US EPA
Region 7
Lenexa, Kansas
CHEROKEE COUNTY SUPERFUND SITE
OPERABLE UNIT 4 - TREECE
TAR CREEK - NORTHWEST TRIBUTARY-
CHEROKEE COUNTY, KANSAS
CRAWFORD COUNTY
CHEROKEE COUNTY^
kWaco
LAWTON ROAD
FINAL DESIGN SUBMITTAL - REVISED
MAY 2016
Prepared By:
CDM Federal Programs Corporation
CHEROKEE COUNTY.
KANSAS
V
~ HGL
^ HydroGeoLogic, Inc
MISSOURI
OKLAHOMA
ARKANSAS
INDEX OF DRAWINGS
SHEET NO. DRAWING
G-01 COVER SHEET
G-02 GENERAL NOTES AND LEGEND
G-03 GENERAL SITE PLAN, HAUL ROUTES, AND WATERSHED DELINEATION PLAN
G-04 TEMPORARY HAUL ROAD AND CREEK CROSSING PLAN
G-05 WETLAND SITE PLAN
C-01 EXCAVATION AND RESTORATION PLAN - AREA 1 (TX-12 AND TT-38)
C-02 EXCAVATION PLAN - AREA 2 (TX-33)
C-03 RESTORATION PLAN - AREA 2 (TX-33)
C-04 EXCAVATION PLAN - AREA 3 (TT-1, TC-2, TX-2, TX-47)
C-05 RESTORATION PLAN - AREA 3 (TT-1, TC-2, TX-2, TX-47)
C-06 EXCAVATION PLAN - AREA 4 (TX-7 NORTH)
C-07 RESTORATION PLAN - AREA 4 (TX-7 NORTH)
C-08 NORTHWEST TRIBUTARY - STREAM RESTORATION PLAN 1
C-09 NORTHWEST TRIBUTARY - STREAM RESTORATION PLAN 2
C-10 NORTHWEST TRIBUTARY - STREAM RESTORATION PLAN 3
C-11 NORTHWEST TRIBUTARY - STREAM RESTORATION PLAN 4
CD-01 CIVIL DETAILS 1
CD-02 CIVIL DETAILS 2
CD-03 CIVIL DETAILS 3
CD-04 CIVIL DETAILS 4
CD-05 CIVIL DETAILS 5
U.S. HWY 69/160
Columbus i
CHEROKEE COUNTY
SUPERFUND SITE
TREECE (OU-4)
U.S. HWY 166
KANSAS
\
OKLAHOMA
SpRlNG
r
Galena
-^Picher
V
« /
£/
Z/Commerce
Lowell
Baxter Springs
ROUTE 66 Joplin
JASPER COUNTY
NEWTON COUNTY/
U.S. HWY 166/400
CHEROKEE CPUNPi
OTTAWA^OUN"[Y~7 '
CD,
Miami,
NOT TO SCALE
VICINITY MAP
A/Grand Lake 'O'
./ the Cherokees
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
-------
GENERAL NOTES:
(APPLY TO ALL SHEETS UNLESS OTHERWISE NOTED)
1. LOCATIONS OF ALL EXISTING STRUCTURES, SUBSURFACE SOIL OR ROCK CONDITIONS ARE
BASED ON THE BEST AVAILABLE INFORMATION AND NOT WARRANTED TO BE EXACT, NOR IS IT
WARRANTED THAT ALL ARE SHOWN, UTILITIES ARE KNOWN TO BE PRESENT ON THE SITE ALONG
PUBLIC ROADS/EASEMENTS AND DEVELOPED PROPERTIES, CONTRACTOR SHALL VERIFY UTILITY
LOCATIONS PRIOR TO EXCAVATION.
2. THE CONTRACTOR SHALL BECOME SATISFIED AS TO THE CONDITIONS EXISTING WITHIN EACH
AREA, THE TYPE OF EQUIPMENT REQUIRED TO PERFORM THE WORK, AND THE CHARACTER,
QUALITY, AND QUANTITY OF THE SUBSURFACE MATERIALS TO BE ENCOUNTERED INSOFAR AS
THIS INFORMATION IS REASONABLY ASCERTAINABLE FROM AN INSPECTION OF THE SITE, AS WELL
AS INFORMATION PRESENTED BY THE CONTRACT DRAWINGS AND SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING, INSPECTING, AND PROTECTING ALL
EXISTING SITE IMPROVEMENTS OR STRUCTURES. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO SATISFY THEMSELVES THAT ALL THE EXISTING SITE IMPROVEMENTS,
WHETHER SHOWN ON THESE CONTRACT DRAWINGS OR NOT, HAVE BEEN PROPERLY LOCATED
AND PROTECTED.
4. THE CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT SAFETY INCLUDING, BUT NOT LIMITED
TO, EXCAVATION, TRAFFIC CONTROL, AND SECURITY.
5. THE U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) WILL OBTAIN ALL ACCESS AGREEMENTS
NECESSARY TO ACCESS THE PROPERTIES THAT REQUIRE REMEDIATION. THE CONTRACTOR IS
NOT TO PERFORM WORK ON ANY PROPERTIES WITHOUT AN ACCESS AGREEMENT.
6. THE CONTRACTOR SHALL LIMIT THEIR ACTIVITIES TO WITHIN THE WORK AREAS SHOWN ON THE
CONTRACT DRAWINGS. WORK CONDUCTED OUTSIDE OF WORK AREAS, IF REQUIRED, SHALL BE
COORDINATED WITH EPA.
7. THE CONTRACTOR SHALL RESTORE ALL DAMAGED AREAS TO THEIR ORIGINAL CONDITION.
8. THE TERM 'ACCEPTABLE' SHALL MEAN WRITTEN ACCEPTANCE TO BE RECEIVED FROM EPA
BEFORE WORK IS STARTED.
9. ANY DEVIATIONS FROM THE CONTRACT DRAWINGS OR SPECIFICATIONS MUST BE ACCEPTED, IN
WRITING, PRIOR TO THE WORK BEING DONE. ANY DEVIATIONS PERFORMED WITHOUT
ACCEPTANCE WILL NOT BE PAID FOR, AND MAY BE REQUIRED TO BE REDONE AT THE
CONTRACTOR'S EXPENSE.
10. THE CONTRACTOR SHALL HAVE A COPY OF THE CONTRACT DOCUMENTS AT THE WORK SITE
AT ALL TIMES.
11. SEE INDIVIDUAL SHEETS FOR ADDITIONAL ABBREVIATIONS, SYMBOLS, LEGENDS, DETAILS AND
NOTES, IF ANY. NOT ALL 'STANDARD' DETAILS SHOWN MAY BE APPLICABLE TO THIS PROJECT.
12. UNLESS NOTED OTHERWISE, ALL WORK SHOWN IN THESE CONTRACT DOCUMENTS IS NEW
AND TO BE PERFORMED UNDER THIS CONTRACT.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SITE SECURITY FOR THE
CONTRACTOR'S FACILITIES AND EQUIPMENT WITHIN THE LIMITS OF THE CONTRACT.
14. THE CONTRACTOR SHALL EXERCISE CAUTION WHEN WORKING AROUND MINE SHAFTS AND
SUBSIDENCE PITS, SUBSURFACE VOIDS EXIST IN THE IMMEDIATE AREAS WHERE THE EXCAVATION
AND BACKFILLING ACTIVITIES ARE BEING PERFORMED. THESE VOIDS MAY COLLAPSE OR OPEN AT
ANY TIME. THE CONTRACTOR SHALL SUBMIT A SUBSIDENCE PIT AND MINE SHAFT FILLING PLAN IN
ACCORDANCE WITH SECTIONS 02111 AND 02220.
15. THE SIDES OF THE VERTICAL OPENINGS AND SUBSIDENCES MAY BE EXTREMELY UNSTABLE.
EXTREME CAUTION SHOULD BE USED WHEN WORKING AROUND ALL WORK AREAS TO PREVENT
PERSONNEL AND/OR EQUIPMENT FROM FALLING INTO THE HOLES. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR WORKING SAFELY AT ALL AREAS OF THE SITE. THE CONTRACTING OFFICER'S
REPRESENTATIVE WILL STOP WORK IF THE CONTRACTOR IS NOT FOLLOWING GENERAL SAFETY
PRACTICES.
16. EXCAVATION AND BACKFILL ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE
REQUIREMENTS OF THE PERFORMANCE WORK STATEMENT, SPECIFICATIONS, AND THE
CONTRACTOR'S APPROVED SITE HEALTH AND SAFETY PLAN. APPROPRIATE HEALTH AND SAFETY
MEASURES AND TRAINING WILL BE REQUIRED AT ALL WORK LOCATIONS.
17. THE TERM 'MINE WASTE' SHALL MEAN CHAT, TAILINGS, AND CONTAMINATED SOIL WITH METALS
CONCENTRATIONS EXCEEDING CLEANUP GOALS SPECIFIED IN THE PERFORMANCE WORK
STATEMENT.
18. COORDINATES USED ON CONTRACT DRAWINGS ARE NAD-83 (CORS 96) KANSAS STATE PLANE,
ZONE 1502 KANSAS SOUTH IN U.S. SURVEY FEET. VERTICAL DATUM IS MEAN SEA LEVEL NAVD
1938.
19. SITE TOPOGRAPHIC SURVEY AND AERIAL PHOTOGRAPHY PERFORMED BY AERIAL DATA
SERVICES, APRIL 2013. THE FLIGHT HEIGHT OF THE AERIAL PHYOTOGRAPHY WAS 2,000 FEET
ABOVE MEAN TERRAIN ELEVATION. NO PERMANENT BENCH MARKS OR REFERENCE POINTS WERE
ESTABLISHED FOR THE SITE TOPOGRAPHIC SURVEYS.
LEGEND
NOTE: IN GENERAL, EXISTING FEATURES ARE GREY AND NEW OR
IMPORTANT FEATURES ARE BLACK. HATCHED AREAS ARE GENERALLY
GREY FOR CLARITY.
-X—X—X- EXISTING FENCE
CZD
OE-
OP-
a
EXISTING TREES AND/OR SHRUBS
EXISTING TOPOGRAPHIC CONTOUR
(1 FOOT INTERVALS)
EXISTING DRAINAGE
EXISTING BUILDING
OVERHEAD ELECTRIC
OVERHEAD PHONE
VENT PIPE
MINE SHAFT
S
+
~
SITE AND EXCAVATION PLAN NOTES:
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. IMPLEMENT AND MAINTAIN SEDIMENT AND EROSION CONTROL MEASURES IN
ACCORDANCE WITH SECTION 02910.
2. CLEARING AND GRUBBING SHALL BE CONDUCTED AS SPECIFIED IN SECTION 02230
WITHIN THE LIMITS OF CONSTRUCTION. TREE AND PLANT PROTECTION DURING
CLEARING AND GRUBBING SHALL BE CONDUCTED IN ACCORDANCE WITH SECTION
02230.
3. VEGETATIVE DEBRIS FROM CLEARING AND GRUBBING SHALL BE DISPOSED IN
ACCORDANCE WITH SECTION 02230. OPEN BURNING SHALL BE CONDUCTED IN
ACCORDANCE WITH SECTION 02121.
4. DISPOSE OF MISCELLANEOUS DEBRIS OFFSITE IN ACCORDANCE WITH SECTION
02121.
5. INITIAL CONSTRUCTION LIMITS SHOWN ON THE DRAWINGS ARE FOR ESTIMATING
PURPOSES ONLY. THE CONSTRUCTION LIMITS MAY BE MODIFIED BY EPA IF WASTE
MATERIALS OR CONTAMINATED SOIL IS FOUND BEYOND THE INITIAL LIMITS.
6. IN GENERAL, CONCRETE MILL WORKS STRUCTURES SHALL NOT BE REMOVED
UNLESS INDICATED ON THE CONTRACT DRAWINGS.
7. EXCAVATION SHALL PROCEED AS SPECIFIED IN SECTION 02111. MAINTAIN EXISTING
DRAINAGE PATTERNS DURING CONSTRUCTION.
8. CONFIRMATORY SAMPLING SHALL BE CONDUCTED BY THE CONTRACTOR IN
ACCORDANCE WITH SECTION 02111.
9. RESTORATION ACTIVITIES, INCLUDING BACKFILLING, SHALL NOT COMMENCE
WITHOUT APPROVAL BY EPA.
10. THE CONTRACTOR SHALL EXCAVATE AROUND TREES AND BUSHES TO BE LEFT IN
PLACE UNLESS OTHERWISE SPECIFIED, IN ACCORDANCE WITH SECTIONS 01490 AND
02111. THE EXCLUSION RADII FOR TREES AND BUSHES LEFT IN PLACE ARE SPECIFIED
IN SECTION 02111.
