£% rOA United States

Environmental Protection
^^^1 #m Agency

Region 9 Enforcement and Compliance Assurance Division (ECAD)
INSPECTION REPORT

Inspection Date(s):

11/17-18/2021

Inspection Announced: No

Time:

Entry: 12:55 pm on 11/17

Exit: 11:00 am on 11/18

Media:

Air

Regulatory Program(s)

Title V, Part 71 -Stationary Source/Biomass Electric Power Generation



Company Name:

Desert View Power Inc. (an affiliate of Greenleaf Power LLC)

Facility or Site Name:

Desert View Power Plant

Facility/Site Physical Location:

62-300 Gene Welmas Drive

(city, state, zip code)

Mecca, CA 92254

Geographic Coordinates:

33.586, -116.088

Mailing address:

2600 Capitol Ave., Suite 430 (Corporate HQ)

(city, state, zip code)

Sacramento, CA 95816

Tribe/County:

Cabazon Band of Mission Indians (Riverside County)

Facility/Site Contact and
Personnel Participating in
Inspection:

Kevin Lawrence, Plant Manager

(760) 262-1644; klawrence@greenleaf-power.com



Facility/Site Identifier:

FRS110022450729

Media Number:

ICIS-AIR CA00000006065CAB27 (09000000CAB0DP1)

NAICS:

221117, Biomass Electric Power Generation

SIC:

4911, Electric Services



Inspector(s):

Andrew CHEW,
Lead

ENF-2-1

Enforcement Officer/Environmental
Engineer

chew.andrewfSeoa.gov;
(415) 947-4197

Yvezee LAPADA

ENF-2-1

Enforcement Officer/Physical Scientist

LaDada.YvezeeNikitafSeoa.gov:
(415) 947-8700



Additional Persons Participating in Inspection: (None)

Mark Boucher, Corporate EHS Manager, Greenleaf Power LLC. Jonathan Lopez, Environmental Analyst, Cabazon
Band of Mission Indians. Javier Aceves, Environmental Manager, Cabazon Band of Mission Indians. Kenneth
Dudash, Air Quality Inspector, South Coast Air Quality Management District.



Inspection Report Author:

Andrew Chew, Lead Author

A MHDP\A/ rLICU/ Digitally signed by AN DREW CHEW
ANUKtW LrlhW Date: 2022.01.19 15:02:09-OS'OO'

ENF-2-1

Enforcement Officer/
Environmental Engineer

chew.andrew(®eoa.gov
(415) 947-4197

Supervisor Review:

Roshni Brahmbhatt

Brahmbhatt, Roshni

ined by Brahmbhatt, Roshni
01.19 19:28:19-08'00'

ENF-2-1

Section Manager

brahmbhatt.roshnifSeoa.gov
(415) 972-3995


-------
A	United States

t Agency	Region 9 ECAD	Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

SECTION I - INTRODUCTION
Purpose of the Inspection Objective

The purpose of this on-site Full Compliance Evaluation (FCE) was to determine the facility's compliance with
applicable stationary source requirements and prohibited acts promulgated through Title I and Part 71 of the
Clean Air Act (CAA). Inspectors of the Air Section of the Enforcement and Compliance Assurance Division in EPA
Region 9 led the inspection. Air quality inspector Kenneth DIJDASH of the South Coast Air Quality Management
District (SCAQMD) accompanied EPA inspectors by invitation throughout the duration of this inspection (see also
Monitoring and Enforcement Agreement dated May 10, 1989 concerning relevant authorities). Two
representatives of the Cabazon Band of Mission Indians (CBMI) - Environmental Analyst Jonathan LOPEZ and
Manager Javier ACEVES - had been invited for the duration of our inspection, but were present at the opening
and closing conferences only. This inspection had been unannounced.

