The report was turned around within one week. The inspection
checklist provided a top-to-bottom evaluation of all program implementation activities. The city
evaluates its local limits quarterly.

Inspection weaknesses: There was no narrative discussion outside a few general remarks made in
the June 25, 2013 transmittal letter. The checklist indicated that the city is considering taking
hauled waste from Republic landfill. If this is the same Republic landfill in St. Louis that has
caused concerns for St. Louis MSD, some discussion is warranted. There has been a change in
staff in Cape but this was not discussed. The checklist identifies that the city's Pretreatment
ordinance was modified on August 15, 2011, however, it cannot be determined if this change
was submitted to MDNR for review and approval. Question 2 of the checklist did not reflect an
approval date for this change.

Lebanon, Pretreatment Audit (M00089010)

Inspection date(s) and # days to report: 04/25/2013 (22)

Inspection notes: The inspection consisted of a two page narrative of findings with an attached
completed field checklist. A letter of transmittal conveyed the report to the facility within 30
days of the inspection. Two industrial user oversight inspections were conducted as part of the
audit.

Enforcement action date(s): NA

Enforcement action notes: No enforcement resulted from this inspection as the city was not
found to be in noncompliance.

Other notes: Inspection strengths: The report contained both a narrative covering salient findings
and a checklist documenting the total program activities. The inspector was savvy enough to
recognize that the city is prohibited by state statute to be able to fine greater than $500.

Page 121 of 134


-------
Inspection of the city's files could find no Solvent Management Plans that allows Metal
Finishing facilities to certify compliance with TTOs rather than sample. The city is required to
locate their copy or request a copy from the industry and ensure that the industries are
implementing them.

Inspection weaknesses: Two oversight inspections were conducted as part of the audit, however,
there was no discussion of their findings. The narrative notes that the city has had recent NPDES
permit violations for copper which the city does not believe is related to its industrial users.

There is no elaboration of how this might be so; e.g., are the copper NPDES limits so low that
domestic level copper discharges could have caused the violations? Was hardness taken into
consideration when the NPDES limit was developed? The inspector does, however, inform the
city that they need to determine the cause of the copper noncompliance. The checklist at
Question 30 states the city did not adopt local limits (they were evaluated in 1996) but at
Question 37 states that the city compares local limits to Categorical limits when issuing permits.
How can that be? The checklist states that 40% (0.96 mgd) of the city's 2.4 mgd flow is
industrial but the flows reported on the table of SIUs only add up to 0.1184 mgd, or 5%.

Joplin, Pretreatment Compliance Inspection (M00103349)

Inspection date(s) and # days to report: 05/09/2013 (29)

Inspection notes: The inspection report consisted of two page narrative with attached completed
field checklist. During the PCI one oversight inspection was conducted.

Enforcement action date(s): NA

Enforcement action notes: No violations were found during the PCI that warranted enforcement.
Other notes: Inspection strengths: The checklist contained an attached table of all enforcement
actions taken by the city for the period covered by the PCI. The narrative contained a detailed
description of the industrial base and how the number of industrial contributors to each plant.
The report was issued in a timely manner.

Inspection weaknesses: Because the checklist does not cover observations made during the
oversight inspection it should have had more coverage in the narrative. The checklist indicates
that the city's Sewer User Ordinance was modified in 1998, however, there is no record at
Question 2 that this modification was approved by the MDNR. The narrative states that Jasper
Products caused the city's Shoal Creek plant to violate its NPDES permit. According to the
General Pretreatment Regulations, this constitutes Significant Noncompliance
[403.8(f)(2)(vii)(C)], however, in the table of industries and compliance status, Jasper Products is
shown to be in full compliance. Also, Jasper's interference is not documented at Questions 28
and 29 of the checklist.

St. Joseph, Pretreatment Audit (M00023043)

Inspection date(s) and # days to report: 09/12/2013 (160)

Inspection notes: Inspection report consisted of a one page narrative with an attached completed
field checklist.

Enforcement action date(s): NA

Enforcement action notes: No enforcement taken as a result of this PCI, however, the city was
instructed to locate its missing SIU inspection reports and provide a copy of the cover page and
compliance determination to MDNR by March 13, 2014

Other notes: Inspection strengths: The MDNR required submission of documents that could not
be found during the inspection.