11. OVEREXCAVATION OF UNIMPACTED SOIL WITHIN THE MINE EXCAVATION AREAS TO
GENERATE COVER MATERIALS FOR THE CONSOLIDATION AREAS IS STRICTLY
PROHIBITED EXCEPT FOR AREAS NOTED ON THE DRAWINGS.
12. THE NORTHWEST TRIBUTARY OF TAR CREEK EXTENDING FROM THE LARGE POOL
OF WATER EAST OF AREA 2 TO STAR ROAD WILL BE REMEDIATED UNDER THIS
CONTRACT. THE TRIBUTARY IS CLASSIFIED AS AN EPHEMERAL STREAM
CHARACTERIZED BY A RELATIVELY NARROW INCISED CHANNEL WITH STEEP BANKS
AND STANDING WATER ALONG MOST OF ITS LENGTH. CHAT AND OTHER TYPES OF
MINE WASTE ARE VISIBLE ALONG THE BOTTOM OF THE CHANNEL DUE TO RUNOFF
FROM THE SURROUNDING MINE WASTE AREAS.
13. REMEDIATION OF THE CREEK CHANNEL AND SURROUNDING AREA(S) WILL BE
PERFORMED BASED ON THE CONTRACT REQUIREMENTS AND THE CONTRACTOR'S
NORTHWEST TRIBUTARY RESTORATION PLAN AS APPROVED BY EPA. REFER TO THE
PERFORMANCE WORK STATEMENT FOR SPECIFIC REQUIREMENTS FOR THIS PLAN.
14. IN GENERAL, THE REMEDIATION CONCEPTS FOR THE NORTHWEST TRIBUTARY OF
TAR CREEK INCLUDE REMOVAL OF 18 INCHES OF EXISTING MINE WASTE AND SOIL
BENEATH THE EXISTING CHANNEL BOTTOM AND DISPOSAL OF THE EXCAVATED
MATERIALS WITHIN THE DESIGNATED WASTE CONSOLIDATION AREAS. WHERE THE
DEPTH OF EXISTING MINE WASTE IS GREATER THAN 18 INCHES, THE DEPTH OF
EXCAVATION SHALL BE INCREASED TO REMOVE THE VISIBLE MINE WASTE.
REMEDIATION OF IMPACTED SOIL WITHIN THE FLOODPLAIN ADJACENT TO THE CREEK
CHANNEL SHALL BE BASED ON EXCAVATION TO ATTAIN THE SOIL REMEDIATION
STANDARDS PROVIDED IN THE PERFORMANCE WORK STATEMENT.
15. THE DEPTH OF EXCAVATION BENEATH EXISTING BRIDGES ALONG THE EXISTING
CHANNEL SHALL BE LIMITED TO REMOVAL OF VISIBLE MINE WASTE TO PREVENT
UNDERCUTTING AND INSTABILITY OF EXISTING FOUNDATIONS. REFER TO THE
PERFORMANCE WORK STATEMENT FOR ADDITIONAL INFORMATION. WORK IN THE
VICINITY OF THE EXISTING BRIDGES SHALL BE COORDINATED WITH EPA PRIOR TO
START OF EXCAVATION TO ALLOW DIRECT OBSERVATION OF EXPOSED BRIDGE
ABUTMENT CONDITIONS DURING EXCAVATION.
LOCATION CODE
MINE WASTE CODE
T
X
ow
STRAW BALES
DESCRIPTION
MINE WASTE AREA WITHIN TREECE OPERABLE UNIT
DESCRIPTION
CHAT
FLOTATION TAILINGS
EXCAVATED CHAT OR MILL-RELATED DISTURBANCE
OUTWASH TAILINGS
SOIL EROSION AND SEDIMENT CONTROL NOTES:
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. THE CONTRACTOR SHALL INSTALL THE APPROPRIATE EROSION AND SEDIMENT
CONTROLS PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES. THE EROSION
CONTROL PRACTICES AND STRUCTURES SHALL BE APPROVED PRIOR TO
IMPLEMENTATION IN ACCORDANCE WITH SECTION 02910. EROSION AND SEDIMENT
CONTROLS SHALL BE MAINTAINED IN ACCORDANCE WITH SECTION 02910 DURING
CONSTRUCTION.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ANY AND ALL
TEMPORARY SOIL EROSION AND SEDIMENT CONTROL MEASURES DEEMED
NECESSARY DURING THE COURSE OF CONSTRUCTION.
3. SILT FENCING, STRAW BALES, DRAINAGE DITCHES, AND TEMPORARY DRAINAGE
SWALES SHOWN ON THE CONTRACT DRAWINGS SHALL BE CONSTRUCTED AS SHOWN
ON SHEET CD-01 AND AS SPECIFIED IN SECTION 02910.
4. TEMPORARY PROJECT SAFETY FENCING SHALL BE CONSTRUCTED AROUND WORK
AREA(S) AS DIRECTED BY EPA AND AS SPECIFIED IN THE PERFORMANCE WORK
STATEMENT.
5. EROSION AND SEDIMENT CONTROLS SHALL BE REMOVED UPON ACCEPTANCE OF
VEGETATION AS SPECIFIED IN SECTION 02921.
GRADING AND RESTORATION PLAN NOTES:
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. RESTORATION SHALL BEGIN ONLY AFTER CLEANUP GOALS IN AN EXCAVATION
AREA HAVE BEEN ACHIEVED AS SPECIFIED IN SECTION 02111.
2. THE CONTRACTOR SHALL MAINTAIN ALL EROSION AND SEDIMENTATION CONTROLS
PREVIOUSLY INSTALLED AS SPECIFIED IN SECTION 02910 DURING RESTORATION
ACTIVITIES.
3. COVER SOIL SHALL BE AS SPECIFIED IN SECTION 02140.
4. SEEDING SHALL BE AS SPECIFIED IN THESE CONTRACT DOCUMENTS AND IN
ACCORDANCE WITH SECTION 02921.
5. THE CONTRACTOR SHALL RESTORE DAMAGED AREAS OUTSIDE OF THE WORK
AREA ONCE RESTORATION ACTIVITIES ARE COMPLETED.
6. RESTORATION AROUND TREES AND BUSHES TO BE LEFT IN PLACE SHALL BE
SUBJECT TO THE EXCLUSION RADIUS RESTRICTIONS THAT ARE SPECIFIED IN
SECTION 02111.
7. BACKFILL ON WET SUBGRADE AS A RESULT OF GROUNDWATER MAY BE
ENCOUNTERED AT SHALLOW DEPTHS ADJACENT TO THE NORTHWEST TRIBUTARY
AND PONDS. CONTRACTOR MAY NEED TO PLACE BACKFILL IN WET AREAS. BACKFILL
IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 02300.
8. THE SITE AREAS MAY CONTAIN FENCING FOR SECURITY AND LIVESTOCK CONTROL.
MANY OF THE EXISTING FENCES ARE NOT SHOWN ON THE DRAWINGS BECAUSE OF
HEAVY VEGETATION. WHERE REMOVAL OF THE FENCING IS REQUIRED FOR SITE
EXCAVATION AND RESTORATION, THE CONTRACTOR SHALL REPLACE THE EXISTING
FENCING WITH NEW, LIKE MATERIALS PER SECTION 02830 AT THE ORIGINAL FENCING
LOCATIONS.
9. THE CONTRACT DRAWINGS INCLUDE THE LOCATIONS AND DESIGN DETAILS OF
SPECIFIC WORK ELEMENTS TO BE COMPLETED BY THE CONTRACTOR TO MAINTAIN
AND RESTORE STABILITY OF THE CREEK CHANNEL AND ITS STREAM BANK BASED ON
GEOMORPHOLOGICAL CONSIDERATIONS. REFER TO THE INDIVIDUAL DRAWINGS FOR
ADDITIONAL INFORMATION AND DESIGN DETAILS.
* ALL SYMBOLS AND ABBREVIATIONS ON THIS
SHEET ARE FOR GENERAL INFORMATION AND
MAY NOT NECESSARILY BE USED ON EVERY PAGE
WITHIN THESE CONTRACT DOCUMENTS.
STANDARD SECTION SYMBOL
SECTION NUMBER
SHEET WHERE SECTION
IS SHOWN
CREEK SOIL OR SEDIMENT SAMPLE
LOCATION AND NUMBER
TEST PIT LOCATION AND NUMBER
DIRECTION OF SLOPE
VEGETATION (TYPICAL)
PRIMARY HAUL ROUTE
LIMITS OF CONSTRUCTION
WATERSHED DELINEATION BOUNDARY
FINAL GRADE CONTOURS
(1 FOOT INTERVALS)
MINE WASTE CONSOLIDATION AREA
MAINTENANCE MONUMENT
STRAW WATTLE
DIRECTION OF STREAM/RIVER/DRAINAGE FLOW
- DIVERSION TERRACE/DIRECTION OF FLOW
DRAINAGE SWALE/TEMPORARY DIVERSION DITCH
MINE WASTE DISPOSAL/CONSOLIDATION AREA
CHANNEL TO BE FILLED
SUBSIDENCE PIT
CREEK/STREAM EDGE
STREAM EXCAVATION
SEEDING
TABLE 1
REFERENCE POINTS
DESIGNATION
EASTING
NORTHING
ELEVATION
10
2374526.15
1460489.88
837.60
TABLE 2
ESTIMATED NUMBER OF MINE SHAFTS
REMEDIATION AREA
NUMBER OF
MINE SHAFTS
AREA 1 (TX-12, TT-38)
0
AREA 2 (TX-33)
1
AREA 3 (TT-1, TC-2, TX-2, TX-47)
2
AREA 4 (TX-7 NORTH)
0
NOTE:
ESTIMATED NUMBER OF MINE SHAFTS BASED ON FIELD SURVEY AND AVAILABLE INFORMATION.
ADDITIONAL MINE SHAFTS MAY BE PRESENT.
TABLE 3
MINE WASTE DISPOSAL LOCATIONS
REMEDIATION AREA
AREA 2
TC-3
AREA 1 (TX-12, TT-38)
X
AREA 2 (TX-33)
X
AREA 3 (TT-1, TC-2, TX-2, TX-47)
X
AREA 4 (TX-7 NORTH)
X
NOTES:
1. FINAL DISPOSAL LOCATIONS MAY BE ADJUSTED BASED ON ACTUAL QUANTITIES OF
MINE WASTE ENCOUNTERED DURING CONSTRUCTION.
2. USABLE CHAT FROM AREA 3 SHALL BE HAULED TO TC-3.
TABLE 4
ESTIMATED AREA AND VOLUME OF WASTE AND
CONTAMINATED SOIL TO BE EXCAVATED AND
PLACED IN MINE WASTE CONSOLIDATION AREAS
REMEDIATION AREA
AREA
(AC)
ESTIMATED
VOLUME
(BCY)
AREA 1 (TX-12, TT-38)
17.7
106,500
AREA 2 (TX-33)
25.2
265,400
AREA 3 (TT-1, TC-2, TX-2, TX-47)
40.4
488,000
AREA 4 (TX-7 NORTH)
13.5
68,700
ESTIMATED TOTAL
104.9
945,000
NOTES:
1. AC = ACRE BCY = BANK CUBIC YARD N/A = NOT APPLICABLE
2. FOR PURPOSES OF BIDDING, THE ESTIMATED TOTAL AREA SHOWN IN TABLE 4 SHALL BE USED TO ESTIMATE
THE AREA REQUIRING SITE RESTORATION, INCLUDING GRADING AND REVEGETATION. THE LISTED VALUES
DESCRIBE ONLY THE AREA OVER WHICH THE MINE WASTE IS VISIBLE AT GROUND SURFACE. REFER TO TABLE 5
FOR ESTIMATED VOLUMES OF BACKFILL AND TOPSOIL.
3. THE VOLUME OF CONTAMINATED SOIL IS BASED ON AN ASSUMED 12-INCH INTERFACE DEPTH OF
CONTAMINATED SOIL UNDERLYING THE WASTE, A 12-INCH EXCAVATION DEPTH IN DEWATERED PONDS, AN
18-INCH EXCAVATION DEPTH IN THE CREEK CHANNEL BANKS, AND A 12-INCH EXCAVATION DEPTH 100 FEET FROM
THE EDGE OF THE CREEK CHANNEL BANK.
4. A 25 PERCENT OVERAGE WAS ADDED TO THE ESTIMATED WASTE VOLUMES TO ALLOW FOR IRREGULARITIES
AND OTHER UNKNOWNS.