Opening Conference

The five of us, - EPA Inspectors CHEW and LAPADA; SCAQMD Inspector DUDASH; CBMI Analyst LOPEZ and
Manager ACEVES - arrived at the front office of Desert View Power's facility at 62-300 Gene Welmas Drive, Mecca,
at 12:55 pm local time on November 17, 2021. The facility is on land within CBMI boundaries.

Photograph 1: View of front office entrance at 62-300 Gene Welmas Drive, Mecca, CA 92254, identifying Desert

View Power, Inc.'s location.

As the inspection team was waiting at the front entrance of the business office, a facility representative in a work
uniform walked toward us at 1:05 pm. He greeted us and introduced himself as Kevin LAWRENCE. Inspector CHEW
told him that we were there to conduct an unannounced Clean Air Act inspection and asked him if we could speak
to a manager. He replied that he was the plant manager. Inspector CHEW asked Mr. LAWRENCE for a conference
room where we could sit and explain the purpose of our visit.

2


-------
£% rOA Un'ted States

t Agency	Region 9 ECAD	Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

Inspector CHEW told him that we were there to conduct an unannounced inspection to determine the facility's
compliance with the CAA. Inspector CHEW presented his inspector credentials to Mr. LAWRENCE and Inspectors
CHEW and LAPADA gave him their business cards. Inspector CHEW explained that today's inspection was led by
EPA where EPA had extended the invitation to SCAQMD and CBMI to participate.

Inspector CHEW explained that it would take up an estimated 30 minutes of his time for the opening conference
and said he would start with questions about the facility's business and operations. Mr. LAWRENCE told us that
there were around 14 employees working at facility at this moment. Mr. LAWRENCE gave us his business card.
Inspector CHEW asked if the environmental health and safety manager would be joining us. Mr. LAWRENCE said
that would be him. After Mr. BOUCHER joined the opening conference by phone after Mr. LAWRENCE called him
at 1:12 pm, EPA inspectors reiterated the purpose of our inspection. Inspector DUDASH, CBMI Manager ACEVES
and Analyst LOPEZ introduced themselves to the participants of the opening conference.

Inspector DUDASH asked if it was okay for him to be on site and take photographs at the facility. Mr. BOUCHER
replied yes and that Mr. LAWRENCE would also take photographs simultaneously. Inspector CHEW said he would
send an email to Mr. BOUCHER to exchange each other's contact information. At 1:15 pm, Inspector CHEW
presented his inspectors credentials to Mr. LAWRENCE. Inspector CHEW also asked the facility representatives to
point out anything that had claims as confidential business information. Inspector CHEW did not hear any
statements making such claims.

Inspector CHEW asked if there was an environmental health and safety manager onsite at the facility. Mr.
LAWRENCE said there was a temporary environmental health and safety consultant from TRC consultants. There
used to be a person for that role on-site but no longer. He said they were slated to get one. Before this, it was Kit
Plessing about 6 months ago in June. Previously, the role had been with Jim Robertson and Russell Hoffman. For
now, this is handled by the plant manager.

Inspector CHEW asked if the facility performed regular inspections on the sorbent system servicing the common
stack. Mr. LAWRENCE replied yes, that monthly inspections occur at locations that include the baghouse, hydrated
lime system, and hopper.

Inspector CHEW asked for work orders related to the hydrated lime system that were available for us to inspect.
Mr. LAWRENCE said he would provide copies of recent work orders and told us that they were performed by the
plant operators and mechanics. However, as to physically checking (for suction pressure) at the hydrated lime
delivery at the lances, he said there was nothing internally planned. No written procedures had been in place or
identified during the time of inspection.

Inspector CHEW asked where the biomass fuels came from. Mr. LAWRENCE said the fuels came from agricultural
suppliers from local Coachella Valley. They included construction and demolition wood that had gone through a
sorting station. Examples included citrus trees that went through a grinder. There was also wood delivered from
the Big Bear area but predominately from Southern California. He said there were also different suppliers. Mr.
LAWRENCE said the deliveries brought in were accounted for, weighed, and tracked, such as how much had been
taken in locally per the facility's Title V air permit and where to get feedstock and keep the material.