Page 122 of 134


-------
Inspection weaknesses: The table of sampling frequencies at Question 29 cannot possibly be
correct. The checklist states that the city's BOD and TSS limits are not technically derived,
however, they are enforced as such. This is a program deficiency that needs to be corrected.
Question 63 states that there are no industries from the last reporting period in SNC, yet the table
of industries on page 13 shows three. These three industries are listed at Question 67 as having
received Verbal Telephone Notifications for being in SNC. Does this follow the city's ERP for
facilities in SNC? It is almost certain that the city's response does not.

Maryville, Pretreatment Compliance Inspection (M00033286)

Inspection date(s) and # days to report: 09/25/2013 (147)

Inspection notes: The inspection report consisted of a brief two page narrative with the
completed field checklist attached. One SIU oversight inspection was conducted. The PCI
concluded that the city is properly implementing and maintaining its Pretreatment program.
Enforcement action date(s): NA

Enforcement action notes: No violations were found during the PCI that warranted enforcement.
Other notes: Inspection strengths: Good description of the oversight inspection including setting
up for sampling and what pollutants to expect in the effluent. The attached PCI checklist was
informative and completed coverage of the PCI that the narrative did not.

Inspection weaknesses: Two SIUs were in SNC in the second half of 2012 yet no enforcement
actions were listed as having been taken. Was this an oversight by the inspector or is the city not
following its Enforcement Response Plan? From the transmittal letter and the narrative, it does
not appear that a representative from the city was present, or copied on the report. Since this is a
contractor-run program, day-to-day implementation activities (inspections, sampling, data
evaluation, permit drafting, etc.) can be performed by the contractor but enforcement and permit
issuance cannot. Future inspections should include city participation or a comprehensive picture
of program implementation is not achieved.

Pretreatment File Review Summary

This was the first Program Review conducted by the EPA since MDNR transitioned from a
Central Office based Pretreatment audit and PCI program to one where the Regional Offices
conduct the inspections. The transition appears to have gone fairly smoothly, as least for the four
Regional Offices that reported conducting PCIs, audits, or Pretreatment industrial inspections in
FFY 2013. As one would expect, there are differences in implementation from one Regional
Office to another. Nevertheless, each RO shows a fundamental understanding of the Pretreatment
program and its implementation demands.

When reviewing the inspection reports, quite a number of inspectors noted that the city's had the
ability to level penalties up to $1000 per day per violation. At the time the Pretreatment
programs were approved in Missouri, only St. Louis MSD had legal authority granted by state
statute to assess penalties for that amount. In fact, third and fourth class cities are still capped at
$500 per day. While it was not part of this Program Evaluation to determine which cities in
Missouri are third or fourth class and limited in penalty assessment, it is recommended that
MDNR conduct this exercise and create a list of those facilities that claim to have $1000 penalty
but that are not conforming to the state statutes limiting them.

Page 123 of 134


-------
The SRF checklist poses questions on whether the Pretreatment inspections are in ICIS (and by
extension, ECHO). No Pretreatment audits, PCIs, or industrial user inspections are being
uploaded into ICIS. For Pretreatment industrial user inspections, this is understandable as they
are not given NPDES permit numbers. However, all approved Pretreatment Program Cities have
the ability in ICIS to accept audit or PCI inspection dates as well as data elements for important
inspection findings.

Page 124 of 134


-------
Appendix D: MDNR Response Letter

STATE Of MlSSftURl	JerenMjfo W. (Jay) Nifcoft. CiOM»n« * -Sara Porker Pauley, Dirccnw

DEPARTMENT OF NATURAL RESOURCES

www.dn r. rno.gciv

si? 1sm

Ms. Karen A. Fioumoy, Director

Water, Wetlands and Pesticides Division

United States Environmental Protection Agency, Region 7

J1201 Rentier Boulevard

Lenexa, Kansas 66219

Dear Ms. Fioumoy:

This letter is in response to your July 31, 2014 letter requesting review of the draft integrated
report of the Missouri Department of Natural Resources permitting and enforcement program for
federal fiscal year 2013. The following represents the Department's comments on findings as
well as additional explanation where necessary,

Basic Facility Information and Permit Application

Category I - Federal rules require that permit applications for major Publicly-Owned Treatment
Works (POTWs) include three priority pollutant scans (40 CFR 122,21{j)(4) and 40 CFR 122,21
Appendix J), but the Department is only requiring one scat) from major POTWs. The
Department recently modified its Form B2 to require major POTWs to submit three priority
pollutant scans. See http://dnr.mo.nov/fomW780- \ 805-f.pdf which identifies on Page 7 the
requirement to submit three scans.