TABLE 5
ESTIMATED VOLUME OF IMPORTED SUBGRADE BACKFILL
AND TOPSOIL TO BE REPLACED DURING SITE RESTORATION
EXCAVATED AREAS
CONSOLIDATION AREAS
REMEDIATION AREA
SELECT FILL
(ECY)
TOPSOIL
(ECY)
SELECT FILL
(ECY)
TOPSOIL
(ECY)
AREA 1 (TX-12, TT-38)
10,700
14,300
AREA 2 (TX-33)
8,400
16,500
33,300
16,700
AREA 3 (TT-1, TC-2, TX-2, TX-47)
29,100
32,700
AREA 4 (TX-7 NORTH)
6,200
11,000
NOTES:
1. ECY = EMBANKMENT CUBIC YARD
2. ALL VOLUMES ARE PRESENTED AS EMBANKMENT CUBIC YARDS AND CONTAIN NO OVERAGES.
3. ESTIMATED VOLUMES LISTED FOR EXCAVATED AREAS ASSUME A MINIMUM 6-INCH SELECT FILL SUBGRADE
BACKFILL AND 6-INCH TOPSOIL PLACED ACROSS THE MINE WASTE REMOVAL AREA AT EACH REMEDIATION AREA
WITH THE EXCEPTION OF THE TRIBUTARY CHANNEL IN AREA 3 AS NOTED ON THE DRAWINGS. ADDITIONAL
SUBGRADE MATERIAL MAY BE REQUIRED TO GRADE AND SHAPE THE DISTURBED AREAS IN ORDER TO MAINTAIN
POSITIVE DRAINAGE ACROSS EACH SITE.
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
s&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
|=3
J
19!
II
>n
!i
J 3 <
) m w
\ % 5
2;
f E
SS
j a
r "J
j <
SHEET
IDENTIFICATION
G-02
-------
AREA 1
(TX-12, T
PRIMARY
HAUL ROUTE
l!£HVyAYJ.6j
Mour
TEMPORARY
HAUL ROAD
SEE NOTE 3
AREA 2
AREA 3 (TT-1,
TC'2, tX-2, TX-47)
/AREA 4 (TX-7
EXISTING BRIDGE
SEE NOTE 4
y Tailings
I
fWDjm
ISWST^RROAD
T)\W " ""~TTs«
PROVIDE TEMPORARY
HAUL ROAD AND I
— CREEK CROSSING '.
SEE NOTE 6 W y.
Tailings 111
EXISTING ROAD BRIDGE
SEE NOTE 5
Atemporary haul road
SEE NOTE 3
' I ladings
. ' IS)..
//failings
WATERSHED-
DEUNEATiofi
BOUNDARY
.'^Sailings
iTfl ( failogs *.
f-i!Treece 13 ' / *; J
' * f I ~'1' ' I "'
^L^r7n7n7~T--Z-Z~y..
14 TaiMnes
i$r$ I ¦" : ppp
STATE LINE STREET (TREECE ROAD)
tawa
11
pitfasti
li®
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
NOTES:
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. MAKE IMPROVEMENTS TO HAUL ROADS, AS NECESSARY, TO ACCOMMODATE CONSTRUCTION
EQUIPMENT. TEMPORARY HAUL ROADS MAY BE WIDENED TO PERMIT TWO-WAY TRAFFIC AS REQUIRED.
2. TRANSPORT MINE WASTE AND IMPORT MATERIAL IN ACCORDANCE WITH SECTION 02121. THE
CONTRACTOR SHALL MAINTAIN HAUL ROADS IN ACCORDANCE WITH SECTION 02121.
3. TEMPORARY ACCESS AND HAUL ROADS SHALL BE MAINTAINED IN ACCORDANCE WITH SECTION 02121.
TEMPORARY ACCESS AND HAUL ROADS SHALL BE REMOVED UPON COMPLETION OF WORK IN THAT
AREA UNLESS THE LANDOWNER REQUESTS IN WRITING THAT THEY REMAIN IN PLACE. IF SUCH A
REQUEST IS MADE, EPA MUST RECEIVE A COPY OF THE REQUEST. REMOVAL OF TEMPORARY ACCESS
AND HAUL ROADS SHALL INCLUDE REMOVAL AND PROPER DISPOSAL OF ANY MINE WASTE AND
IMPACTED SOIL AND REPLACEMENT WITH CLEAN FILL APPROVED BY EPA. DISTURBED AREAS SHALL BE
GRADED TO MATCH SURROUNDING AREAS AND SEEDED IN ACCORDANCE WITH SECTION 02921.
4. THE ENTRANCE TO AREA 2 (TX-33) CONSISTS OF AN EXISTING BRIDGE OVER A WATER CHANNEL. THE
CONTRACTOR SHALL NOT USE THIS BRIDGE FOR HAULING OF MATERIAL AND HEAVY EQUIPMENT USE.
DAMAGE TO THIS BRIDGE AND REPAIRS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. A
TEMPORARY CROSSING SHALL BE CONSTRUCTED IN LIEU OF USING THE EXISTING BRIDGE. IF NEEDED
TO ACCESS AREA 2 FROM SW 20TH STREET, CONSTRUCT A TEMPORARY CROSSING OVER THE EXISTING
CREEK TRIBUTARY. THE LOCATION OF THE TEMPORARY CROSSING SHALL BE REMOVED UPON
ACCEPTANCE OF SITE RESTORATION BY EPA.
5. THE CONTRACTOR SHALL DETERMINE WHETHER THE CONDITION OF THE EXISTING BRIDGE ON SW
20TH STREET IS SUITABLE FOR USE. DAMAGE TO THIS BRIDGE AND REPAIRS WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
6. PROVIDE TEMPORARY TAR CREEK HAUL ROAD AND CREEK CROSSING FOR HAULING MINE WASTE
FROM THE AREA 3 (TC-2) CHAT PILE TO TC-3. SEE SHEET G-04 FOR ADDITIONAL DETAILS.
7. THE SOURCE OF THE TOPOGRAPHIC IMAGES IS UNITED STATES GEOLOGICAL SURVEY, 1978.
1" = 1000'
&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
I— CL
< Q
SHEET
IDENTIFICATION
G-03
-------
4r^
K^\
TEMPORARY -
HAUL ROAD
^ .f? ~
TEMPORARY CREEK
CROSSINGS
SEE NOTE 2
INITIAL LIMITS OF
CONSTRUCTION
ROAD
SW STAR ROAD
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
Ji
i
ID?
jcl
II
>h.
ijp
OwI
SHEET
IDENTIFICATION
G-04
1" = 150'
W
NOTES:
1. MAKE IMPROVEMENTS TO HAUL ROADS, AS NECESSARY, TO ACCOMMODATE
CONSTRUCTION EQUIPMENT.
2. CONSTRUCT A TEMPORARY CROSSING OVER TAR CREEK IN ACCORDANCE
WITH THE CONTRACTOR'S WATER AND SEDIMENT MANAGEMENT PLAN. NO
OTHER CROSSING SHALL BE USED UNLESS APPROVED BY EPA.
3. THE TEMPORARY CROSSING WILL BE LEFT IN PLACE FOR FUTURE PHASES
OF WORK.
-------
WETLAND SITE PLAN
WETLAND SITE PLAN NOTES:
(REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION)
1. AS SHOWN ON SHEET G-04, THE PRELIMINARY CONSTRUCTION LIMITS REQUIRE
REMEDIATION OF MINE WASTE AND IMPACTED SOIL WITHIN BROAD AREAS OF THE
SITE WHICH HAVE BEEN CLASSIFIED AS THE FOLLOWING TYPES OF WETLANDS:
PALUSTRINE EMERGENT, PALUSTRINE FORESTED, AND PALUSTRINE SCRUB SHRUB.
2. THE REMEDIAL DESIGN PROVIDES FOR EXCAVATION OF MINE WASTE AND
IMPACTED SOIL (HEAVY METAL CONCENTRATIONS EXCEEDING THE SOIL
REMEDIATION STANDARDS) WITHIN THE EXISTING WETLAND AREAS FOLLOWED BY
PLACEMENT OF CLEAN FILL AND TOPSOIL, AND REVEGETATION OF ALL DISTURBED
AREAS TO RECONSTRUCT/RESTORE THE WETLANDS IMPACTED BY THE REMEDIAL
ACTIVITIES. WHEN REMEDIAL ACTION IS COMPLETED, THE AREAL EXTENT AND
QUALITY OF THE WETLANDS IS EXPECTED TO MEET OR EXCEED CURRENT
CONDITIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING HIS WORK AREA TO MINIMIZE
DISTURBANCE OF THE WETLANDS TO ONLY THOSE AREAS REQUIRING REMEDIATION.
4. THE PERFORMANCE WORK STATEMENT AND SECTION 02955 HAVE SPECIFIC
PERFORMANCE REQUIREMENTS FOR THE TYPES OF FILL MATERIALS, TOPSOIL,
SEEDING AND PLANTINGS REQUIRED FOR RECONSTRUCTION/RESTORATION OF THE
WETLANDS.
WETLAND - PALUSTRINE
SCRUB SHRUB
WETLAND OUTUNE
AREA BOUNDARY
N
1" = 300'
nnn
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
il
l!i
in
|i|
191
jcl
XI
s|i
~ii.
¦¦ .«>
m
Q HI 3 <
z o m to
D Hi 5 Z
U_ LU <
a. £ E 2
=5 4 y I
? t 1 5
£ z i— o
z 3 % °
-1 UJ Q LU
lp!
o ° o i
Q
Z
3
SHEET
IDENTIFICATION
G-05
-------
CULTIVATED FIELD
(NO FENCE)
CULTIVATED
FIELD
CONCRETE
STRUCTURES
¦ GRASS STRIP
DENSE
WOODS
CULTIVATED
FIELD
THIN CHAT
AND TAILINGS
EXCAVATE MINE WASTE
SEE NOTES 3 AND 5
TT—38—5
CULTIVATED
FIELD
TAILINGS
V ^
SHALLOW DITCH
DITCH
DITCH
. lt-38-6
TAILINGS
TAILINGS
TEMPORARY HAUL ROAD
TO DISPOSAL AREA 2
SEE NOTES 2 AND 3
BERM
CULTIVATED
FIELD
INITIAL LIMITS OF
CONSTRUCTION
MATCH LINE
FOR CONTINUATION SEE SHT C-02
EXCAVATION PLAN
AREA 1 (TX-12 AND TT-38)
EXCAVATION PLAN NOTES:
(REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION)
1. THE AREA 1 (TX-12 AND TT-38) MINE WASTE AREA CONTAINS
DISCONTINUOUS AREAS OF SHALLOW CHAT, TAILINGS, AND OTHER MINE
WASTE MIXED WITH SOIL. THE AREA IS PARTIALLY WOODED AND CONTAINS
FORMER MINE WORKS STRUCTURES AND DISCRETE AREAS OF SOLID WASTE.
THE SURROUNDING SITE PROPERTY IS USED FOR AGRICULTURE.
2. AREA 1 IS LOCATED ADJACENT TO THE DISPOSAL AREA 2. THE ABANDONED
RAILROAD SHALL BE USED AS A TEMPORARY HAUL ROAD TO THE MINE
WASTE CONSOLIDATION AREA SHOWN ON SHEET C-02/C-03. THE TEMPORARY
HAUL ROAD TRAVERSES MULTIPLE PROPERTIES AND FENCING USED FOR
AGRICULTURE AND LIVESTOCK CONTROL. THE CONTRACTOR SHALL
COORDINATE HIS WORK WITH THE PROPERTY OWNERS AND MAINTAIN
LIVESTOCK CONTROL IN ACCORDANCE WITH THE CONTRACTOR'S LIVESTOCK
MANAGEMENT PLAN.
3. CONDUCT XRF ANALYSIS (FIELD XRF SCREENING WITH PORTABLE
INSTRUMENT) WITHIN THE INITIAL CONSTRUCTION LIMITS WHERE VISIBLE
MINE WASTE IS NOT PRESENT TO IDENTIFY AREA(S) REQUIRING
REMEDIATION. XRF SCREENING SHALL BE CONDUCTED ON A 50-FOOT GRID
IN ACCORDANCE WITH THE APPROVED QUALITY ASSURANCE PLAN AS
REQUIRED BY THE PERFORMANCE WORK STATEMENT. PROVIDE EPA WITH A
SITE PLAN SHOWING THE GRID LOCATIONS, XRF RESULTS, AND
INTERPRETED AREAS REQUIRING EXCAVATION. THE PROPOSED AREAS OF
EXCAVATION SHALL BE APPROVED BY EPA PRIOR TO EXCAVATION. THE AREA
SURROUNDING THE TEMPORARY HAUL ROUTE BETWEEN AREA 1 AND AREA 2
INCLUDES WOODED AREAS, DISCRETE AREAS OF MINE WASTE, BULLROCK
PILES, OTHER MINING RELATED FEATURES, AND SOLID WASTE. THE
CONTRACTOR'S SITE PLAN SHOWING THE PROPOSED LIMITS OF EXCAVATION
SHALL INCLUDE DELINEATION OF AREAS OF VISIBLE MINE WASTE TO BE
EXCAVATED, BACKFILLED, AND RESEEDED BETWEEN AREAS 1 AND 2. THE
LIMITS OF CONSTRUCTION SHALL BE REVISED AS NECESSARY TO OBTAIN
ACCESS AND TO COMPLETE EXCAVATION OF ALL WASTE AND
CONTAMINATED SOIL.