Mr. LAWRENCE said the last time the facility used petroleum (pet) coke had been over 10 years ago. The pet coke
system had not been used for a long while. It would have been weighed and recorded but not with dates and
amounts. Also, the fuels would have been commingled before combustion for over several hours. Although the
silo or pet coke barn was still called as such, it stored only miscellaneous nonfunctioning machinery parts and tire-
derived fuel (TDF).

3


-------
rOA United States

Environmental Protection
^^^1 #m Agency

Region 9 ECAD

Desert View Power Plant
Inspection Report
Inspection Date 11/17-18/21

Mr. LAWRENCE said that the facility conducted a TDF sample burn this year when a fuel buyer brought in the TDF
and sample wood. He said the TDF sample was not "adverse" as 2.1 tons were burned. He said this was the first
time in four and a half years since TDF had not been burned since the TDF system had been closed off. Mr.
BOUCHER mentioned a lease agreement related to use of TDF.

Mr. LAWRENCE said the fuels burned included corrugated paper, municipal and construction woody waste, but
not railroad ties. The facility also did not burn wood treated with pesticides or creosote.

Inspector CHEW asked Mr. LAWRENCE if there were challenges in getting proper fuel. Mr. LAWRENCE said Steve
Kozlowski is the facility's fuel manager. Mr. LAWRENCE said that the criteria get tougher as the facility brings in
fuel locally. There is an emphasis on enforcement and monitoring. Inspector CHEW asked Mr. LAWRENCE for a
copy of the fuel analysis performed by Hazen -the company had been identified in the facility's source test report.
Inspector CHEW asked what value the facility had been using for the biomass fuel factor in the emission
calculations, and if it was using the EPA standard for dry standard cubic foot per million British thermal units
(dscf/MMBtu) [that is, based on wood (not to bark)]. Mr. BOUCHER replied that it was about 8890 to 9240
dscf/MMBtu based on Method 19 of Appendix A (Part 60). Inspected CHEW asked for a copy of an actual example
of emission calculations using the value and what was the value of the specific molar volume used (abbreviated
as SV as previously used in the facility's source test report). Mr. BOUCHER pointed out the CEMS data were taken
from the facility's CISCO System (Custom Instrumentation Services Corporation).

Mr. LAWRENCE continued that Greenleaf Power LLC bought the power plant in 2011 from Colmac Energy, Inc.
Greenleaf Power's company office was located in Sacramento. Mitchell Martin was the operations and
engineering director from that office. Mr. LAWRENCE said he had been the operations manager for four and a half
years at Desert View Power before becoming the plant manager. He said he became the plant manager in
September 2021.

Mr. LAWRENCE said there were two shifts - the day shift operated from 6:00 am to 6:30 pm. The night shift
between 6:00 pm to 6:30 am consisted of four people-a control room/operation supervisor, two plant operators,
and one heavy equipment operator. Day shifts on Mondays through Fridays consisted of two extra persons -
heavy equipment operator and scale house attendant/field yard operator. Mr. LAWRENCE said that the facility
was operating today at about 86% capacity. Manager ACEVES and Analyst LOPEZ said they would not participate
in the facility tour and would depart the facility for the day. However, they said they would join the next day for
the closing conference. Inspector CHEW said that EPA would send the facility a copy of the inspection report
around 70 days from the date of the on-site inspection (i.e., 70 days from November 18). Shortly after, the
inspection team adjourned the opening conference at about 2:20 pm.

Facility/Site Description

The following excerpt is incorporated from the Final Statement of Basis for the Final Part 71 Permit issued by EPA
Region 9's Air Permits Office in September 2020 (https://downloads.regulations.gov/EPA-R09-OAR-2020-0266-
0049/content.pdf).