Water Quality-Rased Effluent Limitation!!

Category 1 When calculating reasonable potential, it appeared that the applieatiori data
indicated that it was not being used in the analysis. The Department has reviewed this finding
with permit writing staff and will work to ensure that all appropriate and available data is used in
reasonable potential analysis Calculations in future permit decisions.

Category 1 - The factshect stales that limitations within the permit for the reissuance of this
permit conform to the an Li-backsliding provisions of Section 402(d) of the Clean Water Law and
40 C.F.R. Part 122,44; however, several effluent parameter limitations have changed or been
eliminated without an explanation as to how they conform to the backsliding provision. The
Department has revised the permit templates used by permit writers requiring that detailed
justification for any less stringent requirement or limitation is needed in instances of allowable
backsliding.

Monitoring and Reporting

Category 2 The Department is making progress in permitting for water treatment plants
(WTPs). The U.S. Environmental Protection Agency (LPA) urges a robust approach to setting
Best Professional Judgment-based technology limits, and in consideration of water quality-based
limits. The Department should assure that WTPs are submitting complete applications with
representative monitoring, Reissued permits, even those accompanied by orders, should have

w

Page 125 of 134


-------
Ms, Karen A. Flournoy
Page 2

representative monitoring. The Department has reviewed this finding with permit writing staff
and will work to ensure that representative monitoring is included in future WTP permits and
applications and that applications for said permits are complete.

Nutrients

Category 2 - EPA views the adoption of numeric criteria as an important tool for effective water
quality management of nutrient pollution. The Department needs to continue development of
numeric criteria for nutrients for the state's waters. The Department is preparing a rulemaking
for lake nutrients at this time and encourages EPA's permitting and standards staff to participate
in the process to assist the state in developing future implementation of the promulgated nutrient
criteria.

Pesticides

Category 3 - It suggests that in the reissued permit that the state addresses whether pesticide
discharges to special waters (e.g., Outstanding Natural Resource Waters and impaired waters)
are addressed differently than waters of the slate. The reissued permit should also address
discharges to endangered and threatened species and critical habitats and discharges near
drinking water intake structures. The Department will address these more sensitive settings
during the renewal of the pesticide applicator permit.

Pre treatment Permitting Activities

T he following are comments on the pretreatment permitting findings identified in the integrated
report,

Category 1 - Permits to implement pretreatment programs. It appears that the omission of the
pretreatment program was an error, but the cities are currently implementing pretreatment
program requirements regardless of the permit requirement. St. Peters and Farmington had new
programs and the permits have been modified to include this requirement. Sullivan and Moberly
permits are expired, so a modification of the permits will occur when the permits are renewed.
National Pollutant Discharge Rlimination System (NPDES) permits for Union, Wenlzville, and
Jefferson City will be modified to include the pretreatment program requirement as soon as
practical.

A note to the Department's electronic working file has been added to each NPDES permit file for
active programs to remind the permit writer to include the special condition to implement the
pretreatment program in the permit. This was completed earlier this year.

A note to the Department's electronic file will also be added for cities with inactive programs to
remind the permit writer to include the inactive status information in the factsheet. Reactivation
will be triggered when the city reports that a new industry has located in the city pursuant to
NPDES Permit Standard Conditions, Part II. The city's pretreatment ordinance will be reviewed
at that time and re-activation requirements will be communicated to the city. The NPDES permit
may be reopened to incorporate a requirement to develop a pretreatment program if the current
program is not sufficient.

Category 1 - Reevaluate local limits. A requirement to reevaluate local limits in accordance
with 40 CFR 122.44^X2Xii) has been added (since about May 2013) to the Special Condition
inserted into permits for pretreatment program cities. The federal requirement is to "Provide a

Page 126 of 134


-------
Ms. Karen A. Floumoy
Page 3

written technical evaluation of the need to revise local limits under 40 CFR 403.5(c)(1),
following permit issuance or reissuance." This language does nut give a due date for the
submission. Our permit language requires a submission along wilh the permit application. The
evaluation can be done earlier to meet a compliance schedule, and the time limit is intended to
require a submission by the end of the permit period. Alternate language can be considered to
include both of these ideas.

Category 3 - Fact sheets for POTWs in cities without a pretreatment program should state that a
program is not required and describe discharging industries. The factsbeets already have a
paragraph on pretreatment and a check box to indicate whether a pretreatment is required or not.
The permit application should contain a list of significant industrial users. We believe this is
sufficient documental ion.

