Table 1

Community Roving Air Monitoring Results Summary Table
East Palestine Derailment Emergency Response
East Palestine, Ohio
Monitoring Period: 06/01/2023 08:22 to 06/01/2023 17:14





VOC (ppm)

PM2 5 (mg/m3)1

PM10 (mg/m3)1

Location

Date/Time

Screening Levels





0.5 ppm

0.035 mg/m3

0.070 mg/m3

PCR-N-03

6/1/2023 8:30

0

0.024

0.032



6/1/2023 14:23

0

0.017

0.021

PCR-N-04

6/1/2023 9:48

0

0.019

0.026



6/1/2023 15:33

0

0.013

0.017

PCR-N-05

6/1/2023 9:55

0

0.024

0.033



6/1/2023 15:40

0

0.021

0.033

PCR-N-06

6/1/2023 8:34

0

0.018

0.023



6/1/2023 15:18

0

0.013

0.016

PCR-N-07

6/1/2023 8:35

0

0.025

0.032



6/1/2023 14:29

0

0.017

0.021

PCR-N-08

6/1/2023 8:39

0

0.021

0.025



6/1/2023 14:43

0

0.016

0.019

PCR-N-09

6/1/2023 8:44

0

0.017

0.021



6/1/2023 14:49

0

0.014

0.018

PCR-N-10

6/1/2023 8:48

0

0.02

0.025



6/1/2023 14:55

0

0.014

0.016

PCR-N-11

6/1/2023 10:02

0

0.022

0.038



6/1/2023 15:50

0

0.016

0.018

PCR-N-12

6/1/2023 10:07

0

0.017

0.021



6/1/2023 15:56

0

0.019

0.029

PCR-N-13

6/1/2023 9:40

0

0.019

0.024



6/1/2023 15:28

0

0.013

0.016

PCR-S-01

6/1/2023 11:18

0

0.019

0.026



6/1/2023 17:14

0

0.013

0.015

PCR-S-04

6/1/2023 11:04

0

0.017

0.019



6/1/2023 17:03

0

0.014

0.017

PCR-S-05

6/1/2023 10:53

0

0.017

0.02



6/1/2023 16:51

0

0.014

0.016

PCR-S-06

6/1/2023 10:46

0

0.017

0.019



6/1/2023 16:44

0

0.017

0.027

PCR-S-07

6/1/2023 10:41

0

0.018

0.022



6/1/2023 16:40

0

0.015

0.019

PCR-S-08

6/1/2023 10:37

0

0.023

0.036



6/1/2023 16:37

0

0.017

0.026

PCR-S-09

6/1/2023 11:01

0

0.019

0.022



6/1/2023 16:58

0

0.014

0.018

We are in the process of ensuring this document is accessible to all audiences. If you need assistance accessing this
document, or any materials on the EPA East Palestine, Ohio emergency response webpages, please contact the Region 5
Public Information Officer on-call r5_eastpalestine@epa.gov


-------
Table 1

Community Roving Air Monitoring Results Summary Table
East Palestine Derailment Emergency Response
East Palestine, Ohio
Monitoring Period: 06/01/2023 08:22 to 06/01/2023 17:14





VOC (ppm)

PM2 5 (mg/m3)1

PM10 (mg/m3)1

Location

Date/Time

Screening Levels





0.5 ppm

0.035 mg/m3

0.070 mg/m3

PCR-S-10

6/1/2023 8:22

0

0.028

0.041



6/1/2023 14:14

0

0.02

0.025

PCR-S-14

6/1/2023 10:19

0

0.016

0.019



6/1/2023 16:06

0

0.014

0.016

PCR-S-15

6/1/2023 10:23

0

0.021

0.029

PCR-S-16

6/1/2023 10:31

0

0.016

0.018



6/1/2023 16:25

0

0.015

0.019

Notes:

Highlighted indicate detections above screening levels

1 - Site-Specific Public Health Screening Levels for particulate matter are based on 24-hour time-weighted
averages (TWAs). Fixed discrete monitoring readings are discrete readings, and so do not represent conditions
over a full 24-hour period. Screening levels were modified on March 16, 2023 to reflect updated operation
procedures on when to apply mitigation methods to reduce dust. Action levels set by health departments have not
changed.

* - the screening level is the instrument's limit of detection.

1 - A secondary instrument was used to evaluate CO and reported CO as non-detected. The elevated CO measurem

PM10 - particles that are 10 micrometers and smaller

ppm - parts per million

TWA - time-weighted average

VOC - volatile organic compounds


-------
x Gould
UN
{Rpnd

AfcCKif® Avo

© XSf E Grant-

»¦ ilM

W Grant

E M artist

ffi Martin si

w Clark St

,gflart Rd

Park Ave

State
Gamelarids No
285

Jimtown

Legend

O Roaming Air Monitoring Locations
Derailment Location
One Mile Radius

East Palestine Derailment ER Site
East Palestine, Columbiana County, OH 44413





Figure 1

Roaming Air Monitoring

Community Locations





TETRA TECH

Prepared For: EPA

Prepared By: TetraTech Inc.

Reference Map

Location

Date Saved: 5/12/2023


-------