Ready for Reuse
Temple Terrace Residential Property

11110 North 56th Street, Temple Terrace, Florida 33617

Images from left to right: Apartment complex playground, pool and leasing office, nearby construction, and tennis courts at
the apartment complex.

Site Name: Normandy Park Apartments Superfund Site
Size: 9 acres

Existing Site Infrastructure: Water, sewer, electricity and natural gas utilities are available on site.
Readiness for Reuse: A 1.2 acre field on the southern part of the site is ready for reuse. The rest
of the site is in continued use, as part of The Park at Monument Terrace, a 144-unit apartment
complex.

Use Restrictions: A restrictive covenant requires that the property owner, Normandy United
LCC, notify EPA and the state of Florida prior to disturbance of any existing structures, restricts
construction of groundwater wells or use of groundwater on site, and requires maintenance of
all asphalt byways and parking lots. The area has been developed for many years. Municipal water
supplies service area businesses and homes.

SETTING:

•	The site is zoned for residential land uses.

•	Surrounding areas are zoned for residential, commercial
and institutional uses.

•	Site surroundings include Temple Terrace City Hall (north),
a vacant lot and a bank (south), Temple Terrace Public
Works, apartments and a hospice care center (north) and a
shopping center (east).

•	The Park at Monument Terrace includes a playground,
an apartment clubhouse, a swimming pool and a laundry
facility. The northern courtyard has 80 residential units in
eight buildings. The southern courtyard has 64 residential
units in four buildings.

•	As of December 2016, I 'PA had data on one on-site
business. The Park at Monument Terrace employs four
people.

•	Surrounding population: 0.5 mile, 3,382 people
2.5 miles, 74,736 people j 4 miles, 159,600 people.

THscldmefl EPA does not warrant that the property is suitable
for any particular use. Prospective purchasers must contact the
property owner for sale potential.

REMEDIAL STATUS:

•	Cleanup included excavating contaminated source material
and containing remaining contaminated soil beneath clean fill,
concrete caps, tree plazas and existing structures on site.

•	One swimming pool was filled in in 2012. Tennis courts were
removed and replaced with clean soil m 2014.

•	Monitored natural attenuation of groundwater contamination
is ongoing. Periodic sampling will continue until groundwater
contamination meets cleanup goals.

FOR MORE INFORMATION,, PLEASE CONTACT:

Bill Denman	Shelby Johnston

Superfund Reuse Coordinator	Remedial Project Manager

Phone:: (404) 562-8939	Phone: (404) 562-8287

Email: denman.bill@epa.gov	Email: johnston.shelby @ep a. gov

Superfund Division
LIS. EPA Region 4
61 Forsyth Street SW
Atlanta, Georgia 30303

Site Summary: www.epa.gov/superfund/normandy-park-apartments

EPA Region 4 Reuse Fact Sheets

September 2017


-------