Other Pretreatment Permitting Comments:

Standard Conditions Part II has a typographic error mentioned of Page 40 of EPA's State Review
Framework Report. The word "Special" will be replaced with the work "Standard" in Lhe title of
Standard Conditions Part II.

Concentrated Animal Feeding Operation (CAFO) Permitting Activities

The following are the responses and comments on CAPO permitting findings identified in the
integrated report.

Background - Prior to January 28, 2013 NPDES permits, both individual and general (MOGOl),
were the only permit options available for CAFOs in Missouri. NPDL.S permits have allowances
for a discharge from an uncovered liquid storage structure due to a catastrophic storm or chronic
weather event as long as they have been operated and maintained according to permit
requirements. Deep pit swine and dry litter poultry CAFOs that do not have uncovered liquid
storage structures were also covered under the MOGOl permit and were not allowed to
discharge.

Since all Class I (large) CAFOs in Missouri arc required to be permitted whether they discharge
or not, a state no-discharge permit (MOGS1) was developed and the master general permit
template was issued on January 28, 2013 as a third permitting option. All CAFOs are required
by state regulations to be designed, constructed, operated, and maintained as no-discharge. Each
operation was allowed the opportunity to determine if they wanted to be covered by a NPDES
permit or the MOGS1 permil based upon the type of manure handling system and management
practices of the operation. During permit renewals in 2013, approximately 120 CAFOs with
uncovered liquid storage structures, and all Class IB and smaller deep pit swine and dry litter
poultry CAFOs opted for the MOGS1 permit. Without stricter stale regulations, these operations
that declared themselves as "no-discharge" would not be covered by a federal operating permit
of any type and otherwise are unregulated,

The MOGSl permit contains the same requirements as NPDES permits for land application area,
manure transfers, mortality management, inspections, recordkeeping, nutrient management
plans, and most requirements for annua] reporting. The permit requirements for the production
area arc more stringent as there is no allowance for a discharge due to catastrophic storm or
chronic weather event.

Page 127 of 134


-------
Ms. Karen A. Floumoy
Page 4

Category 1 - The Department's definition of"process wastewater must be as stringent as the
federal regulation at 40 CFR 122.23(bX?). The definition must include water directly and
indirectly used in the operation of a CAFO.

The definition of process wastewater in the current rule revisions (10 CSR 6.300) is preparing to
change the language to read:

"Process wastewater—Water which carries or contains manure, including manure
commingled with litter, compost, or other animal production waste materials used in the
operation of the CAFO. Also includes water directly or indirectly used in the operation of
the CAFO for any or all of the following: spillage or overflow from confined animal or
poultry watering systems; washing, cleaning, or flushing pens, bams, manure pits, or other
CAFO facilities; and water resulting from the washing, or spray cooling of confined
animals. Process wastewater also includes any water which comes into contact with any
raw materials, products, or byproducts feed, milk, or eggs, or bedding."

Category 1 - All uncontaminated storm water originating outside of the production area footprint
should be diverted to prevent contact with manure, litter, or process wastewater as specified in
CFR 40 §122.42 (e)(iii). Any process wastewater/storm water that comes in contact with these
materials as specified in 40 CFR 122.23(b)(7) must be collected and disposed of in a manner that
is consistent with the Clean Water Act. Authorization of discharges of process wastewater must
be pursuant to a NPDFS permit and constituent with the effluent limitation guidelines.

Diversion of clean water front the production area is required in 10 CSR 20-6.300(5)(C} as well
as in the MOG01 and MOGS1 permits. In addition, CFR 40 5122.42(e) is incorporated in state
regulations for NPDES permits in 10 CSR 20-6.300(3)(A )2 and into the MOG0I permit in
Applicability 1. The requirement of ammonia testing in secondary containments is only included
in individual NPDES permits. Most of these permits will be renewed in 2015 and the limitation
of 2.5 for ammonia will be reviewed at that time.

Category 1 - Applications for CAFO operating permits must be completed, A complete and
timely notice of intent indicates the owner or operator's intent to abide by all conditions of the
permit and fulfills the requirements of a permit application.

The Nutrient Management Plan (NMP) portion (Parts 5-11) of Form W CAFO operating permit
application is intended to be used as an option for operations for an export only NMP or to
supplement the NMP that they have developed. If the operation has submitted a NMP that meets
regulatory requirements, then these parts of the application are optional. A NMP is required with
all NPDES permit applications and with al) new MOGS1 permit applications.