4. FOR PURPOSES OF BIDDING, REFER TO TABLE 4 ON SHEET G-02 FOR
ESTIMATED WASTE AND CONTAMINATED SOIL VOLUMES. THE DEPTH OF
EXCAVATION SHALL BE BASED ON CONFIRMATION SAMPLING IN
ACCORDANCE WITH SECTION 02111.
5. EXCAVATE MINE WASTE IN ACCORDANCE WITH SECTION 02111.
EXCAVATED MINE WASTE AND CONTAMINATED SOIL FROM AREA 1 SHALL BE
DISPOSED OF IN ACCORDANCE WITH TABLE 3 ON SHEET G-02. THE FINAL
EXCAVATION SURFACE SHALL BE GRADED IN ACCORDANCE WITH SECTION
02111.
TEST PIT TABLE
TEST PIT ID#
APPROX.
THICKNESS
OF MINE
WASTE (FT.)
TYPES OF MINE WASTE
ENCOUNTERED (ORDER AS DEPTH
INCREASES)
COMMENTS
TT-38-1
0.5
CHAT
TT-38-2
2
TAILINGS
POSSIBLE NATIVE (LIGHT
GRAY) CLAY 1-1.5 FT.
TT-38-3
1.3
SILTY CLAY, TAILINGS, SILTY CLAY
TT-38-4
1.5
CHAT, TAILINGS
TT-38-5
<0.5
TAILINGS
TT-38-6
2
TAILINGS
TT-38-7
2
TAILINGS
TT-38-8
5
TAILINGS
TT-38-9
5
TAILINGS
TX-12-1
1.5
CHAT
WATER AT 1 FT.
TX-12-2
1.5
CHAT
TX-12-3
0.75
CHAT
TX-12-4
4
TAILINGS
TX-12-5
0.75
TAILINGS
6. REFER TO NOTES ON SHEET G-02 FOR ADDITIONAL INFORMATION.
RESTORATION PLAN
AREA 1 (TX-12 AND TT-38)
RESTORATION PLAN NOTES:
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. THE GRADING AND RESTORATION REQUIREMENTS SHOWN ON THE
DRAWINGS ARE CONCEPTUAL AND MAY BE ADJUSTED OR MODIFIED BASED
ON SITE CONDITIONS FOLLOWING COMPLETION OF MINE WASTE
EXCAVATION. THIS AREA SHALL BE RESTORED SUCH THAT THE AREA CAN BE
CULTIVATED IN THE FUTURE.
2. REMOVE AND RESTORE TEMPORARY HAUL ROAD AND FORMER RAILROAD
SPUR IN ACCORDANCE WITH NOTE 3 ON G-03.
3. COMPLETION OF SITE RESTORATION SHALL CONFORM TO SECTION 02300
AND THE FOLLOWING CRITERIA:
- THE EXCAVATED AREAS SHALL BE BACKFILLED WITH CLEAN, SILTY CLAY
BACKFILL AND 6 INCHES OF IMPORTED ORGANIC TOPSOIL, AS REFERENCED
IN THE CONTRACTOR'S APPROVED BORROW MANAGEMENT PLAN. BORROW
SOURCES SHALL BE APPROVED BY EPA PRIOR TO SITE RESTORATION.
REFER TO SECTION 02140 FOR ADDITIONAL INFORMATION.
- SITE DRAINAGE PATTERNS SHALL GENERALLY CONFORM TO THE
DIRECTIONAL ARROWS AS SHOWN ON THE DRAWINGS.
- THE EXCAVATED AREAS SHALL BE REGRADED AS NECESSARY TO PROVIDE
POSITIVE SURFACE DRAINAGE, WITH CROSS SLOPES OF 1 TO 3 PERCENT
AND MATCH THE SURROUNDING GRADE.
- REFER TO TABLE 5 ON SHEET G-02 FOR ESTIMATED VOLUME OF IMPORTED
FILL AND TOPSOIL.
4. SEED ALL DISTURBED AREAS WITH A NATIVE GRASS SEED MIX OR
PERMANENT PASTURE GRASS SEED MIX BASED ON THE OWNER'S
PREFERENCE AND IN ACCORDANCE WITH SECTION 02921.
5. REFER TO NOTES ON SHEET G-02 FOR ADDITIONAL INFORMATION.
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
SHEET
IDENTIFICATION
-------
MATCH LINE
FOR CONTINUATION SEE SHT C-01
TEMPORARY HAUL
ROUTE TO AREA 1
SEE NOTE 3
CULTIVATED FIELD
EXISTING POND
(OPEN WATER)
FORMER RAILROAD SPUR
EXCAVATE MINE WASTE
OUTSIDE OF MINE WASTE
CONSOLIDATION AREA
SEE NOTES 4 AND 7 AND 6
PASTURE
LARGE POND OF
WATER WITH CATTAILS
ALONG PERIMETER
TURBID
POND-LIKE
FEATURE
PASTURE
TRACE CHAT
REMOVE
CONTAMINATED
SEDIMENT
SEE NOTE 8
PASTURE
WITH
WOODS
r POORLY
>, DRAINED
WITH BRUSH
AND TREES
TRACE CHAT
AND ROCK
CULTIVATED
FIELD
FENCED
PASTURE
REMOVE
CATTLE PENS
MINE WASTE
CONSOLIDATION AREA
SELECTIVE
REMEDIATION
ZONE
*62300
| ^
CHAT
THROUGHOUT
POORLY
DRAINED
CONCRETE
STRUCTURES
TRACE CHAT
INTERMITTENT
ASPHALT
PAVEMENT
FENCE
SEE NOTE 1
BULLROCK WITH
SOIL/CHAT
SOIL WITH "T"
TRACE CHAT TX-33-
BULLROCK
WITH CHAT
CULTIVATED
FIELD
/—STREAM EXCAVATION
' SEE NOTE 9
s.
FENCED
PASTURE
FENCE
SEE NOTE 1
INITIAL LIMITS OF
CONSTRUCTION
FENCED
PASTURE
vTX—33-120
REMOVE BARBED WIRE —
FENCE WITHIN MINE X
WASTE CONSOLIDATION \
AREA FOOTPRINT \
TEST PIT TABLE
TEST PIT ID#
APPROX.
THICKNESS
OF MINE
WASTE (FT.)
TYPES OF MINE WASTE
ENCOUNTERED (ORDER AS
DEPTH INCREASES)
COMMENTS
TX-33-1
3.5
CHAT
TX-33-2
2
CHAT
TX-33-3
0.5
TAILINGS
ADJACENT TO N/S FENCE
TX-33-4
2
CHAT
TX-33-5
2.5
CHAT
IRON STAINING JUST ABOVE CLAY at 2.5 FT.
TX-33-6
2
CHAT
IRON STAINING JUST ABOVE CLAY AT 2 FT.
TX-33-7
1.5
CHAT
TX-33-8
2.5
CHAT
TX-33-9
3
CHAT
TX-33-10
2.75
CHAT
TX-33-11
1
CHAT, TAILINGS
TX-33-12
2.5
CHAT, TAILINGS
TX-33-13
2.5
CHAT, TAILINGS
TX-33-14
2.5
CHAT, TAILINGS
WATER AT 2.5 FT.
TX-33-15
5.5
CHAT, TAILINGS
TX-33-16
1.5
TAILINGS
TX-33-17
2.5
TAILINGS
TX-33-18
3
CHAT, TAILINGS
TX-33-19
6 +
CHAT
WATER AT 2 FT. HOLE COLLAPSED BEFORE
REACHING NATIVE SOIL.
TX-33-20
5 +
CHAT
WATER AT 1.5 FT. HOLE COLLAPSED BEFORE
REACHING NATIVE SOIL.
TX-33-21
6
CHAT, TAILINGS
WATER AT 5 FT.
XRF SCREENING RESULTS
SAMPLE ID#
DEPTH (FT.)
LEAD
(MG/KG)
ZINC
(MG/KG)
CADMIUM
(MG/KG)
COMMENTS
CK-19
SURFACE
959
17200
136
UPSTREAM OF BRIDGE AT 20TH ST, GRAY SILTY CLAY WITH TRACE FINE SAND
CK-20
SURFACE
199
2695
24
PRIMARILY CHAT
CK-21
SURFACE
140
5766
20
GRAY, SILTY CLAY WITH TRACE FINE SAND AND ORGANICS
CK-102
SURFACE
213
6603
45
PRIMARILY CHAT
CK-104
SURFACE
1351
17400
114
GRAY, SILTY CLAY WITH TRACE FINE SAND
TX-33-SS1
SURFACE
185
1016
ND
TX-33-SS2
SURFACE
42
285
ND
TX-33-SS3
SURFACE
762
7687
21
DARK BROWN, SILTY CLAY TOPSOIL (FIELD CHECK COORDINATES)
TX-33-SS4
SURFACE
673
10355
32
DARK BROWN, SILTY CLAY TOPSOIL (WATER ENTRY AT DEPTH OF 6")
TX-33-SS5
SURFACE
324
5993
14
DARK BROWN, SILTY CLAY TOPSOIL (WATER ENTRY AT DEPTH OF 6")
TX-33-SD1
0.5
288
13300
36
CHAT WITH TRACE CLAY (SATURATED)
TX-33-101
SURFACE
10600
647
116
TX-33-102
SURFACE
1528
230
0
TX-33-103
SURFACE
24800
1470
117
TX-33-104
SURFACE
12100
1845
126
TX-33-105
SURFACE
9456
713
96
0.25
9315
1822
73
TX-33-106
SURFACE
4721
232
25
TX-33-107
SURFACE
35200
866
197
TX-33-108
SURFACE
9119
928
90
TX-33-109
SURFACE
154000
1653
144
TX-33-110
SURFACE
22600
1627
204
TX-33-111
SURFACE
19000
1435
141
TX-33-112
SURFACE
16300
1784
145
TX-33-113
SURFACE
14100
1164
91
TX-33-114
SURFACE
2551
409
32
TX-33-115
SURFACE
9772
962
84
TX-33-116
SURFACE
686
171
0
TX-33-117
SURFACE
20900
4265
111
TX-33-118
SURFACE
13300
1547
172
TX-33-119
SURFACE
1716
362
23
TX-33-120
SURFACE
10100
934
83
EXCAVATION PLAN
AREA 2 (TX-33)
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
EXCAVATION PLAN NOTES:
(REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION)
1. THE AREA 2 (TX-33) MINE WASTE AREA IS CURRENTLY USED TO GRAZE LIVESTOCK AND IS LOCATED ADJACENT TO
CULTIVATED FIELDS. THE SITE CONTAINS DISCONTINUOUS AREAS OF SHALLOW CHAT AND OTHER MINE WASTE MIXED
WITH SOIL, LARGE AREA OF CHAT, TAILINGS, AREAS OF CONCRETE RUBBLE, AND VENT PIPES. THE CONTRACTOR
SHALL COORDINATE REMEDIAL ACTIVITIES WITH THE PROPERTY OWNERS AND PROVIDE TEMPORARY FENCING FOR
LIVESTOCK CONTROL, AS NEEDED, DURING THE REMEDIAL ACTIVITIES.
2. SITE ACCESS ROAD IS A GRAVEL TRAIL LOCATED ON THE SOUTHEASTERN EDGE OF THE LIMITS OF CONSTRUCTION
AS INDICATED ON THE CONTRACT DRAWING. THE GRAVEL TRAIL IS OFF SW20TH STREET. CONTRACTOR SHALL MAKE
IMPROVEMENTS TO THE ROAD AS NECESSARY. TRAFFIC CONTROL SHALL BE USED FOR ALL TRUCKS AND EQUIPMENT
ENTERING AND EXITING SITE IN ACCORDANCE WITH SECTION 02121. REFER TO NOTES ON SHEET G-03 REGARDING
THE CONTRACTOR'S RESPONSIBILITY FOR ANY DAMAGES TO THE EXISTING BRIDGE ON SW20TH STREET AND THE
BRIDGE ALONG THE EXISTING FARM TRAIL ACCESS ROAD TO AREA 2 LOCATED WEST OF SW20TH STREET.