The Source is a biomass electrical generation facility located approximately 40 miles southeast of Palm Springs in
Riverside County, California. The Permittee is under a long-term power purchase agreement to supply power to
the Imperial Irrigation District. The Permittee supplies no other entity with power, nor sells excess power to the
grid.

4


-------
£% rOA Un'ted States

t Agency	Region 9 ECAD	Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

The Permittee operates two 300 million British thermal unit per hour (MMBTU/hr) circulating fluidized bed boilers
that drive one Siemens steam turbine generator. The generator is capable of producing 47 megawatts (MW) of
electricity per hour. The boilers can operate together or independently. Each boiler is equipped with a
baghouse/fabric filter for particulate matter (PM) control, a thermal deNOx ammonia injection system for nitrogen
oxides (NOx) control and a limestone/Direct Sorbent Injection (DSI) system that injects limestone into the fuel
feed to the combustion chamber for sulfur dioxide (S02) control, and hydrated lime into the combustion gases
upstream of each fabric filter for S02 and hydrogen chloride (HCI) control.

The facility is permitted to burn agricultural biomass, municipal woody waste, commercial and industrial wood
residues, scrap railroad ties, corrugated paper waste, petroleum coke and TDF with certain restrictions. Natural
gas is used for boiler start-up and flame stabilization when required. The facility includes air pollution control
equipment, fire protection equipment, and material handling and storage facilities.

The inspection team did not materially inspect any other areas on-site or see any indications where other business
activities were being conducted beyond what had been described in the following observations.

SECTION II - OBSERVATIONS

At 2:20 pm, Mr. LAWRENCE led our walk-through of the plant that included EPA Inspectors CHEW and LAPADA;
and SCAQMD Inspector DUDASH. Inspector CHEW told Mr. LAWRENCE that Inspector LAPADA would take
photographs and invited Mr. LAWRENCE to use his camera to do so simultaneously to obviate the need to transfer
files of photographs later. Inside the engineering control room, Inspector LAPADA took photographs of visual
displays appearing on the video screens. There were recordings taken from their Continuous Emissions Monitoring
Systems. At the time, Mr. LAWRENCE said 171 to 172 thousand pounds per hour of steam were produced at each
boiler, generating about 38.6 megawatts. A module showed that CISCO stood for Custom Instrumentation Services
Corporation. The inspection team noted that the opacity recorded at that moment showed 1.83%.

5


-------
\C/EPA

United States
Environmental Protection
Agency

Region 9 ECAD

Desert View Power Plant
Inspection Report
Inspection Date 11/17-18/21

Photograph 2: View of visual display of CEMS real-time data in the facility's engineering control room.

Next, the inspection team climbed at least 8 flights of stairs at the boiler unit to view the ductwork for the selective
non-catalytic reduction (SNCR) system that uses ammonia to reduce nitrogen oxide emissions (NOx). Mr.
LAWRENCE said that the injection valves were 7% open at Boiler units 1 and 2. Inspector LAPADAtook photographs
of the Sensidyne gauges that showed readings of zero ppm ammonia. Inspector CHEW asked why the readings
said zero. Mr. LAWRENCE explained the next day that the Sensidyne gauges were used to measure the
concentrations of ammonia outside the system for worker safety reasons. They were not used to measure the
SNCR's effectiveness. A separate system controlled the SNCR's settings and parameters.

6


-------
A	United States

t Agency	Region 9 ECAD	Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

Photograph 3: View of Sensidyne gauge showing 0 ppm of ammonia at the SNCR unit.

Next, the inspection team went to see the pig trailers that stored the hydrated lime used for the control of sulfur
oxides (SOx) and hydrogen chloride emissions. Mr. LAWRENCE had been using a rubber mallet twice per shift per
day to assess when hydrated lime needed replenishing at the pig trailers. The echoing sounds made in the pig
trailer after impact with his rubber mallet would indicate to him if one of the four pods was close to being empty
and a work order be made for more hydrated lime deliveries. Mr. LAWRENCE said the feed rate of the hydrated
lime was set at 200 pounds per hour from the day bin to the baghouse inlet. Inspector LAPADA took photographs
of the day bin. The inspection team noted that the controller for each bin was set at a range of 80 to 120 to 150
pounds per hour.