The files for MOGS10174 AR Curtis were reviewed. The August 12,2012 application did have
Parts 5-11 completed. Part 8.1 asking if animals had contact with waters of the state was
checked yes, but on the application for the 2011 renewal was checked no and stated that animals
were confined to buildings. On July 31,2014 Mr, l odd Curtis, owner, was contacted and stated
he had misunderstood the question. Mr. Curtis confirmed that animals are confined to buildings
at all times and do not have access to waters of the state.

Page 128 of 134


-------
Ms. Karen A, Floumoy
Page 5

The files for MOGS10423 Ponderosa LLC were reviewed. Parts 5 and 7-11 of the April 15,
2013 application were not completed. The operation did have a current NMP on file that was
submitted as part of a December 12. 2012 construction permit application as required hy 10 CSR
20-6.300, Since the NM P was submitted with the construction permit application and met
regulatory requirements, it was not required with the operating permit application for renewal
and modification.

The files for MOGS10428 Danny Bevill were reviewed. Part 8.1 asking if animals had contact
with waters of the stale was checked yes, but on the application for the 2011 renewal was
checked no and stated that animal were confined to buildings. On July 31,2014 Mr. Danny
Bevill, owner, was contacted and stated he thought the question pertained to the public drinking
water supply for the operation. Mr. Bevill confirmed that animals are confined to buildings at all
times and do not have access to waters of the state.

Category 1 - The Wet Weather Management Guide (PUB2422) contains practices that minimize
discharges from land application areas during wet weather events. Implementation of the Wet
Weather Management Guide at CAFOs without an NPDES will not negate Clean Water Act
liability. It should either be removed from the slate permit or revised based on the no-discharge
requirement.

The Wet Weather Management Practices guidance was revised earlier this year as part of the
Departments' efforts to update all factsheets and guidance sheets. The revised version contains
the following language, "While this guidance has provisions for land application practices that
are not typically allowed, there shall be no discharge as a result of these applications from land
application fields."

10 CSR 20-6.300(4)(A)4 describes Best Management Practices (BMPs) that must be followed in
order for a discharge from a land application area undeT operational control of the CAFO owner
to be considered an agricultural stormwater discharge. These BMPs include:

•	Develop and implement a NMP;

•	Minimize phosphorus and nitrogen transport from the field to surface waters in
compliance with the Missouri Concentrated Animal Feeding Operations. Nutrient
Management Technical Standard:

•	Annual manure analysis and soil analysis every five years;

•	Follow minimum land application setback distances; and

•	Applications are conducted in a manner that prevents surface runoff.

If these BMP requirements are not met, a discharge resulting from a land application under any
condition or permit coverage, does not meet the agricultural stormwater exemption.

Element 1 - Data; Finding 1*1: The Department did not batch any inspection or enforcement
data into the Integrated Compliance Information System-National Pollutant Discharge
Elimination (ICTS-NPDES) for FFY13, and does not consistently batch accurate Discharge
Monitoring Report (DMR) data. EPA recommends: 1} The Department should continue to
identify necessary data flows from MoCWIS to 1C1S-NPDES to enable complete and accurate
batching of DMR, compliance monitoring and enforcement data; 2) The Department should

Page 129 of 134


-------
Ms. Karen A. Flournoy
Page 6

begin to batch all elements to 1CIS-NPDES by December 31,2014, and 3) The Department
should submit to EPA a timeline within 30 days after State Revolving Fluid (SRF) final izat ion
documenting actions to correct the batch upload issues, and report each quarter on progress,

The Department's Water Protection Program is currently working on two major enhancements,
which arc Batch I and Batch 2 & 3. The Department has determined that many of the permit
data rejections from EPA's 1CIS-NPDES database are associated with OMRs from permits that
have been modified in the Department's MoCWIS database. The Batch 1 enhancement will
change how Missouri submits permit modifications to IC1S, and resolve many of the data
rejections. Discovering the root cause of these rejections, and a solution, took a considerable
amount of time. Completion of this enhancement is currently under discussion with OECA. T he
Batch 2 & 3 project will address submitting compliance monitoring and enforcement data to
ICIS- The Department has an active contract with a third-party software provider to accomplish
this task. The Department had anticipated completion of this task in FFY 2014, but delays with
the third-party provider and Department resource constraints has delayed completion of the
project It is anticipated that this project will be completed during FFY 2015.