3. AREA 2 IS LOCATED ADJACENT TO AREA 1. THE ABANDONED RAILROAD SHALL BE USED AS A TEMPORARY HAUL
ROUTE FROM AREA 1 TO THE AREA 2 MINE WASTE CONSOLIDATION AREA.
4. CONDUCT XRF ANALYSIS (FIELD XRF SCREENING WITH PORTABLE INSTRUMENT) WITHIN THE INITIAL
CONSTRUCTION LIMITS WHERE VISIBLE MINE WASTE IS NOT PRESENT AND OUTSIDE THE PROPOSED LIMITS OF
THE MINE WASTE CONSOLIDATION AREA TO IDENTIFY AREA(S) REQUIRING REMEDIATION. XRF SCREENING
SHALL BE CONDUCTED ON A 50-FOOT GRID IN ACCORDANCE WITH THE APPROVED QUALITY ASSURANCE PLAN
AS REQUIRED BY THE PERFORMANCE WORK STATEMENT. PROVIDE EPA WITH A SITE PLAN SHOWING THE GRID
LOCATIONS, XRF RESULTS, AND INTERPRETED AREAS REQUIRING EXCAVATION. THE PROPOSED AREAS OF
EXCAVATION SHALL BE APPROVED BY EPA PRIOR TO EXCAVATION. THE LIMITS OF CONSTRUCTION SHALL BE
REVISED AS NECESSARY TO OBTAIN ACCESS AND TO COMPLETE EXCAVATION OF ALL WASTE AND
CONTAMINATED SOIL.
5. FOR PURPOSES OF BIDDING, REFER TO TABLE 4 ON SHEET G-02 FOR ESTIMATED WASTE AND CONTAMINATED
SOIL VOLUMES. THE DEPTH OF EXCAVATION SHALL BE BASED ON CONFIRMATION SAMPLING IN ACCORDANCE
WITH SECTION 02111.
6. EXCAVATED MINE WASTE AND CONTAMINATED SOIL SHALL BE PLACED WITHIN THE AREA 2 MINE WASTE
CONSOLIDATION AREA SHOWN ON THE CONTRACT DRAWING.
7. EXCAVATE MINE WASTE OUTSIDE OF MINE WASTE CONSOLIDATION AREA FOOTPRINT IN ACCORDANCE WITH
SECTION 02111. PLACE THE EXCAVATED WASTE WITHIN THE WASTE CONSOLIDATION AREA AS SHOWN ON THE
DRAWING AND IN ACCORDANCE WITH SECTION 02111. THE FINAL EXCAVATION SURFACE SHALL BE GRADED IN
ACCORDANCE WITH SECTION 02111.
8. REMOVE VISIBLE MINE WASTE ALONG THE SHORELINE OF THE POND. POND SHALL BE DEWATERED IN THE AREA OF
THE EXCAVATION SHOWN AND IN ACCORDANCE WITH THE CONTRACTOR'S APPROVED DEWATERING AND SEDIMENT
MANAGEMENT PLAN. REMOVE VISIBLE MINE WASTE AND 12 INCHES OF SEDIMENT FROM THE AREA SHOWN.
9. EXCAVATE THE CREEK CHANNEL, BANK TO BANK, TO A DEPTH OF 18 INCHES BELOW THE EXISTING CHANNEL
BOTTOM TO REMOVE MINE WASTE AND CONTAMINATED SOIL. REFER TO SHEETS CS-01 THROUGH CS-06 FOR TYPICAL
EXCAVATION DETAILS. PLACE THE EXCAVATED MATERIALS WITHIN THE MINE WASTE CONSOLIDATION AREA.
FOLLOWING EXCAVATION, PERFORM XRF SCREENING OF SOIL SAMPLES ALONG THE FLOW LINE AT 100 FOOT
INTERVALS. PROVIDE THE SCREENING DATA TO EPA FOR EVALUATION BEFORE PLACING RIPRAP AND OTHER SITE
IMPROVEMENTS AS SHOWN ON THE DRAWINGS.
&EPA
U.S. Environmental
Protection Agency
Region 7
^nexaj
-------
DRAINAGE SWALE
MINE WASTE
CONSOLIDATION AREA
SEE NOTE 3
INSTALL MAINTENANCE
MONUMENT
SEE NOTE 7
RESTORE STREAM
SEE NOTE 5
SEE SHEET C-08
FOR STREAM
RESTORATION DETAILS
RESTORE AREA
AS NEEDED
SEE NOTE 2
NEWBURY RIFFLE /_
STA 37+38 \€D^
BERM/RIFFLE
TIE-IN
POOL IMPOUNDMENT.
BERM
BARBED-WIRE FENCE
SEE NOTE 8
DIVERSION TERRACE
SEDIMENT
EXCAVATION AREA
SEE NOTE 4
RIPRAP PROTECTED,
CHANNEL I
STREAM
-RESTORE STREAM
SEE NOTE 5
SEE SHEET C-09
FOR STREAM
RESTORATION DETAILS
DRAINAGE SWALE
INITIAL LIMITS OF
CONSTRUCTION
STRAW WATTLES
SEE NOTE 9
DRAINAGE LET DOWN
BARBED-WIRE FENCE
SEE NOTE 8
BARBED-WIRE FENCE
SEE NOTE 8
NEWBURY RIFFLE
STA 22+29
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
&EPA
U.S. Environmental
Protection Agency
Region 7
^nexaj
-------
EXCAVATION PLAN NOTES:
(REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION)
1. THE AREA 3 (TT-1, TC-2, TX-2, AND TX-47) MINE WASTE AREA IS CURRENTLY USED TO GRAZE LIVESTOCK AND IS LOCATED ADJACENT TO
CULTIVATED FIELDS. THE SITE CONTAINS DISCONTINUOUS AREAS OF SHALLOW CHAT AND OTHER MINE WASTE MIXED WITH SOIL, A
LARGE CHAT PILE, TAILINGS, AREAS OF CONCRETE RUBBLE, AND VENT PIPES. THE CONTRACTOR SHALL COORDINATE REMEDIAL
ACTIVITIES WITH THE PROPERTY OWNERS AND PROVIDE TEMPORARY FENCING FOR LIVESTOCK CONTROL, AS NEEDED, DURING THE
REMEDIAL ACTIVITIES.
2. SITE ACCESS IS THROUGH A GATE ALONG AN EXISTING FENCE LINE EAST OF SW20TH STREET LOCATED ON THE WESTERN EDGE OF
THE LIMITS OF CONSTRUCTION AND THROUGH A GATE ALONG AN EXISTING FENCE LINE NORTH OF STAR ROAD ON THE SOUTHERN EDGE
OF LIMITS OF CONSTRUCTION AS INDICATED ON THE CONTRACT DRAWING. CONTRACTOR SHALL MAKE IMPROVEMENTS TO ACCESS THE
SITE AS NECESSARY. TRAFFIC CONTROL SHALL BE USED FOR ALL TRUCKS AND EQUIPMENT ENTERING AND EXITING SITE IN
ACCORDANCE WITH SECTION 02121. REFER TO NOTES ON SHEET G-03 REGARDING THE CONTRACTORS RESPONSIBILITY FOR ANY
DAMAGES TO THE EXISTING BRIDGE ON SW20TH STREET.
3. AREA 4 IS LOCATED ADJACENT TO AREA 3. THE EXISTING TRAIL SHALL BE USED AS A TEMPORARY HAUL ROUTE FROM AREA 3 TO TC-3.
4. CONDUCT XRF ANALYSIS (FIELD XRF SCREENING WITH PORTABLE INSTRUMENT) WITHIN THE INITIAL CONSTRUCTION LIMITS WHERE
VISIBLE MINE WASTE IS NOT PRESENT AND OUTSIDE THE PROPOSED LIMITS OF THE MINE WASTE CONSOLIDATION AREA TO IDENTIFY
AREA(S) REQUIRING REMEDIATION. XRF SCREENING SHALL BE CONDUCTED ON A 50-FOOT GRID IN ACCORDANCE WITH THE APPROVED
QUALITY ASSURANCE PLAN AS REQUIRED BY THE PERFORMANCE WORK STATEMENT. PROVIDE EPA WITH A SITE PLAN SHOWING THE
GRID LOCATIONS, XRF RESULTS, AND INTERPRETED AREAS REQUIRING EXCAVATION. THE PROPOSED AREAS OF EXCAVATION SHALL BE
APPROVED BY EPA PRIOR TO EXCAVATION. THE LIMITS OF CONSTRUCTION SHALL BE REVISED AS NECESSARY TO OBTAIN ACCESS AND
TO COMPLETE EXCAVATION OF ALL WASTE AND CONTAMINATED SOIL.
5. FOR PURPOSES OF BIDDING, REFER TO TABLE 4 ON SHEET G-02 FOR ESTIMATED WASTE AND CONTAMINATED SOIL VOLUMES. THE
DEPTH OF EXCAVATION SHALL BE BASED ON CONFIRMATION SAMPLING IN ACCORDANCE WITH SECTION 02111.
6. EXCAVATE THE CREEK CHANNEL, BANK TO BANK, TO A DEPTH OF 18 INCHES BELOW THE EXISTING CHANNEL BOTTOM TO REMOVE
MINE WASTE AND CONTAMINATED SOIL. REFER TO SHEET CD-05 FOR TYPICAL EXCAVATION DETAILS. FOLLOWING EXCAVATION,
PERFORM XRF SCREENING OF SOIL SAMPLES ALONG THE FLOW LINE AT 100 FOOT INTERVALS. PROVIDE THE SCREENING DATA TO EPA
FOR EVALUATION BEFORE PLACING RIPRAP AND OTHER SITE IMPROVEMENTS AS SHOWN ON THE DRAWINGS.
7. VENT PIPES SHALL BE ABANDONED IN ACCORDANCE WITH SECTION 02521.
8. BRIDGE STRUCTURE CONSISTS OF CONCRETE ABUTMENTS AND STEEL BEAMS.
9. REFER TO NOTES ON SHEET G-02 FOR ADDITIONAL INFORMATION.
TEST PIT TABLE
TEST PIT ID#
APPROX.
THICKNESS
OF MINE
WASTE (FT.)
TYPES OF MINE WASTE
ENCOUNTERED (ORDER AS
DEPTH INCREASES)
COMMENTS
TT-1-1
3.5
TAILINGS
DRY
TT-1-2
3.5
TAILINGS
DRY
TT-1-3
8
TAILINGS
DRY
TT-1-4
7.5
TAILINGS
DRY
TT-1-5
0
NONE
DRY
TC-2-1
0
NONE
DRY
TC-2-2
0
NONE
DRY
TC-2-3
0
NONE
DRY
TC-2-4
6
CHAT, TAILINGS
MINOR SEEP AT 6 FT.
TC-2-5
2
CHAT, TAILINGS
CHAT PINCHED OUT IN MIDDLE OF PIT. WATER AT 2.75 FT.
TC-2-6
0.75
CHAT
SLOW SEEP AT 1 FT.
TC-2-7
0
NONE
SAMPLE COLLECTED OF SILT MATERIAL TO DETERMINE IF
WASTE. DRY.
TC-2-8
0
NONE
SAMPLE COLLECTED OF SILT MATERIAL TO DETERMINE IF
WASTE. DRY.
TC-2-9
0
NONE
SAME SILT MATERIAL AS ABOVE. DRY.
TC-2-10
0
NONE
SAME SILT MATERIAL AS ABOVE. DRY.
TC-2-11
1.5
CHAT
SAME SILT MATERIAL AS ABOVE. DRY.
TC-2-12
5.5
TAILINGS
DRY
TC-2-13
2.25
CHAT, TAILINGS
DRY
TC-2-14
2
TAILINGS, CHAT
DRY
TC-2-15
1.25
TAILINGS
WATER SEEP AT 4 FT.
TC-2-16
1
TAILINGS
DRY
TC-2-17
7 +
TAILINGS
HOLE COLLAPSED, NATIVE SOIL NOT ENCOUNTERED.
TC-2-18
3
TAILINGS
DRY
TC-2-19
6 +
CHAT, TAILINGS
WATER AT 3 FT. HOLE COLLAPSED, NATIVE SOIL NOT
ENCOUNTERED.
TC-2-20
2
TAILINGS, CHAT
TC-2-21
5 +
CHAT, TAILINGS
WATER SEEP AT 2.5 FT. HOLE COLLAPSED, NATIVE SOIL
NOT ENCOUNTERED.