7


-------
Region 9 ECAD	Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

Photograph 4: View of pig trailer storing hydrated lime.

Following that, the inspection team asked Mr. LAWRENCE to take us to the delivery system where hydrated lime
would be introduced into the combustion gases. Inspector CHEW asked Mr. LAWRENCE how the facility would
know if the lances used to introduce hydrated lime into those gases had been clogged. He replied that an operator
would inspect each of the four 6-foot long lances each shift and check for pressure suction to ensure delivery of
hydrated lime. He said 60 fabric filter bags had been replaced during the last monthly inspections during an
outage. The operators would clean the baghouse every 90 days using puffed air. There were 250 bags per module
and eight modules in the baghouse. Their system reading was 1.8% opacity earlier today. Inspector CHEW asked
to see the facility's recent work orders for bag replacement.

A	United States

Environmental Protection
Agency

8


-------
A	United States

t Agency	Region 9 ECAD	Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

Photograph 5: View of 6-foot lances that deliver hydrated lime to the combustion gases.

Next, the inspection team went to the pet coke barn. Mr. LAWRENCE said there were 2.1 tons of TDF sample
burned earlier this year. Inspector CHEW asked him to give us a rough estimate of TDF that was in the barn. He
said 40 tons.

Photograph 6: View of storage pile of tire-derived fuel, TDF (roughly estimated at 40 tons).

9


-------
A	United States

t Agency	Region 9 ECAD	Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

Afterward, the inspection team went inside the control room in which continuous emissions monitoring was
taking place and noted the readings where Inspector LAPADA took photographs. At 3:39 pm, the inspection team
ended the tour and told Mr. LAWRENCE that the team would return the next day at 10 am to look at the
inventoried bags and conduct the closing conference. At 3:50 pm, the inspection team left the facility.

At around 10:45 am the next morning, the inspection team entered a shipping container where the surplus bags
to be used in the baghouse had been stored. Inspector LAPADA took photographs of fabric filter bags stored inside.
Mr. LAWRENCE said there were close to 80 bags and the facility was purchasing 75 more. Mr. LAWRENCE said the
purchases for bags typically take place twice a year - in the spring and fall. The facility would inventory the bags
every 90 days, such as shorter outages when inspection took place as recently as two weeks ago.

Photograph 7: View of box inside storage trailer containing surplus fabric filter bags.

Mr. LAWRENCE explained that if opacity increased, the facility would need to isolate modules one at a time to
perform more thorough inspections to look for bags with holes or tears inside the baghouse. He said the facility
performed thorough bag inspections around four years ago in 2017. That was when the facility transferred to a
new system, he said. As to visible emissions readings, Mr. LAWRENCE said the facility had a certified E and I
technician performing their Method 9 readings. Inspector DUDASH said he was certified for Method 9 visible
emissions reading. As the inspection team evaluated the proper circumstances for such readings, the inspection
team stated that it could not properly perform visible emission readings at the main stack due to the time of the
day, sun's position at the reader's back, and the lack of a proper contrasting background behind the smoke plume
when facing the southern direction. Despite those circumstances, the inspection team made a preliminary
attempt and Inspector DUDASH did not come up with any 15-second interval readings that exceeded 5% opacity.
Upon checking against the opacity reading of 1.91% in the engineering control room about 20 minutes later, the
inspection team said that the preliminary readings would appear to be consistent with the instrumentation's
reading.

