DRAFT Table 1
Continuous Air Monitoring Results
East Palestine Derailment Site
East Palestine, Columbiana County, Ohio

Monitoring Period: 02/10/2023 09:56 to 02/11/2023 15:40

Air Monitoring
Instrument

Analyte

Screening Level

Screening Level
Exceeded?

8-hour Period
Concentration Range

Average of All
8-hour Periods

AreaRAE Pro
S/N: W01A00000609

VOC (ppm)

0.5 ppm

No

0.00 to 0.00

0.0

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00000610

VOC (ppm)

0.5 ppm

No

0.00 to 0.06

0.0

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00001706

VOC (ppm)

0.5 ppm

No

0.00 to 0.43

0.3

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00001708

VOC (ppm)

0.5 ppm

No

0.00 to 0.00

0.0

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00001709

VOC (ppm)

0.5 ppm

No

0.00 to 0.01

0.00

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00001712

VOC (ppm)

0.5 ppm

No

0.00 to 0.00

0.00

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00001713

VOC (ppm)

0.5 ppm

No

0.16 to 0.21

0.19

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

Yes*

0.0 to 0.5

0.2

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00002175

VOC (ppm)

0.5 ppm

No

0.00 to 0.01

0.00

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00002653

VOC (ppm)

0.5 ppm

No

0.00 to 0.00

0.00

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00002654

VOC (ppm)

0.5 ppm

No

0.00 to 0.00

0.00

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00002656

VOC (ppm)

0.5 ppm

No

0.00 to 0.00

0.0

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.1

0.0

HCN (ppm)

1 ppm

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00002928

VOC (ppm)

0.5 ppm

No

0.00 to 0.00

0.00

CO (ppm)

9 ppm

No

0.00 to 0.00

0.0

H2S (ppm)

0.1 ppm

No

0.0 to 0.0

0.0

LEL (%)

>5%

No

0.0 to 0.0

0.0

AreaRAE Pro
S/N: W01A00002929

VOC (ppm)

0.5 ppm

No

0.00 to 0.00

0.00

See notes on last page.


-------
DRAFT Table 1
Continuous Air Monitoring Results
East Palestine Derailment Site
East Palestine, Columbiana County, Ohio

Monitoring Period: 02/10/2023 09:56 to 02/11/2023 15:40

Notes:

* A secondary instrument was used to evaluate H2S and reported H2S as non-detected. The elevated H2S measurements are likely attributable to sensor drift. The
H2S sensor was recalibrated.

Air monitoring measurements have been averaged over a 8-hour time period and summarized above.

Start and stop times for each air monitoring instrument varies. The monitoring period is based on the earliest start time and latest stop time out of all units.
Air monitoring is not performed during inclement weather conditions/rain and thunderstorms.

< - Less than
> - Greater than
% - Percent

CO - Carbon Monoxide

HCN - Hydrogen Cyanide

H2S - Hydrogen Sulfide

LEL - Lower Explosive Limit

02- Oxygen

ppm - Parts per million

S/N - Serial number

VOC - Volatile organic compounds


-------
Little f
"h

°ute..,

Old'Eno

Darlington Twp

Jimtown

State
Gameiands No
285

Cannsltnn

Site

Location

TETRA TECH

Reference Map

Legend

H Continuous Air Monitoring Location
Derailment Location
One Mile Radius

Prepared For: EPA

Prepared By: Tetra Tech Inc.

East Palestine Derailment ER Site
75 E Main St
East Palestine, Columbiana County, OH 44413

Figure 1

Continuous Air Monitoring Stations

Date Saved: 2/11/2023


-------