N
r =
50 0
XRF SCREENING RESULTS
SAMPLE ID#
DEPTH
(FT.)
LEAD
(MG/KG)
ZINC
(MG/KG)
CADMIUM
(MG/KG)
COMMENTS
CK-17
SURFACE
253
7271
36
FINE CHAT WITH SILT/CLAY
CK-18
SURFACE
408
8016
50
DARK BROWN MIXTURE OF SILTY/CLAY WITH ROOTS/ORGAN ICS
CK-19
SURFACE
959
17200
136
UPSTREAM OF BRIDGE AT 20TH ST, GRAY SILTY CLAY WITH TRACE FINE SAND
TC-2-SS1
SURFACE
407
2205
ND
DARK BROWN, SILTY CLAY WITH CHAT
TC-2-SS2
SURFACE
1650
4516
17
DARK BROWN, SILTY CLAY TOPSOIL
TC-2-SS3
SURFACE
362
2937
ND
DARK BROWN, SILTY CLAY TOPSOIL (WATER ENTRY AT DEPTH OF 6")
TC-2-SS4
SURFACE
1424
5307
27
DARK BROWN, SILTY CLAY TOPSOIL
TC-2-100
SURFACE
8389
810
49
TC-2-101
SURFACE
3267
444
27
EXCAVATION PLAN
AREA 3 (TT-1, TC-2,
TX-2, TX-47)
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
J
ID
Z
>i
£
ili
m
Q UJ D <
Z o CD (0
D 111 5 Z
U_ LU <
E'rtfc-
&
<
a!e
t x =>
Z I- o
d a: o
LU O HI
o ° o i
St
X C-
LU CO
<
SHEET
IDENTIFICATION
C-04
-------
DRAINAGE SWALE
INITIAL LIMITS OF
CONSTRUCTION
BARBED-WIRE FENCE
SEE NOTE 5
•BARBED-WIRE FENCE
SEE NOTE 5
INSTALL 12"
HDPE CULVERT
DRAINAGE SWALE
DRAINAGE
SWALE
NEWBURY RIFFLE
STA 17+20
STREAM £
RESTORE STREAM
SEE NOTE 3
SEE SHEETS C-10 AND
C—11 FOR STREAM
RESTORATION DETAILS
RESTORE AREA
AS NEEDED
SEE NOTE 4
NEWBURY RIFFLE
STA 3+75
RESTORE STREAM
SEE NOTE 3
SEE SHEETS C-10 AND
C—11 FOR STREAM
RESTORATION DETAILS
NEWBURY RIFFLE
STA 9+69
RIPRAP PROTECTED
CHANNEL
RESTORATION PLAN NOTES:
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. THE RESTORATION REQUIREMENTS SHOWN ON THE DRAWINGS ARE
CONCEPTUAL AND MAY BE ADJUSTED OR MODIFIED BASED ON SITE
CONDITIONS FOLLOWING COMPLETION OF MINE WASTE EXCAVATION. THIS
AREA SHALL BE RESTORED SUCH THAT THE AREA CAN BE CULTIVATED IN
THE FUTURE.
2. COMPLETION OF SITE RESTORATION SHALL CONFORM TO SECTION 02300
AND THE FOLLOWING CRITERIA:
- THE EXCAVATED AREAS SHALL BE BACKFILLED WITH CLEAN, SILTY CLAY
BACKFILL AND 6 INCHES OF IMPORTED ORGANIC TOPSOIL, AS REFERENCED
IN THE CONTRACTOR'S APPROVED BORROW MANAGEMENT PLAN. BORROW
SOURCES SHALL BE APPROVED BY EPA PRIOR TO SITE RESTORATION.
REFER TO SECTION 02140 FOR ADDITIONAL INFORMATION.
- SITE DRAINAGE PATTERNS SHALL GENERALLY CONFORM TO THE
DIRECTIONAL ARROWS AS SHOWN ON THE DRAWINGS.
- THE EXCAVATED AREAS SHALL BE REGRADED AS NECESSARY TO PROVIDE
POSITIVE SURFACE DRAINAGE, WITH CROSS SLOPES OF 1 TO 3 PERCENT
AND MATCH THE SURROUNDING GRADE.
- REFER TO TABLE 5 ON SHEET G-02 FOR ESTIMATED VOLUME OF IMPORTED
FILL AND TOPSOIL.
3. EXCAVATED AREA WITHIN THE CREEK CHANNEL FROM SW20TH STREET
TO STAR ROAD WILL NOT BE BACKFILLED WITH THE EXCEPTION OF THE
CONSTRUCTION OF NEWBURY RIFFLES AS SHOWN ON THE DRAWINGS.
4. SEED WITH WETLAND SEED MIX IN THE DESIGNATED AREAS, IN
ACCORDANCE WITH SECTION 02955, AND IN ACCORDANCE WITH
CONTRACTOR'S APPROVED NORTHWEST TRIBUTARY RESTORATION PLAN.
REFER TO SHEET G-05 FOR DELINEATION OF WETLAND AREAS.
5. REPLACE BARBED WIRE FENCE WITH LIKE MATERIALS, IN THE
PRE-CONSTRUCTION LOCATION, AND IN ACCORDANCE WITH SECTION 02830,
AS NEEDED.
6. REFER TO NOTES ON SHEET G-02 FOR ADDITIONAL INFORMATION.
RESTORATION PLAN
AREA 3 (TT-1, TC-2,
TX-2, TX-47)
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
&EPA
U.S. Environmental
Protection Agency
Region 7
^nexaj<
Z O ID 10 ^ I—
- IU fP Z fe -
UJ 2: < < cnj
jiz O
£ Z f ° HO
t => a o < l-
j LLI O ijj ^ t-"
i d z iii O i
>
SHEET
IDENTIFICATION
C-05
-------
MINE WASTE TO
BE REMEDIATED
BY OTHERS
TEMPORARY HAUL ROUTE
FOR CHAT DISPOSAL FROM
AREA 3 TO TC-3
CULTIVATED
FIELD
INITIAL LIMITS OF
CONSTRUCTION
EXCAVATE MINE WASTE
SEE NOTE 4 & 6
WHEAT
TEMPORARY HAUL ROAD
TO DISPOSAL AREA 3
SEE NOTE 3
FINES
MIXED BULL
ROCK/CHAT
MARSH/GRASS
FINES/GRASS
TX-7N-2
MIXED BULL
ROCK/CHAT
MISC. CONCRETE
DEBRIS
-MISC. CHAT
ALONG TRAIL
FINES/BARE
SITE ACCESS FROM
STAR ROAD
SEE NOTE 2
MARSH/SWAMP
REMOVE MINE
WASTE FROM ROAD
DRAINAGE DITCH
F'NES/c H„
IMPOUNDED WATER
SEE NOTES 7 AND 8
¦SITE ACCESS
FROM STAR ROAD
LOCKED GATE
SEE NOTE 2
BERM OF CHAT/FINES
ALONG FENCE
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
CL O
2 Z
o
< j
uj oi
<
SHEET
IDENTIFICATION
C-06
EXCAVATION PLAN NOTES:
(REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION)
1. THE AREA 4 (TX-7 NORTH) MINE WASTE AREA CONTAINS DISCONTINUOUS
AREAS OF CHAT, TAILINGS, AND OTHER MINE WASTE MIXED WITH SOIL. THE
SURROUNDING SITE PROPERTY IS USED FOR AGRICULTURE.
2. SITE ACCESS ROAD IS VIA UNIMPROVED ACCESS ROADS FROM STAR ROAD
LOCATED ON THE SOUTHEASTERN AND SOUTHWESTERN EDGES OF THE
LIMITS OF CONSTRUCTION AS INDICATED ON THE CONTRACT DRAWING.
TRAFFIC CONTROL SHALL BE USED FOR ALL TRUCKS AND EQUIPMENT
ENTERING AND EXITING THE SITE IN ACCORDANCE WITH SECTION 02121.
3. AREA 4 IS LOCATED ADJACENT TO DISPOSAL AREA 3. THE EXISTING TRAIL
SHALL BE USED AS A TEMPORARY HAUL ROAD TO TC-3.
4. CONDUCT XRF ANALYSIS (FIELD XRF SCREENING WITH PORTABLE
INSTRUMENT) WITHIN THE INITIAL CONSTRUCTION LIMITS WHERE VISIBLE
MINE WASTE IS NOT PRESENT TO IDENTIFY AREA(S) REQUIRING
REMEDIATION. XRF SCREENING SHALL BE CONDUCTED ON A 50-FOOT GRID
IN ACCORDANCE WITH THE APPROVED QUALITY ASSURANCE PLAN AS
REQUIRED BY THE PERFORMANCE WORK STATEMENT. PROVIDE EPA WITH A
SITE PLAN SHOWING THE GRID LOCATIONS, XRF RESULTS, AND
INTERPRETED AREAS REQUIRING EXCAVATION. THE PROPOSED AREAS OF
EXCAVATION SHALL BE APPROVED BY EPA PRIOR TO EXCAVATION. THE
LIMITS OF CONSTRUCTION SHALL BE REVISED AS NECESSARY TO OBTAIN
ACCESS AND TO COMPLETE EXCAVATION OF ALL WASTE AND
CONTAMINATED SOIL.
5. FOR PURPOSES OF BIDDING, REFER TO TABLE 4 ON SHEET G-02 FOR
ESTIMATED WASTE AND CONTAMINATED SOIL VOLUMES. THE DEPTH OF
EXCAVATION SHALL BE BASED ON CONFIRMATION SAMPLING IN
ACCORDANCE WITH SECTION 02111.
6. EXCAVATE MINE WASTE IN ACCORDANCE WITH SECTION 02111.
EXCAVATED MINE WASTE AND CONTAMINATED SOIL FROM AREA 4 SHALL BE
DISPOSED IN ACCORDANCE WITH TABLE 3 ON SHEET G-02. THE FINAL
EXCAVATION SURFACE SHALL BE GRADED IN ACCORDANCE WITH SECTION
02111.
7. POND SHALL BE DEWATERED IN ACCORDANCE WITH THE CONTRACTOR'S
APPROVED DEWATERING AND SEDIMENT MANAGEMENT PLAN. REMOVE
VISIBLE MINE WASTE AND CONTAMINATED SOIL TO A DEPTH OF 1 FOOT
BELOW THE EXISTING GROUND SURFACE ELEVATION.
8. WATER FROM THE IMPOUNDMENT MAY BE EVAPORATED OR USED AS DUST
CONTROL SUPPRESSION IN CONTAMINATED MINE WASTE AREAS.
DEWATERING THIS POND MAY INCLUDE DISCHARGE OF WATER TO
DOWNGRADIENT AREAS THAT HAVE HISTORICALLY RECEIVED RUNOFF FROM
THESE WASTE AREAS.
9. REFER TO NOTES ON SHEET G-02 FOR ADDITIONAL INFORMATION.
TEST PIT TABLE
TEST PIT ID#
APPROX.
THICKNESS
OF MINE
WASTE (FT.)
TYPES OF MINE WASTE
ENCOUNTERED (ORDER AS
DEPTH INCREASES)
COMMENTS
TX-7N-1
2.75
CHAT
TX-7N-2
1.25
CHAT
POSSIBLE CLAY/SHALE TRANSITION AT
APPROXIMATELY 8.5'
TX-7N-3
0.8
TAILINGS
TX-7N-4
1.5
CHAT
SHALE ENCOUNTERED AT 7'
TX-7N-5
1.4
TAILINGS
XRF SCREENING RESULTS
SAMPLE ID#
DEPTH
(FT.)
LEAD
(MG/KG)
ZINC
(MG/KG)
CADMIUM
(MG/KG)
TX-7N-3
0.75-1.25
751
3390
18
4,0-4.25
130
151
< 12
EXCAVATION PLAN
AREA 4 (TX-7 NORTH)
-------
RESTORATION PLAN
AREA 4 (TX-7 NORTH)
RESTORATION PLAN NOTES:
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. THE GRADING AND RESTORATION REQUIREMENTS SHOWN ON THE
DRAWINGS ARE CONCEPTUAL AND MAY BE ADJUSTED OR MODIFIED BASED
ON SITE CONDITIONS FOLLOWING COMPLETION OF MINE WASTE
EXCAVATION.
2. COMPLETION OF SITE RESTORATION SHALL CONFORM TO SECTION 02300
AND THE FOLLOWING CRITERIA:
- SITE DRAINAGE PATTERNS SHALL GENERALLY CONFORM TO THE
DIRECTIONAL ARROWS AS SHOWN ON THE DRAWINGS.
- EXCAVATED AREAS SHALL BE REGRADED AS NECESSARY TO PROVIDE
POSITIVE SURFACE DRAINAGE, WITH CROSS SLOPES OF 1 TO 3 PERCENT
AND MATCH THE SURROUNDING GRADE.
