PONDING & FLOODING

LACKING SUFFICIENT LANDSCAPING

^Lacks Public Green

93%

0 0 2

m. *SiMi

i

ANALYSIS & SOLUTIONS

SITE IMPROVEMENTS & BENEFITS

TEAM #: D01

PROPORTION OF RAINWATER TO TOTAL COOLING TOWER WATER MAKEUP

B

15% 20% 25%



15% 20% 25%	15% 20% 25%

Blends of sand-filtrated rainwater/tap water

15% 20% 25%

WATER QUALITY FOR DIFFERENT BLENDS OF TAP WATER & RAINWATER







/ '"/ // 2
[









\ 2-Yr, 24-Hr

V 4.7

I





4ac



11 imkwtM- T"

"0®^^ ir





JMP JHL : Pr

REMOTELY OPERATED & SELF CLEANING RAINWATER TANK SYSTEM (ROSCRTS)

1 2-4 5 6 7 8 9 10
Green Public Space Should be Added

Trigger
components

HARDWARE ARCHITECTURE OF THE ROSCRTS

DEMONSTRATION PROTOTYPE

EVAPORATIVE COOLING TOWERS

RAINWATER HARVESTING SYSTEM (RHS)

801=

12:00

0.00e+00"

[vv/mz|

SIMULATED SOLAR HEAT FLUX ON OU BUILDING

Both Green roof and Fa9ade



Green Facade



Green roof



Bare roof s s**—"~



//



11/



Hi



f/i

\

	J



06:00 12:00 06:00
Time [HH:MM]

PROPOSED SMART GREEN INFRASTRUCTURES & RHS FOR EC CAMPUS

AUGMENTED REALITY APP OVERLAYING & COMMUNICATING THE VEGETATION, WATER USE &
SUSTAINABILITY EFFORTS OF THE PROJECT TO THE CAMPUS COMMUNITY

STRATEGIES & BENEFITS

PROBLEMS

PROPOSAL

PONDING & FLOODING

+

CAMPUS AESTHETICS
LACKING LANDSCAPING

INNOVATIVE COMPONENTS

RAINWATER HARVESTING FOR COOLING TOWER MAKE-UP

BENEFITS

SMART ECO-WATER USE

Automated Rainwater
Filtration Tanks

-|- Self-cleaning System
& First Flush Diverter

+ Remotely-operated
System

RHS

ROSCRTS

SMART GREEN INFRASTRUCTURE SYSTEM

SMART
GREEN ROOF



+

Green Roof w/ Automated

HIS-

¦ l3c-



Irrigation System



+

Green Facade w/ Automated

¦	i^

¦	r->



Irrigation System

¦is

+

Augmented Reality



Mobile App

SMART





mg)

14 MG of Water Saved Per Year
Saving $27,62l/yr. in Water Bill

GREEN FACADE

(" ©l 43,911 kWh Saved Per Year
mt) Saving $3,829/yr. in Electricity Bill

0^^ $31,450 Saved Per Year
(Water & Electricity)

3.6 F Temperature Reduction

511 lbs. of Carbon
Sequestration

i&T1 ) Augmented Reality App to
V Vv / Promote Green Education





Towards a Climate-Resilient Campus



Normal
Year

Roof Area: 84,942 ft
Roof Slope: 10%
Intensity: 2 in/hr

Gutter

4 Downspout Pipes per Solar Roof
8" Size

imufation '

FILTRATION RATE SIMULATIONS

Waicr Pressure
iii -250 • -200 psf
•200- -150 psf
-150--100 psf

50-100 psf
100-150 psf
a 150 - 200 psf

Solar panel
Canopies
Pre- filtration
Tank

Filtration Tank

Post- filtration
Tank

Rain Gutter

FIU EC OU
Building

Irrigation Tank

©
0

©
O
©

PROPOSED SMART GREEN INFRASTRUCTURES FOR EC OU BUILDING

Green Roof
Details

PROPOSED GREEN ROOFS FOR EC OU BUILDING

Affiliated PreFT

PreFT

Rain Gutter

Downspout Pipe

RHS FOR EC SOLAR CANOPIES

PROPOSED SMART GREEN FACADE FOR EC OU BUILDING

Correct 80%


-------