Element 2 - Inspections; Finding 2-1: The Department completed inspection targets for
NPDES program area in FFY 2013 with one exception, Major Combined Sewer Overflow
inspections; Finding 2-2: The Department's inspection reports did not consistently identity1
pertinent facility information, compliance issues and compliance determinations. EPA
recommends: 1) The Department revise their inspection report drafting process so basic
information regarding the facility is captured, including correct permit numbers, facility address,
description of facility and inspection date, 2) Define facility layout, process train and number
outfalls in Core NPDES reports, 3) Define storm water BMPs in land disturbance reports, 4)
Include aerial facility layouts with descriptions of notable features for ail wastewater treatment
plant and CAFO inspections, 5) Complete a CAFO inspection checklist for each CAFO
inspection, and 6) Clearly document if unpermitted CAFOs are discharging manure, litter or
process wastewater, and are subject to NPDES permitting regulations, and 7) Report to EPA
each quarter the progress made to correct inspection report issues.

In response, the Department states that during review of EPA's comments the Department
noticed that inspection staff occasionally coded compliance monitoring activities incorrectly in
MoCWIS; this affected the sample that EPA reviewed. For instance, several of the CAFO
reports were documenting spill investigations rather than scheduled compliance inspections.

This could explain some of the "missing" elements documented during the review. Department
stall use a CAFO inspection checklist when conducting compliance inspections, and includes the
checklist with the inspection report. When conducting response to water pollution emergencies
(e.g., a spill), staff do not use or attach a CAFO inspection checklist. Some of the inspection
reports reviewed by EPA were associated with spills; therefore, the report did not include a
checklist. Department staff use an automated reporting system to generate reports. The
Department currently has an internal workgroup updating and standardizing the templates used
by this system for all media (i.e., Water Pollution, Drinking Water, Air, Hazardous Waste, Solid
Waste, etc.) Staff will ensure that the templates include these required items. The Department
will provide staff with a memorandum reminding staff to include all required information in each
inspection report and enter inspection data into MoCWIS properly. These items are expected to
be completed by March 2015. In addition, the Department will provide EPA with a copy of the
inspection memorandum noted above following its completion in March 2015,

Page 130 of 134


-------
Ms. Karen A. Flournoy
Page 7

Element 2 — Inspections; Finding 2-3: The Department files do not contain any information
about how inspection checklist or field notes were retained, EPA recommends the Department
revise their compliance manual to include details which clearly define how field notes arc
managed, and submit the Department's report to LP A forty-five days after receiving final SRF
when note collection policy has been instituted.

The Department responds that field notes and checklists are generated during inspections and
used to prepare the final inspection report. Once the inspection report is finalized, the field notes
and checklists are destroyed. The checklists mimic the electronic database checklist, which is
used to generate automated reports; therefore, once the data has been transferred from the
checklist to the electronic database, there is no need to retain a paper copy of the checklist.
Likewise, pertinent information contained in the inspection field miles is wholly incorporated in
the final inspection report, which is retained in the Department's file for the facility ; therefore,
there is no need to retain paper copies of field notes. The Department will update the Operations
Manual, by March 2015, to describe how field notes and checklists shall he managed. The
Department will notify HPA following completion of revisions to the Operations Manual, which
is expected to occur by March 2015.

Element 2 - Inspections; Finding 2-4: Inspection reports were not issued within thirty days, or
ten days for land disturbance, EPA recommends the Department develop a standard operating
plan (SOP) which will implement the timeline goals specified in the Operations Manual, and
report to EPA on a quarterly basis the percentage of reports issued within specified timelines.

The Department will update the Operations Manual to provide an SOP for timelines for issuing
inspection reports based on: 1) the type of inspection, 2) the severity of violations documented
during the inspection and 3) the availability of sample results. The Department will strive to
issue all inspection reports within thirty days from the date of inspection. If sample results are
not received within this timelVame, the results can be sent under a separate cover letter upon
availability. The Department will develop a report generated from MoCWlS, by March 2015, to
ensure inspection reports are issued in a timely manner. This report can be used to provide EPA
with quarterly updates until such time that the ICIS Batch 2 & 3 projects are complete.