- EXCAVATED AREAS REQUIRING FILL TO PROVIDE POSITIVE SURFACE
DRAINAGE SHALL BE BACKFILLED WITH CLEAN, SILTY CLAY
BACKFILL AND 6-INCHES OF TOPSOIL AS REFERENCED IN THE
CONTRACTOR'S APPROVED BORROW MANAGEMENT PLAN. BORROW
SOURCES SHALL BE APPROVED BY EPA PRIOR TO SITE RESTORATION.
- REFER TO TABLE 5 ON SHEET G-02 FOR ESTIMATED VOLUMES OF
IMPORTED FILL AND TOPSOIL.
3. UNIMPACTED SOIL FOR USE AS FILL DURING FINAL GRADING OR COVER
MATERIAL FOR MINE WASTE CONSOLIDATION AREA COVER THROUGH OVER
EXCAVATION WITHIN THE DETENTION BASIN. UNIMPACTED SOIL SHALL
CONFORM TO THE REQUIREMENTS OF SECTION 02140.
4. RECONSTRUCT ROAD DRAINAGE DITCH AND DIRECT FLOW TO THE WEST.
5. REPLACE BARBED WIRE FENCE AND GATE WITH LIKE MATERIALS IN THE
PRE-CONSTRUCTION LOCATION, AND IN ACCORDANCE WITH SECTION 02830,
AS NEEDED.
6. SEED ALL DISTURBED AREAS WITH A NATIVE GRASS SEED MIXTURE IN
ACCORDANCE WITH SECTION 02921. SEED WITH WETLAND SEED MIX IN THE
DESIGNATED AREAS, IN ACCORDANCE WITH SECTION 02955. REFER TO
SHEET G-05 FOR DELINEATION OF WETLAND AREAS.
7. REFER TO NOTES ON SHEET G-02 FOR ADDITIONAL INFORMATION.
N
1" = 100'
50 0 100
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
s&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
|=3
J
mi
XI
>n
Pi
o">
w I- CO
Q UJ 3 <
z o m co
? W £ 5
Q~ , CO •>-"
Z t X 3
z 3 % °
3 111 O m
8 g * *
V (~)
iu m (Y
gggi
2 ° o o
-g
z: z
o ^
o ^
i— <
SHEET
IDENTIFICATION
C-07
-------
POOL IMPOUNDMENT/ 1 >
BERM SEE NOTE 2 \pD-05J
BERM/RIFFLE
TIE-IN
NEWBURY RIFFLE
STA 37+38
STREAM Q.
37+00
33+00
MINE WASTE
CONSOLIDATION AREA
SEE SHEET C-02
DRAINAGE SWALE
' ' \ MAINTENANCE
iCD-01/ MONUMENT
DRAINAGE SWALE
DRAINAGE
LET DOWN
STRAW WATTLES
DIVERSION TERRACE
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
XRF SCREENING RESULTS - TEST PIT TABLE
LEAD
(MG/KG)
ZINC
(MG/KG)
CADMIUM
(MG/KG)
CHAT W/ TRACE CLAY (SATURATED)
GRAY, SILTY CLAY WITH TRACE FINE SAND
AND ORGANICS
&EPA
U.S. Environmental
Protection Agency
Region 7
^nexa+
SHEET
IDENTIFICATION
C-08
2. TOP OF BERM IS TO BE TIED IN TO EL. 846'.
1. NEWBURY RIFFLE STATIONING INDICATES LOCATION OF RIFFLE CREST.
SEE DETAIL (SHEET CD-03) FOR ADDITIONAL INFORMATION.
NORTHWEST TRIBUTARY -
STREAM RESTORATION PLAN 1
NOTE:
(REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION)
-------
MATCH LINE
FOR CONTINUATION SEE SHT C-10
NEWBURY RIFFLE
STA 22+29
STREAM
¦RIPRAP PROTECTED,
CHANNEL
MINE WASTE
CONSOLIDATION AREA
SEE SHEET C-02
STRAW WATTLES
DRAINAGE SWALE
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
NOTE:
(REFER TO SPECIFICATION FOR ADDITIONAL
INFORMATION)
1. NEWBURY RIFFLE STATIONING INDICATES LOCATION
OF RIFFLE CREST. SEE DETAIL (SHEET CD-03) FOR
ADDITIONAL INFORMATION.
XRF SCREENING RESULTS - TEST PIT TABLE
SAMPLE ID#
LEAD
(MG/KG)
ZINC
(MG/KG)
CADMIUM
(MG/KG)
COMMENTS
TX-33-SS1
185
1016
ND
TX-33-SS3
762
7687
21
DARK BROWN, SILTY
CLAY TOPSOIL
TX-33-SS4
673
10355
32
DARK BROWN, SILTY
CLAY TOPSOIL
(WATER ENTRY AT 6")
TX-33-SS5
324
5993
14
DARK BROWN, SILTY
CLAY TOPSOIL
(WATER ENTRY AT 6")
CK-20
199
2695
24
PRIMARILY CHAT
CK-102
213
6603
45
PRIMARILY CHAT
CK-104
1351
17400
114
GRAY SILTY CLAY
WITH TRACE FINE
SAND
&EPA
U.S. Environmental
Protection Agency
Region 7
^nexaj
SHEET
IDENTIFICATION
C-09
NORTHWEST TRIBUTARY -
STREAM RESTORATION PLAN 2
-------
mm, «¦»:
TWm®P
MMmmm
WiSr«K>;
"-^As V^W«%;
S^S\\ »f%
DRAINAGE SWALE
NEWBURY RIFFLE
STA 9+69
EXISTING CONCRETE
STRUCTURES TO REMAIN
MATCH LINE
STREAM
SHEET
IDENTIFICATION
C-10
NOTE:
(REFER TO SPECIFICATION FOR ADDITIONAL
INFORMATION)
1. NEWBURY RIFFLE STATIONING INDICATES LOCATION
OF RIFFLE CREST. SEE DETAIL (SHEET CD-03) FOR
ADDITIONAL INFORMATION.
NORTHWEST
TRIBUTARY - STREAM
RESTORATION PLAN 3
SAMPLE ID#
LEAD
(MG/KG)
ZINC
(MG/KG)
CADMIUM
(MG/KG)
-------
lisS)
<£. OF OVERFLOW
CHANNEL
3 - 30" 0
HDPE CULVERTS
DETENTION BASIN
OUTLET STRUCTURE
AND PLUNGE POOL
RIPRAP APRON
KDOT LIGHT SERIES
)i TON GRADATION
NEWBURY RIFFLE
STA 3+75
RIPRAP PROTECTED|
CHANNEL
STREAM
SHEET
IDENTIFICATION
NOTE:
(REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION)
1. NEWBURY RIFFLE STATIONING INDICATES LOCATION OF RIFFLE CREST.
SEE DETAIL (SHEET CD-03) FOR ADDITIONAL INFORMATION.
NORTHWEST TRIBUTARY -
STREAM RESTORATION PLAN 4
-------
-MIN.0'-6" OVERLAP
AT JOINTS. AVOID
JOINTS UNLESS NECESSARY.
- STAKE OR POST
(2"x2"x5'-0" MIN. OAK OR 4"x4"x5,-0" MIN. PINE)
(5'-0" MIN. "U" OR "T" SECTION STEEL POST WITH
\mIN. 1.33 POUNDS/LINEAR FOOT WEIGHT)
tH®,
FIRST STAKE OR POST SHALL BE DRIVEN
TOWARD PREVIOUSLY LAID BALE
• FILTER FABRIC BURY TOE
OF FABRIC A MINIMUM
OF 0'-4".
ELEVATION
SILT FENCE NOTE:
A PREASSEMBLED SILT
FENCE MEETING THE
REQUIREMENTS OF THIS
DETAIL AND THE
SPECIFICATION IS
ACCEPTABLE IN LIEU OF A
FIELD CONSTRUCTED
FENCE.
INSTALL BALES WITH BINDINGS
ON SIDES OF BALES
SOIL COMPACTED OVER
FILTER FABRIC
SECTION
2"x2"x3'-0" MINIMUM WOOD STAKES (OAK OR PINE)
OR 3-0" MINIMUM "U" OR "T" SECTION STEEL POSTS
WITH MINIMUM 1.33 POUNDS/LINEAR FOOT WEIGHT
SILT FENCE
DETAIL f 1
NTS
STRAW BALE
DETAIL {2
NTS
VARIES
(2'-0" MIN.")
15-0"
SEED
SEE NOTE 5
FINISH GRADE
DRAINAGE DITCH
DETAIL r$
TEMPORARY DRAINAGE SWALE (TYP)
DETAIL /T
SEED
- SEE NOTE 5
SEED
SEE NOTE 5
'
-6" TOPSOIL LAYER
SEE NOTE 3
-12" SELECT FILL
SEE NOTE 4
-BACKFILL SUBGRADE
12" TOPSOIL LAYER
SEE NOTE 3
3' SELECT FILL
SEE NOTE 4
BACKFILL SUBGRADE
- 4" DIAMETER SCHEDULE 40 STEEL
PIPE FILLED WITH CONCRETE
SEE NOTE 6
>>/py>x
COVER SYSTEM PROFILE
(MINE WASTE CONSOLIDATION AREA)
DETAIL
COVER SYSTEM PROFILE (SELECT AREAS
OUTSIDE OF MINE WASTE CONSOLIDATION AREA)
DETAIL
MAINTENANCE MONUMENT
DETAIL (1
NTS
NOTES:
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. CONSTRUCTION OF SILT FENCE AND STRAW BALES SHALL BE AS
SPECIFIED IN SECTION 02910.
2. CONSTRUCTION OF DIVERSION DITCHES AND SWALES SHALL BE AS
SPECIFIED IN SECTION 02910. DIVERSION DITCHES AND SWALES SHALL
HAVE A MAXIMUM CHANNEL SLOPE OF 2 PERCENT AND BE ADEQUATELY
COMPACTED TO PREVENT FAILURE.
3. TOPSOIL SHALL MEET THE REQUIREMENTS OF SECTION 02140.
4. SELECT FILL SHALL MEET THE REQUIREMENTS OF SECTION 02140.
5. SEED SHALL MEET THE REQUIREMENTS OF SECTION 02921.
6. MAINTENANCE MONUMENTS SHALL MEET THE REQUIREMENTS OF
SECTION 02140.
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
s&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
|=3
J
mi
XI
>n
w I- CO
Q 111 D <
z o m co
— I D
; z i— O
• 3 a: o
I ill O mi
uj K y
gggi
2 ° o o
LU
Q
>
O
SHEET
IDENTIFICATION
CD-01
-------
- STRAW WATTLE I
- GRADE TO DRAIN FROM
CENTER OF DIVERSION
TERRACE TO LET DOWN
SLOPE
VARIES
SLOPE
VARIES
NOTES:
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. EROSION CONTROL BLANKET SHALL CONFORM TO THE
REQUIREMENTS OF SECTION 02910.
2. ANCHOR EROSION CONTROL BLANKET IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
3. WATTLES SHALL CONFORM TO SECTION 02910. INSTALL
WATTLES IN ACCORDANCE WITH SECTION 02910. PERFORM
MAINTENANCE IN ACCORDANCE WITH SECTION 02910. WATTLES
SHALL BE INSPECTED REGULARLY, AND IMMEDIATELY AFTER A
RUNOFF PRODUCING RAINFALL, TO ENSURE THEY REMAIN
THOROUGHLY ENTRENCHED AND IN CONTACT WITH THE SOIL.
- EROSION CONTROL
BLANKET
SEE NOTE 1
- ANCHOR EROSION
CONTROL BLANKET
SEE NOTE 2
DIVERSION TERRACE CROSS SECTION (TYP)
DETAIL /T
EROSION CONTROL
SEE
EROSION CONTROL BLANKET
SEE NOTE 1
DRAINAGE LET DOWN
DETAIL
MINIMUM OF 10 FOOT
PER SECOND VELOCITY
SEE NOTE 2
DRAINAGE SWALE
DETAIL
INSTALL TRM WITH
PROTECTION PERFORMANCE
MINIMUM OF 10 FOOT
PER SECOND VELOCITY
ANCHOR EROSION
CONTROL BLANKET
SEE NOTE 2
-STRAW WATTLES
SEE NOTE 3
3/4" x 3/4" WOODEN
STAKE (TYPICAL)
2" MIN.
3" MAX.