10


-------
Photograph 8: View of main stack on which preliminary attempts were made to perform proper Method 9

visible emissions readings.

a prjA u

v/EPA

A	United States

\ Environmental Protection
I Agency

Region 9 ECAD

Desert View Power Plant
Inspection Report
Inspection Date 11/17-18/21

Inspectors CHEW and DUDASH asked Mr. LAWRENCE about the venting that was taking place to the left side of
the main stack when facing the southern direction. Mr. LAWRENCE said that would be the blowdown vent before
the sump and the cooling tower. Inspector CHEW asked Mr. LAWRENCE to lead the team there. At the blowdown
drum, Inspector LAPADAtook photographs of the blowdown vent and drain before the sump and cooling tower.
The inspection team did not note any particulate fallout on nearby equipment surfaces.

Over a railing, Inspector CHEW observed that a truck was stationary with a tarp covering the trailer bed and asked
Mr. LAWRENCE about the contents. Mr. LAWRENCE replied that the truck would load bottom ash to be delivered
to a nearby recycling site or concrete manufacturer, neither of which was owned by Desert View Power Plant or
Greenleaf Power.

11


-------
A	United States

t Agency	Region 9 ECAD	Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

Photograph 9: View of blowdown vent and nearby equipment surfaces.

As to the lances delivering hydrated lime for use at the boilers, Mr. LAWRENCE told us that alarm screens would
alert a technician if a lance had been clogged. This was a measure taken in addition to physical checks during every
shift and round sheets to check for working pressure suction at the lances at both boiler units.

SECTION III-AREAS OF CONCERN

Inspector CHEW started our closing conference the next day (Nov. 18) a few minutes after 10:00 am. Joining us
by teleconference was Mr. BOUCHER, Mr. Steve KOZLOWSKI (identified as the fuels manager), and Mr. Rahul
DEUSKAR (identified as the environmental contractor from TRC's Houston, Texas, office). Inspectors CHEW and
LAPADA thanked Mr. LAWRENCE and his colleagues for their time. Inspector CHEW reiterated the purpose of the
inspection and asked the facility representatives to point out anything that had claims as confidential business
information. No one spoke up to make a claim. As to combustion emission calculations, Mr. KOZLOWSKI affirmed
that the facility had been using Method 19 values for calculations. Inspector CHEW said he might have follow-up
questions after getting an opportunity to review actual sample calculations.

Inspector CHEW commented to the inspection team that there was a lot of dust whenever winds were gusty and
noted water trucks were observed spraying water on the grounds on the second day. As to visible emission
readings, the inspection team needed a dark background that had not been available. At this point, our inspection

12


-------
£% rOA Un'ted States

t Agency	Region 9 ECAD	Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

team stated that follow-up on opacity recordings was needed as the team had not been able to perform in-person
Method 9 visible emission field readings properly.

Inspector DUDASH commented that vehicle miles traveled (VMT) for truck traffic associated with deliveries of
hydrated lime had been recorded for 292 miles round trip. Inspector CHEW said the team would check in with the
EPA Permits Office staff as this contrasts with monthly total range permit limit of 280 miles. Mr. LAWRENCE told
us there were 4 miles of travel in and out of the gate.

Inspector CHEW reiterated that EPA would send the facility a copy of the inspection report around 70 days from
the date of the on-site inspection (70 days from November 18). Analyst LOPEZ and Manager ACEVES asked for a
copy of the report when available. Inspector CHEW also explained that the EPA did not make compliance
determinations in the field as a matter of policy and that the presentation of areas of concern did not constitute
a formal compliance determination or violation.

SECTION IV- DOCUMENTS REQUESTED DURING INSPECTION AND ANALYTICAL RESULTS

Mr. LAWRENCE provided us with a copy of the facility site plan and a basic plant diagram. He also provided written
procedures dated 6/6/2021 for the hydrated lime monthly baghouse filter inspections. Mr. LAWRENCE provided
us copies of internal Work Orders RT000382-01 and -02, as well as RT000383-01 and -02, that identified baghouse
and hydrated lime injection system inspections at both boilers that were dated as recently as early November.