Element 3 - Violations; Finding 3-1: Files reviewed showed the Department does not
consistently or accurately identify single event violations as Significant Noncompliance (SNC)
or noil-SNC. EPA recommends: 1) Department staff should include a statement in its inspection
reports, data system and official file identify ing that the violations are SNC of state's regulations,
2) SNC determination should be entered into MoCWIS so that Department personnel can
identify facilities which are out of compliance with environmental regulations, 3) The
Department should create a plan of action which will result in SNC determinations made by
inspectors. 4) SNC determinations should include single event violation codes that are entered
into MoCWIS/lCIS, and 5) The Department should report to LPA on a quarterly basis the steps
taken to complete SNC determinations.

Department inspectors are instructed to evaluate violations using guidance provided in the
Compliance Manual to determine whether or not to issue a Letter or Warning (LOW) or Notice
of Violation (NOV) to a facility. The follow-up response, or compliance monitoring action (i.e.,
issuing an LOW or NOV), is largely dependent upon the severity of the violation and/or (he
acute or chronic nature of the violation. Violations determined to be SNC are issued an NOV

Page 131 of 134


-------
Ms. Karen A. Floumoy
Page 8

unless the permittee has previously been informed of the violation and is taking reasonable
action io resolve the violation. The Department will update the Compliance Manual and
Operations Manual to require inspectors to specifically label SNC violations as SNC in
inspection reports. These manual updates are expected to be completed by March 2015. The
Department has a current data enhancement project to add a flag in the MoCWlS database to
identify1 single event violations. This flag will be transmitted as a single event violation code to
1CIS as part of the data batch projects discussed in the state's response to Finding 1-1. "Phis
enhancement is expected to be completed during FFY 2015. Additionally, Department staff can
currently generate a report from MoCWlS to identify facilities that have been issued LOWs and
NQVs; therefore, staff can identity' facilities that are out of compliance using data already
managed by MoCWlS. Once the MoCWlS enhancement discussed immediately above is
complete, staff*will have the capability to generate a report- from MoCWlS that identifies all
facilities having violations with single event violation flags. The Department will notify' EPA
following completion of the manual updates discussed above arid single event violation
enhancement in MoCWlS is complete.

Element 3 - Violations; Finding 3-2: Department pretreatment compliance inspections did not
consistently identify' arid determine the compliance of the inspected facility. Department staff
appears to need additional experience and/or training in pretreatment regulations as applied by
approved pretreatment programs, EPA recommends the Department report quarterly on the steps
taken to increase inspector's knowledge of pretreatment regulations such as trainings,
presentations, participating in joint inspections with EPA or other methods. EPA suggests we
work to create a capacity building schedule to create achievement milestones, such as training
accomplished in 3 months, ten joint inspections in FY2015.

The Department held a training session on pretreatment regulations and inspections, including a
discussion on determining SNC, during the 20! 4 Clean Water Regional Office/Central Office
Coordination meeting on August 19-21,2014. Department staff are currently drafting language
for the Operations Manual that will provide guidance to inspectors on conducting and writing
inspection reports for pretreatment inspections. This guidance is expected to be completed by
March 2015. Department staff would be interested in participating in joint inspections with
EPA. The Department will notify' EPA following finalization of this guidance document.
Additionally, the Department would be interested in hosting a training event if EPA would be
interested in providing pretreatment training. The Department is agreeable to discussing a
capacity building schedule with EPA, and this could be developed for FY 201(5 since the FY
2015 inspections have already been scheduled.

Element 4 - Enforcement; Finding 4-1: The Department's infbraia.1 and formal actions do not
always bring a facility back into compliance, EPA recommends the Department: 1) escalate its
enforcement response if a facility is not coming into compliance (11 of the 12 informal
enforcement actions that did not result in a return to compliance or escalated enforcement were
sent to the same facility. Great Western Motel.), 2) submit to EPA a statement about how the
escalation timeline is either appropriate or inappropriate, and 3J should review their escalation
policy by December 31, 2014.

The Department's escalation policy is provided in the Compliance Manual, and staff are familiar
with this guidance. On Great Western Hotel, the enforcement actions taken were LOWs for
failure to submit complete, accurate or timely OMRs, Following several unsuccessful attempts

Page 132 of 134


-------
Ms, Karen A, Flournoy
Page 9

through conference, conciliation and persuasion (i.e., CC&P, which is required by stale statute),
the matter was referred to the Water Protection Program's Compliance and Enforcement Section
in March 2013. Following unsuccessful attempts to resolve violations at the enforcement level,
the matter was referred to the Attorney General's Office in June 2014.) The Department feels
that the escalation policy outlined in the Compliance Manual is appropriate. Ihc Compliance
Manual provides guidance on when to issue LQWs and NOVs, and when to refer the matter to
the Compliance and Enforcement Section or the Attorney General's Office. The Compliance
Manual also allows for some discretion regarding escalating enforcement due to case-specific
circumstances, e.g., if the facility has already initiated corrective actions that will resolve
violations in a reasonable timeframe.