STAGGER JOINTS
(TYPICAL)
STAKE AT EACH END
AND 4' MAX. O.C. ALONG
ENTIRE LENGTH
PLAN
ELEVATION
STRAW WATTLE
DETAIL ^4^\
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
s&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
|=3
J
mi
XI
>n
w I- CO
Q 1U D <
z o m co
— I D
; z i— O
• 3 a: o
I ill O mi
uj K y
gggi
2 ° o o
LU
Q
>
O
SHEET
IDENTIFICATION
CD-02
-------
- CREST ELEVATION
SEE NOTE 6
EXISTING STREAMBED
4
FILTER
y— EXISTING
—1
f~ FABRIC
/ STREAMBED
3' MIN. BOULDER OR
QUARRY STONE
INSERT SMALL DIAMETER STONE
BETWEEN BOULDERS/QUARRY
STONES
UNDISTURBED, IN-SITU
NATIVE SOIL MATERIAL
EXIST GROUND
SURFACE (TYP.)
PLAN
NOTES:
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. RIPRAP SHALL CONFORM TO THE REQUIREMENTS OF SECTION 02209.
2. STREAM SHALL BE DISTURBED AS LITTLE AS POSSIBLE DURING CONSTRUCTION.
3. UPSTREAM FACE OF RIFFLES SHALL BE CONSTRUCTED AT 2' HORIZONTAL TO 1' VERTICAL SLOPE.
DOWNSTREAM FACE OF RIFFLES SHALL BE CONSTRUCTED AT 4' HORIZONTAL TO 1' VERTICAL SLOPE.
SHOULD THE DOWNSTREAM FACE EXTEND GREATER THAN 50' FROM THE CREST, THE FACE SHALL BE MADE
TO EXTEND 50' DOWNSTREAM AND AN EVEN SLOPE CONSTRUCTED FROM THE CREST DOWN.
50
4. UPSTREAM AND DOWNSTREAM WIDTHS SHALL EXTEND ACROSS THE CHANNEL BOTTOM.
5. MINIMUM THICKNESS OF RIPRAP SHALL BE 1.5 xD .
6. CREST OF NEWBURY RIFFLE SHALL EXTEND 18 INCHES ABOVE PRE-REMEDIATION CHANNEL INVERT
ELEVATION.
7. WHILE THE SLOPE OF THE EARTHEN BANKS SHOWN IN SECTION B OF THIS SHEET MAY VARY,
CONTRACTOR SHALL ENSURE THAT THE EARTHEN SLOPE IS SUITABLE FOR PLACEMENT OF FILTER FABRIC
SUCH THAT THE FABRIC IS STABLE.
POST REMEDIATION
GROUND
SURFACE (TYP.)
FILTER FABRIC
BANK RIPRAP -
KDOT LIGHT 24" GRADATION
1.5 x D50.
RIFFLE RIPRAP -
KDOT LIGHT 24" GRADATION
1.5 x Dsq.
NEWBURY RIFFLE
DETAIL /M
NTS
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
s&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
h §
in a: 5
£ Z H
o 5
:r. < :
q i tt I
O O o O
-------
EXIST GRADE (TYP)
1.5 x D50THICK
ON BANKS
I.SxDsoTHICKON
STREAMBED
EXTEND TO TOP OF BANK
TOP OF RIPRAP BLANKET
TO MATCH WITHIN 6" OF
EXISTING GRADE AT
CHANNEL BOTTOM
3 - 30" 0 HDPE
CULVERTS 120' LONG
- FLARED END SECTIONS
TO BE INSTALLED ON ALL
CULVERTS ON UPTREAM
AND DOWNSTREAM ENDS
GEOTEXTILE BLANKET
REFER TO SPECIFICATION
SECTION 02216
KDOT LIGHT SERIES
24" GRADATION
RIPRAP APRON
DETAIL f' 1
NTS
- EXIST CULVERT
UNDER STAR ROAD
INVERT EL. 831.5'
3:1 SIDE
SLOPE
1.5 X DsoTHICK LAYER OF
KDOT LIGHT SERIES 18" GRADATION
GEOTEXTILE BLANKET
REFER TO SPECIFICATION
SECTION 02216
3 - 30" 0 PIPES
DETENTION BASIN EMERGENCY SPILLWAY
DETAIL r*
NTS
PLUNGE POOL
PLAN
NTS
TOEWALL FOR
PERMANENT PLUNGE
POOLS
WOVEN
GEOTEXTILE
PLUNGE POOL
SECTION /X
(REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
1. PRIOR TO CONSTRUCTION OF DAM, EXCAVATION SHALL BE COMPLETED TO EXPOSE NATIVE
SOILS COMPETENT ENOUGH TO STRUCTURALLY SUPPORT THE DAM.
2. USE SPECIFIED CLASS OF RIPRAP. AS SHOWN ON DRAWINGS.
3. USE WOVEN GEOTEXTILE AS SPECIFIED IN SPECIFICATION SECTION 02216, AND PROTECT
FROM PUNCHING, CUTTING, OR TEARING. REPAIR ANY DAMAGE OTHER THAN AN OCCASIONAL
SMALL HOLE BY PLACING ANOTHER PIECE OF GEOTEXTILE OVER THE DAMAGED PART OR BY
COMPLETELY REPLACING THE GEOTEXTILE. PROVIDE A MINIMUM OF ONE FOOT OVERLAP FOR
ALL REPAIRS AND FOR JOINING TWO PIECES OF GEOTEXTILE.
4. PREPARE THE SUBGRADE FOR THE PLUNGE POOL. COMPACT ANY FILL REQUIRED IN THE
SUBGRADE TO A DENSITY OF APPROXIMATELY THAT OF THE SURROUNDING UNDISTURBED
MATERIAL.
5. EMBED THE GEOTEXTILE A MINIMUM OF 4 INCHES AND EXTEND THE GEOTEXTILE A MINIMUM
OF 6 INCHES BEYOND THE EDGE OF THE SCOUR HOLE.
6. STONE FOR THE PLUNGE POOL MAY BE PLACED BY EQUIPMENT. CONSTRUCT TO THE FULL
COURSE THICKNESS IN ONE OPERATION AND IN SUCH A MANNER AS TO AVOID DISPLACEMENT
OF UNDERLYING MATERIALS. DELIVER AND PLACE THE STONE FOR THE PLUNGE POOL IN A
MANNER THAT WILL ENSURE THAT IT IS REASONABLY HOMOGENEOUS WITH THE SMALLER
STONES AND SPALLS FILLING THE VOIDS BETWEEN THE LARGER STONES. PLACE STONE FOR
THE PLUNGE POOL IN A MANNER TO PREVENT DAMAGE TO THE GEOTEXTILE. HAND PLACE TO
THE EXTENT NECESSARY.
7. AT THE PLUNGE POOL OUTLET, PLACE THE STONE SO THAT IT MEETS THE EXISTING GRADE.
8. RIPRAP SHALL CONFORM TO THE REQUIREMENTS OF SECTION 02209.
DETENTION BASIN OUTLET STRUCTURE
DETAIL /T
NTS
POST MINE
WASTE REMOVAL
GRADE (TYP)
POST MINE WASTE -
POST MINE WASTE
REMOVAL GRADE (TYP)
DETENTION BASIN EMERGENCY SPILLWAY CHANNEL
DETAIL /T
NTS
STREAM UPSTREAM OF DETENTION BASIN
DETAIL r*
NTS
NOTE:
EXISTING DITCH TO BE RECONSTRUCTED WITHIN MINE
WASTE REMOVAL AREA AND NO EARTHWORK SHALL BE
COMPLETED OUTSIDE OF PROJECT BOUNDARIES.
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
s&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
h 8
Q HI 3 <
Z O CO W
=> in a: 5
£ Z H
o 5
:r. < :
q i tt I
O O o O
-------
KDOT LIGHT SERIES
KDOT LIGHT SERIES
1
ELEVATION 846'
RIPRAP KDOT LIGHT SERIES FACING
GRADATION 1.5' THICK LAYER
/—EXIST. GRADE (TYP)
ELEVATION 846'
TIE IN TO EXISTING GROUND-
POOL IMPOUNDMENT BERM
DETAIL
NTS
ELEVATION 846'
EXIST. GRADE (TYP)
EXISTING
STREAMBED
ELEVATION
BERM/RIFFLE TIE-IN
DETAIL
EXIST. CHANNEL
BOTTOM (TYP)
TYPICAL CREEK CHANNEL EXCAVATION/RESTORATION
DETAIL
NTS
NOTES:
1. CONDUCT XRF ANALYSIS (FIELD XRF SCREENING) WITH PORTABLE
INSTRUMENT) LEFT AND RIGHT OF CREEK CHANNEL TO ESTABLISH LIMITS OF
EXCAVATION. SAMPLES FOR XRF ANALYSIS SHALL BE COLLECTED ALONG
TRANSECTS SPACED 50 FEET APART (E.G., STATIONS 0+50, 1+00, 1+50,...).
SOIL SAMPLES FOR ANALYSIS SHALL BE SPACED 10 FEET ON-CENTER ALONG
EACH TRANSECT. ALL SAMPLING AND ANALYSIS SHALL BE IN ACCORDANCE
WITH THE APPROVED QUALITY ASSURANCE PLAN REQUIRED BY THE
PERFORMANCE WORK STATEMENT. THE CONTRACTOR'S PROPOSED LIMITS
OF EXCAVATION SHALL BE APPROVED BY EPA PRIOR TO EXCAVATION.
2. THE DEPTH OF EXCAVATION IS EXPECTED TO VARY FROM
APPROXIMATELY 6 TO 18 INCHES. THE FINAL DEPTH OF EXCAVATION SHALL
BE DETERMINED IN THE FIELD BASED ON CONFIRMATION SAMPLING
CONDUCTED BY THE CONTRACTOR.
3. THE EXCAVATED AREAS LEFT AND RIGHT OF THE CREEK CHANNEL SHALL
BE BACKFILLED WITH CLEAN FILL (AS APPROVED BY EPA) AND TOPSOIL
(MINIMUM 6 INCHES) SPACED TO WITHIN 6 INCHES OF THE PRE-EXCAVATION
TOPOGRAPHY AND SLOPED TO ACHIEVE POSITIVE SURFACE DRAINAGE
TOWARDS THE CREEK CHANNEL.
4. EXCAVATION ALONG THE BOTTOM OF THE CREEK CHANNEL IS REQUIRED
TO REMOVE MINE WASTE AND IMPACTED SEDIMENTS. FOR PURPOSES OF
BIDDING, THE CONTRACTOR SHALL ASSUME EXCAVATION OF UP TO 6 INCHES
OF MINE WASTE AND 12 INCHES OF IMPACTED SEDIMENT. THE DEPTH OF
EXCAVATION OF IMPACTED SEDIMENT SHALL BE MEASURED FROM THE
EXISTING CHANNEL BOTTOM. THE ACTUAL DEPTH OF EXCAVATION MAY BE
REDUCED IN THE FIELD BASED ON THE ABSENCE OF MINE WASTE AND/OR
THE PRESENCE OF BEDROCK AT SHALLOW DEPTHS. DURING EXCAVATION,
SOIL SAMPLES FOR XRF ANALYSIS SHALL BE COLLECTED AND ANALYZED BY
THE CONTRACTOR TO GUIDE DECISIONS BY EPA ON THE FINAL DEPTH OF
EXCAVATION. THE SOIL SAMPLES SHALL BE COLLECTED ALONG THE
CENTER-LINE OF THE CREEK CHANNEL AT 50 FOOT INTERVALS (STATIONS
0+50, 1+00, 1+50,...). WHEN EXCAVATION IS COMPLETED, THE CREEK
CHANNEL SHALL BE FLAT BOTTOMED AS SHOWN ON THE TYPICAL DETAIL.
5. FOLLOWING EXCAVATION OF THE BOTTOM OF THE CHANNEL, THE
EXISTING SIDE SLOPES SHALL BE EXCAVATED TO REMOVE A MINIMUM OF 6
INCHES OF MATERIAL AND/OR TO ACHIEVE A MAXIMUM SLOPE OF 2.5
HORIZONTAL TO 1 VERTICAL. WHEN EXCAVATION OF THE SIDE SLOPES IS
COMPLETED, THE SIDE SLOPES SHALL BE SMOOTH AND UNIFORM IN
CROSS-SECTION TO RECEIVE RIPRAP, EROSION CONTROL MATERIALS, AND
SEED PLACEMENT WITHIN THE AREAS SHOWN ON THE DRAWINGS.
FOR EPA USE IN PREPARING
CONTRACT DOCUMENTS
s&EPA
U.S. Environmental
Protection Agency
Region 7
Lenexa, Kansas
h 8
Q HI 3 <
Z o CO w
=> in a: 5
£ z H
o 5
:r. < :
q i tt I
O O o O
------- |