Inspector CHEW asked for records starting two months before July 2020 to the present for the sensor readings.
Inspector CHEW also asked for a copy of the risk management plan or audit plan in an electronic form. Mr.
LAWRENCE said there had been one compiled during their last three-year review.

Inspector CHEW asked for a water chemistry analysis at the blowdown equipment.

SECTION V- LIST OF APPENDICES

Appendix 1 - Photograph Log -46 photographs presented from 11/17 to 11/18/21.

13


-------
A	United States

Environmental Protection
M m Agency

Region 9 ECAD

Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

Appendix 1: Photograph Log

1. Inspector Name:

Yvezee Lapada

2. Date(s) of Inspection:

November 17 and 18, 2021

3. Company/Facility Name:

Desert View Power Plant

4. Street Address, City, State:

62-300 Gene Welmas Drive, Mecca, CA 92254

5. Number of Images:

46

6. Archival Record Location:

Microsoft SharePoint Site

Image Number

File Name

Description of Image

1

P1010125.JPG

Main Office Entrance

2

P1010126.JPG

Real-time monitors in the control room

3

P1010127.JPG

Units 1 and 2 monitors

4

P1010129 JPG

Units 1 and 2 monitors

5

P1010130.JPG

Camera Monitors (1 of 2)

6

P1010131.JPG

Camera Monitor (2 of 2)

7

P1010133.JPG

Unit 1 Ammonia Injection

8

P1010136.JPG

Unit 1 Ammonia Leak Detection Gauge reading 0 ppm

9

P1010139.JPG

Unit 2 Ammonia Leak Detection Gauge reading 0 ppm

10

P1010142.JPG

Hydrated Lime Pod #4 with red light indicating that it is empty

11

P1010143.JPG

Hydrated Lime Pig Trailer with four pods

12

P1010145.JPG

Day Controller

13

P1010147.JPG

Day controller

14

P1010149.JPG

Hopper 1 & 2 Scale Controller

15

P1010151.JPG

Procedure to transfer from pig to silo

16

P1010152.JPG

Unit 2 Lances delivering hydrated lime

17

P1010153.JPG

Baghouse ash hopper

18

P1010154.JPG

Baghouse ash hopper

19

P1010155.JPG

Pet Coke Barn

20

P1010156.JPG

Pet Coke barn

21

P1010157.JPG

TDF Pile

22

P1010159.JPG

TDF Pile

23

P1010161.JPG

Unit 1 Analyzer Instrument

24

P1010163.JPG

Unit 2 Analyzer Instrument

25

P1010164.JPG

Continuous Emission Monitoring System (CEMS) Plumbing (P&ID) Diagram

26

P1010166.JPG

CEMS Plumbing (P&ID) Diagram

27

P1010168.JPG

CEMS Plumbing (P&ID) Diagram

28

P1010169.JPG

South Coast AQMD CEMS Approval Letter dated Jan. 22, 2014

29

P1010170.JPG

Box containing extra bags

30

P1010171.JPG

Box containing extra bags

31

P1010172.JPG

North view of stack

32

P1010174.JPG

Steam plume from blowdown unit

14


-------
A United States

Environmental Protection
M m Agency



Region 9 ECAD Desert View Power Plant

Inspection Report
Inspection Date 11/17-18/21

Image Number

File Name

Description of Image

33

P1010178.JPG

Steam plume from blowdown unit

34

P1010180.JPG

North view of stack

35

P1010181.JPG

North view of stack

36

P1010182.JPG

North view of stack

37

P1010187.JPG

Steam

38

P1010188.JPG

Steam

39

P1010189.JPG

Steam

40

P1010190.JPG

Steam

41

P1010191.JPG

Steam

42

P1010192.JPG

Steam

43

P1010193.JPG

Identification Plate at Blowdown drum

44

P1010194.JPG

Identification Plate at Blowdown drum

45

P1010195.JPG

Instrumentation readings, Units 1 and 2

46

P1010197.JPG

Instrumentation readings, Units 1 and 2

15


-------