In general, though, the escalation policy is as follows:

1.	First violation - LOW.

2.	Second occurrence of violation - NOV,

3.	Third occurrence of violation, or unsuccessful attempts to resolve the violations through
CC&P within 90-1 BO days - Enforcement Action Request.

4.	Unsuccessful attempts to resolve the violations through an out-of court agreement - Referral
to the Attorney General's Office.

The Department will draft a memorandum to regional office staff to remind them of the
escalation policy outlined in the Compliance Manual.

Element 4 — Enforcement; Finding 4-2: The AGO appears to slow the process of concluding
environmental cases. EPA recommends the Department submit a quarterly report to EPA
discussing the actions taken to address timeliness at the AGO, and the Department and AGO
submit a work plan that includes information on enforcement timelines and steps taken to
address delays.

Cases in litigation do not lend themselves to quick resolution (i.e,. less than a year or two from
referral to execution of a legal resolution). AGO has experienced an increase in case load as well
as a reduction in staff over recent years, which has affected resolution timeframes, but the AGO
feels that the amount of tiinc spent negotiating settlement and litigating matters has been
appropriate. The Department will request that the AGO develop a work plan that outlines
timeframes for milestones and resolution goals for referred cases.

Element 5 - Penalties; Finding 5-1: The Department's initial penalty calculations include
gravity; however, economic benefit is not considered by the state. This is a repeat finding from
the EPA SRF review from FFY 2009. EPA recommends the Department amend the penalty
matrix worksheets to include a discussion of economic benefit. In FFY 2015, EPA will review
the amended penalty matrix worksheets to determine if economic benefit is being considered by
the Department. EPA recommends the Department submit a report to EPA on quarterly basis of
steps taken to address economic benefit considerations when calculating penalty actions.

The Department has amended and implemented the penalty matrix worksheet to expand the
discussion on and consideration of economic benefit. The revisions are based upon 10 CSR 20-
3.010(3)(D). Economic benefit including delayed and avoided costs added to the penalty.
Determination made by the Department using an economic benefit formula that provides

Page 133 of 134


-------
Ms. Karen A. Floumoy
Page 10

reasonable estimate of the economic benefit. Economic benefit may be excluded if one of the
following occurs:

1.	Economic benefit is insignificant;

2.	Compelling public concerns that would not be served by taking the case through
administrative appeal or circuit court litigation; or

3.	Unlikely Department would be able to recover economic benefit based in litigation based on
the particular case.

Note: The Department completed this task prior to finalization of the SRF response.

Element 5 - Penalties; Finding 5-2: The Department's documentation for penalty actions do
not document the difference between proposed and final penalty assessed penalties. EPA
recommends the Department: I) ensure that the issued penalty matches to calculated penalty, and
if penalty differs, the Department should amend the office file to describe penalty difference, and
2) report to EPA on a quarterly basis ihe number of penalties that were issued at a different
number than the calculated amount and that the official file has been updated to reflect the
change.

The Department does not routinely issue penalties through unilateral orders; rather, the
Department calculates a civil penalty based on the violations documented and negotiates the
penalty amount paid. The negotiated penalty amount is included in a negotiated agreement.
Department enforcement files contain correspondence between the Department and the
responsible party documenting any reduction in the penalty calculated. The l>cpartment
developed and implemented a new process for enforcement staff'to document reductions in
penalty amounts through negotiations. Negotiation discussions between the case manager, unit
chief and section chief are documented in a memorandum-to-file each lime a penalty offer
deviates from the originally calculated and approved penalty. The Department initiated the
reporting protocol prior to finalization of the SRJF response.

Element 5— Penalties; Finding 5-3: Department documentation consistently documented the
penalty payment information, EPA noted the Department meets or exceeds these expectations.
No response is needed.

Thank you for the opportunity to review the findings of the permitting and enforcement program
reviews. We trust these comments are helpful. If there are any questions, please contact me at
Department of Natural Resources, Water Protection Program, P.O. Box 176, Jefferson City.
Missouri or (573) 751 -6721.

Sincerely,

WATER PROTECTION PROGRAM

John Madras
Director

JM/lsm